Forwards Safety Evaluation Concluding That Breakout of Spirit Lake Would Not Affect Safe Operation of Plant.Outlet Tunnel Constructed to Reduce Threat of Potential Debris Dam Failure & Breakout of Lake
ML20132D304
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 07/16/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20132D308 List:
References
TAC-49636, TAC-57971, NUDOCS 8507310282
Download: ML20132D304 (2)


Text

I

(

July 16, 1985 a M, DISTRIBUTION:

Docket No. 50-344 DOCKt.1 FILE -

PMKreutzer NRC PDR ACRS(10)

L PDR Gray File ORB #3 Rdg Mr. Bart D. Withers HThompson Vice President Nuclear OELD Portland General Electric Company EJordan 121 S. W. Salmon Street BGrimes Portland, Oregon 97204 JPartlow LLazo

Dear Mr. Withers:

SUBJECT:

SAFETY EVALUATION - SPIRIT LAKE / TROJAN PLANT FLOODING Enclosed is the staff's Safety Evaluation addressing the effects of a breakout of Spirit Lake on the Trojan Plant.

Our conclusion that a breakout of Spirit Lake will not affect the safe operation of Trojan is based on a U.S. Geological Survey entitled, " Impact on the Columbia River of an Outburst of Spirit Lake," and a report entitled, " Analysis of Flood Level at Trojan Plant Associated with Hypothetical Failure of Spirit Lake Block-age," by PGE consultants, Simons, Li and Associates, Inc.

A permanent Spirit Lake outlet tunnel has been constructed to lower the Lake level and thus reduce the threat of a potential debris dam failure and breakout of Spirit Lake and the concern of potential flooding of the Trojan Plant.

It is expected that Spirit Lake will be drawn down to a level where the debris dam is stable by September 1985.

In the interim, the USGS and PGE studies provide in-formation that indicates that even if Spirit Lake did break out, the resultant flood level in the Columbia River at the Trojan Plant would not rise as high as plant grade even if the breakout occurred coincident with a 100 year flood dis-charge in the Columbia River.

Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

Safety Evaluation cc: See next page

  • See previous concurrence page

,, fy ORBf3:DL*

ORB #3:DL*

ORBf%:pt PKreutzer Llazo:dd EJButcher 7/9/85 7/10/85 7/A/85 8507310202 050716 DR ADOCK 0500 4

f

'D 6 f c,l k DISTRIBUTION:

Docket No. 50-344 DOCKET FILE PMKreutzer NRC PDR ACRS (10)

L PDR Gray File ORB #3 Rdg Mr. Bart D. Withers HThompson Vice President Nuclear OELD Portland General Electric Company EJordan 121 S. W. Salmon Street BCrimes Portland, Oregon 97204 JPartlow Llazo

Dear Mr. Withers:

SUBJECT:

SAFETY EVALUATION - SPIRIT LAKE / TROJAN PLANT FLOODING Enclosed is the staff's Safety Evaluation addressing the effects of a breakout of Spirit Lake on the Trojan Plant.

Our conclusion that a breakout of Spirit Lake will not affect the safe operation of Trojan is based on a U.S. Geological Survey entitled, " Impact on the Columbia River of an Outburst of Spirit Lake," and a report entitled, " Analysis of Flood Level at Trojan Plant Associated with Hypothetical Failure of Spirit Lake Block-age," by PGE consultants, Simons, Li and Associates, Inc.

A permanent Spirit Lake outlet tunnel has been constructed to lower the Lake level and thus reduce the threat of a potential breakout of Spirit Lake and the con-cern of potential flooding of the Trojan Plant.

It is expected that Spirit Lake will be drawn down to a safe level by September 1985.

In the interim, the USGS and PGE studies provide information that indicates that even if Spirit Lake did break out, the resultant flood level in the Columbia River at the Trojan Plant would not rise as high as plant grade even if the breakout occurred coincident with a 100 year flood discharge in the Columbia River.

Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

Safety Evaluation cc: See next page ORB #3:DL ORB #3:0 y ORB!3:DL Pyfquper Llazo:dd EJButcher 7/ej/85 7/IO/85 7/ /85

.