f5;
-7.a,c w g
4 UNITED STATE 3 g
j NUCLEAR REGULATORY COMMISSION l
WASHINGTON, D.C. 2066H001 February 10, 1997 Mr. Andrew Pike President Ellis & Watts Division of Dynamics Corporation of America 4400 Glen Willow Lake Lane Batavia, OH 45103 1
SUBJECT:
NRC INSPECTION REPORT 99901308/96-01 AND NOTICE OF VIOLATION AND NOTICE OF NONCONFORMANCE
Dear Mr. Pike:
On December 6, 1996, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Ellis & Watts (E&W) facility.
The enclosed report presents the results of that inspection.
The inspection was conducted to ascertain specific attributes and implementation of your quality assurance (QA) program, and whether licensees effectively monitored your control of quality for safety-related heating ventilation and air conditioning (HVAC) systems and associated spare parts purchased by licensees for nuclear power plants.
We assessed your commercial-grade dedication activities, your screening of issues for Part 21 applicability, and your monitoring of the control of quality by your subvendors.
During this inspection, the NRC inspector determined that certain of your activities appeared to be in violation of NRC requirements.
Specifically, you failed to adopt appropriate procedures to ensure the evaluation and proper reporting of deviations, as required by 10 CFR Part 21.
In your December 30, 1996, letter to the NRC, you reported taking appropriate corrective actions to address evaluation of deviations, including requiring pertinent training for appropriate employees.
No further response is required.
In general, the QA manual and procedures were adequate, and your staff competent. However, the NRC inspector determined that the implementation of your quality assurance program did not meet certain NRC requirements imposed on you by your customers.
Specifically, you did not verify the adequacy of design of certain HVAC components and spare parts supplied to licensees, and take effective corrective actions for deficiencies in your commercial-grade dedication program, as required by 10 CFR Part 50, Appendix t,.
These nonconformances are cited in the enclosed Notice of Nonconformance (NON), and the circumstances surrounding them are described in detail in the enclosed report.
You are requested to respond to the nonconformances and' c,
should follow the instructions specified in the enclosed NON when p/
your response.
9702130290 970210 99901308 PDR y:
hfh
]UIhh PDR GA999 ENVDYNAM
\\
\\
- )P ).
g ff 70 /36 J'
b I' ' 3 i
l A. Pike i-In addition, the inspector determined that licensee monitoring of your quality assurance program and commercial-grade dedication activities was adequate and effective.
Licensees indicated that they continue to have concerns regarding your validation of certificates of conformance and certified material test reports.
Lack of validation during. dedication could result in unqualified HVAC equipment or spare parts. Reassessment of dedication activities appears warranted.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document l
Room.
I j
Sincerely, ORIGINAL SIGNED BY i
Robert M. Gallo, Chief i
Special Inspection Branch j
Division of Inspection and Support Programs
~
Office of Nuclear Reactor Regulation Docket No. 99901308 4
J
Enclosures:
1.
Notice of Nonconformance j
3.
Inspection Report 99901308/96-01 cc:
See next page 4
i Distribution 8
PSIB R/F j
JTWiggins, RI DBrinkman, NRR, PDI-2 4
i Central Files JJaudon, RII l
JWilliams, NRR, PDII-3 j
PUBLIC 3
GEGrant, RIII Docket Files l
TPGwynn, Region IV 3
CPatel, NRR, PDIV-1 i
TPolich, NRR, PDIV-1 JLieberman, OE ETBaker, NRR
]
DOCUMENT NAME: G:\\GAUTAM\\E&W
- Ste previous [:o
,p3urrence Ta receive a oopy of,,
. Indoets in the box: "C" = Copy t
osures *E" = Copy with 6nclosures *N* = No copy 0FFICE PSIB riw PSIS:JGPM INIA 5ISP O
l l
NAME A9tia'utas: sap
- GCCWTiWt RMGal1o-
~
DATE 01/15/97 0l$7/97 02/ 10 /97 0FFICIAL RECORD COPY j
I A. Pike !
In addition, the inspector determined that licensee monitoring of your quality assurance program and commercial-grade dedication activities was adequate and effective. Licensees indicated that they continue to have concerns regarding i
your validation of certificates of conformance and certified material test reports.
Lack of validation during dedication could result in unqualified HVAC equipment or spare parts.
Reassessment of dedication activities appears i
warranted.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC's Public Document Room.
