GO2-84-171, Annual Environ Operating Rept,1983

From kanterella
(Redirected from ML20115C739)
Jump to navigation Jump to search
Annual Environ Operating Rept,1983
ML20115C739
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/26/1985
From: Martin J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO2-84-171, NUDOCS 8504180528
Download: ML20115C739 (1)


Text

..

ww Washington Public Power Supply System 3000GeorgeWashingtonWay P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 Docket No. 50-397 March 26,1984 G02-84-171 Mr. J. B. Martin, Administrator Region V U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 ANNUAL-ENVIRONMENTAL OPERATING REPORT

Reference:

Facility Operating License NPF-21 Appendix B - Environmental Protection. Plan Section 5.4.1 of the referenced EPP requires submittal of the subject report by May_1 of each year. It also requires that the initial report be submitted prior to May 1 of the year following issuance of the operating license.

The WNP-2 operating license was issued on December 20,1983 and ,

consequently, this report covers the period December 20 through December 31 . During this period-there were no reportable environmental activities. We judge this letter report satisfies the license condition and anticipate a more substantive report for 1984.

Please contact us if you require additional information.

l Very truly you/rs -

kWlaiL -

[D. rtin Plant Manager, WNP-2 JPC/kd cc: Document Control Desk, NRC-D.C.

Executive Secretary, EFSEC m ~

?gh41808c? P s -

gaggg$f b f4V