IR 05000416/1993001

From kanterella
(Redirected from ML20128D113)
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-416/93-01 on 930111-15. (Ref 10CFR73.21).Major Areas Inspected:Mgt Support,Security, Program Plans,Protected & Vital Area Barriers & Detection & Assessment Sys
ML20128D113
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/02/1993
From: Mcguire D, Stansberry W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20128D068 List:
References
50-416-93-01, 50-416-93-1, NUDOCS 9302100052
Download: ML20128D113 (1)


Text

. .._ _ _ .- . . . . . _ ..

'

,

.

/ m SAFEGUARDS INFORMATION'

UNITED STATES

'

M jk NUCLEAR REGULATORY COMMISSION

-[, o- REGION H

$ $ 101 MARIETTA STREET,N.W.

a ? * ATLANTA, GEORGI A 30323

_

.....

Report No.: 50-416/93-01-

~

Licensee: Entergy Operations, In Jacksor , MS 39205

, Docket No.: 50-411- License No.: NPF-29  ;

Facility'Name: Grand: Gulf 9 q-Inspection Condueled: January 11-15, 1993

'

Inspector: h[/

sW. W. Sta b rry

~

/

afeguards Inspecto_r IIaund/6f '

Dates $fntd-Approved by: -

-t.#~ 2k3~ ;I

.

LT. W. 'McGuire, Chief 4) ate Signed Safeguards Section- _ _ .. . ,

. Nuclear Mat arial Safety and Safeguards Branch

' Division of Radiation-Safety and Safeguards

-

SUMMARY

, Scope:

f-

- This routine, unannounced inspection was conducted-in the areas of the P_hysical Security Program for Power Reactors.- Specific- areas Levaluated. were as follows
Management Support;- Security: Program Plans; Protected and . Vial-i; - Area Barriers,-Detection and Assessment Systems; Protected and Vital: Area-

-

Access Controls;' Alarm Stations and Communications; Power Supply;' Testing, Maintenance and Compensatory Measures; and. Security Training and

,

Qualification.

3 Results:-

. . .

4 In the areas inspected, violations or deviations were not identified; Ora Unresolved Open Item (92-11-01) was closed.(see Paragraphs 12c'and 3)

Four is:;ues as a result of: this inspection were discussed _with the licensee-r during the inspection and at the exit-(see Paragraph 4)~. The. issues-involved the' assessment-aids,: lighting, door maintenance,7 and : badge display-(see Paragraphs 12e, f and i). Otherwise, the licensee continues to provide

. - adequate protection of vital plant resources'. .The inspector foundLthe

. 'following areas more than adequate; personnel access control, protected area upgradeiprogram, and. duty performance of security' personne _

,

'Occurnent transmitted herewith -

cmitekts senutive un i ~ ~ctusirted -

'**a 3 ~ % -ice e -

'. 9302100052 PDR 930202 G ADOCK 050004161 o PDR '

. . .