TAC:57971
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
| From | |
MONTHYEARML20132D3111985-07-16016 July 1985
[table view]Safety Evaluation Concluding That Breakout of Spirit Lake Would Not Affect Safe Operation of Plant.Outlet Tunnel Reduces Threat of Breakout.Two Map Diagrams Encl ML20132D3041985-07-16016 July 1985 Forwards Safety Evaluation Concluding That Breakout of Spirit Lake Would Not Affect Safe Operation of Plant.Outlet Tunnel Constructed to Reduce Threat of Potential Debris Dam Failure & Breakout of Lake ML20141E8951986-04-10010 April 1986 Forwards NRC Review of Us Army Corps of Engineers Study Re Possible Flood Levels at Facility.Study Showed Higher Flood Levels than Design Basis Flood Level.Permanent Flood Protection Unnecessary.Alternative Measures Suggested 1985-07-16 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:57971&oldid=3365776"