U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-440/85024(DRSS)
Docket No. 50-440 License No. CPPR-148 Licensee:
Cleveland Electric Illuminating Company Post Office Box 5000 Cleveland, Ohio 44101 Facility Name:
Perry Nuclear Power Plant, Unit 1 Inspection At:
Plant Site Inspection Conducted:
May 13-17, 1985 Date of Last Physical Security Inspection:
February 20-22, 1985 Type of Inspection: Announced, Preoperational Physical Security Inspectors: %k NW R. Kniceley Date s.
Physical Security Inspector
}.(.
h (,kt M T. J. Madeda
Date Physical Security Inspector
<
Approved By:
T @-
$^
J. R. Creed, Chief Date
"
Safeguards Section Inspection Summary Inspection Conducted on May 13-17, 1985 (Report No. 50-440/85024(ORSS))
Areas Inspected:
Included a review of the status of implementation; installation; operability of the security program and the preoperational testing program for security-related equipment.
Specifically, the inspection covered:
Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Areas; Physical Barriers - Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; 8507020178 850618
'I-
'"' contains
'
PDR ADOCK 05000440 It'FCP.MATI0!t
"
~
G PDR
,
, :1 this
~ _ wa i l...i
[
_e
-
j.
..
Access Control - Package; Access Control - Vehicles; Detection Aids -
Protected Areas; Detection Aids - Vital Areas; Alarm Stations; Communications; Personnel Training and Qualifications - General Requirements; Safeguards Contingency Plan Implementation Review; Safeguards Information and Independent Inspection Effort.
This inspection involved 68 inspection-hours by two NRC inspectors.
Results:
Based on the preoperational inspection, the inspectors determined the status of the security program and identified areas that must be completed prior to licensing.
No items of noncompliance were identified.
,