ML20127N768

From kanterella
Jump to navigation Jump to search
Forwards Preoperational Physical Security Insp Rept 50-440/85-24 on 850513-17.No Noncompliance Noted
ML20127N768
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 06/18/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20127N772 List:
References
NUDOCS 8507020170
Download: ML20127N768 (2)


See also: IR 05000440/1985024

Text

M$

,

.

,

p ,a r t'n 3

' A m ^

m m ^ rha B A'f"

v. w s. u t r n U C

IWUnmru m!Ap]a

JUN 18 1965

Docket No. 50-440

The Cleveland Electric Illuminating-

Company

ATTN:

Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the announced preoperational physical security inspection

conducted by Messrs. J. R. Kniceley and T. J. Madeda of this office on

May 13-17, 1985 of activities at Perry Nuclear Power Plant, Unit 1, authorized

by NRC Construction Permit No. CPPR-148 and to the discussion of our findings

with Mr. J. J. Waldron and other members of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Areas examined during this inspection concern a subject matter which

is exempt from disclosure according to Section 73.21(c)(2) of the NRC's

" Rules of Practice," Part 73, Title 10, Code of Federal Regulations.

This information must be handled and protected in accordance with the

provisions of 10 CFR 73.21.

Consequently, our report of this inspection

will not be placed in the Public Document Room.

fh

9

Encio:ure contains

M;,D3 INFCPJmTION

a:m

8507020170 850618

{i

aration this

gDR

ADOCK 050

40

SD; controlled

stroonone vanurmN

_ , _ .. _

,.

.......,.-

'D

,

-

(sacryst i A 7 Te

i rnnasaTins

-

LEias mu VI 1

L'/V

1 I VH Ffin 5 a v s i

The Cleveland Electric Illuminating

2

JUN 181985

Company

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

u

h.I.Axelson, Chief

L

elear Materials Safety

and Safeguards Branch

Enclosure:

Inspection Report

No. 50-440/85024(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section

IE File

IE/DQASIP/0RP8

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

Enclosure contains

SAFECUARDS INFCFJ1ATION

Upon separatica this

pre is DecontrollM

RIII

RIII

RIII

@l

RIII _

II

RII,

/

qLk

se$dt

4W W

enth/

L

p iG 6

Kniceley/kja

MAdeda

Creed Luc 26

Knop

son

Greenma

//

_ _ g /t, [f-nnaa AT Di g

06/11/85

$f7E@w,,,\\ t Jb I TUnmru

a