DUKE POWER GOMPANY P.O. Box 33180 CliAHLOTTE, N.C. 28242 HAL B. TUCKER TER.EPHONE vma emesmen. (704) 373-4531 mm. e- m August 3, 1984 Mr. llarold R. Denton, Director Office of Nuclear Reactor Regulation U._ S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

As requested by the NRC Staff during the 10 CFR 50, Appendix R review of Catawba, Duke Power Company has evaluated the minimum shift crew require-ments of Technical Specification 6.2.2 and concluded that sufficient manpower is available on-site to perform the required manual operations in a timely manner t.o achieve safe hot standby conditions without reliance on fire brigade members.

Very truly yours, dY 9 Hal B. Tucker ROS: sib cc: Mr. James P. O'Reilly, Regional Administrator Mr. Jesse L. Riley U. S. Nuclear Regulatory Commission Carolina Environmental Study Group Region II 854 Henley Place 101 Marietta Street, NW, Suite 2900 Charlotte,' North Carolina 28207 Atlanta, Georgia 30323 NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 K Palmetto Alliance 21351 Devine Street I I Columbia, South Carolina 29206 s40e070351 e40803 p

p. ADOCK 05000413 a PDR _