Sincerely, ORIGINAL SIGNED BY Robert M. Gallo, Chief Special Inspection Branch Division of Inspection and Support Programs Office of Nuclear Reactor Regulation i
Docket No. 99901308
Enclosures:
1.
Notice of Nonconformance 3.
Inspection Report 99901308/96-01 cc: See next page Distribution PSIB R/F JTWiggins, RI DBrinkman, NRR, PDI-2 Central Files JJaudon, RII JWilliams, NRR, PDII-3 PUBLIC GEGrant, RIII Docket Files TPGwynn, Region IV CPatel, NRR, PDIV-1 TPolich, NRR, PDIV-1 JLieberman, OE ETBaker, NRR DOCUMENT NAME: G:\\GAUTAM\\E&W I
- See previou
- on rrence Ts receive a copy o ment, indicate in the boa:
- C" = Copy osures *E* - Copy with enclosures *N*
= No copy 0FFICE PSlB:flW l
PSIS:JfGPM MIA;UISP l (D.
l l
l 1
NAME A9Gautam:smp*
GCC#1DP R16al1o
~
l DATE 01/15/97 01 /17/97 02/ 10 /97 1
0FFICIAL RECORD COPY
l * 'A.
Pii@ '
In general, the QA manual and procedures were adequate, and your staff competent.
NRC inspector determined that the implementation of your quality assurance program, However did not meet certain NRC requirements imposed on you by your customers.
Specifically, you di'd not verify the adequacy of design of certain HVAC components and spare parts supplied to,d 1
licensees, and take effective corrective actions for deficiencies in your commercial-grade de i
as required by 10 CFR Part 50, Appendix B.
/
1
/
1 These noncompliances are cited in the enclosed Notice of Nonconformance (NON), and the 1
4 i
circumstances surrounding them are described in detail in the enclosed,r'eport.
You are i
requested to respond to the nonconformances and should follow the inst' ructions specified in the l
cnclosed NON when preparing your response.
/
1
/
In addition, the inspector determined that licensee monitoring of your quality assurance program and commercial-grade dedication activities was adequate'and effective.
Licensees
]
indicated that they continue to have concerns regarding your, validation of certificates of conformance and certified material test reports.
Lack of validation during dedication could 1
2 result in unqualified HVAC equipment or spare parts. Your/ reassessment of dedication l
activities would help preclude problems in this area.
f l
/
In accordance with 10 CFR 2.790 of the NRC's " Rules of' Practice," a copy of this letter and its i
enclosures will be placed in the NRC's Public Docume,nt Room.
/
Sincerely,
/
i
/
l RobertM.Gallo/ Chief Special Inspect' ion Branch j
Division of Irispection and Support Programs Office of Nyclear Reactor Regulation
/
l Docket No. 99901308
/
/
i
Enclosures:
1.
2.
Notice of Nonconformance 3.
Inspection Report /99901308/96-01 cc: See next page Distribution PSIB R/F
/ ((d JTWi insr R s
(D in, man,_NR g y >y L
.lt 1 Mentral Fi es
/i a
JJaudon, RIT f/
JWilliams, L L
/
A, PUBLIC
/
> /f N GEGrant, RIII I
Docket Files TPGwynn, Regio IV TPolich, NRR DOCUMENT NAMit: C:\\GAUTAM\\E&W Ts receive a copy of egt, indicate in the box: 'C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PSIB/blSfL4 l PSI $1D)$P le OE N A
PSIB: DISP l l
NAME ASGautam:smp GCfwllina K
RMGallo DATE 01//9/97 01//7/97 Olf
/97 N 01/ /97 0FFICIAL RECORD COPY
i a-cc:
l Mr. Craig Hunt Manager, Quality Assurance i
Ellis & Watts i
Division of Dynamics Corporation of America 4400 Glen Willow Lake Lane Batavia, OH 45103 Mr. William Sidberry Ms. R.G. Newsome l
Senior Analyst Carolina Power & Light Company P.O. Box 1551 Raleigh, NC 27602 4
i Mr. James Johns i
Supervisor, Quality Services Duquesne Light Company P.O. Box 4 Shippingoort, PA 15077 4
Mr. Danny Leigh 4
i Plant Overview Supervisor Texas Utilities Electric Company i
Energy Plaza 3
1601 Byran Street, 12th Floor l
Dallas, TX 75201-3411 4
Mr. Tim Abney Regulatory Processing Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801