1994 Annual Environ Operating Rept. W/950331 Ltr
ML17291A716
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/31/1994
From: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-063, GO2-95-63, NUDOCS 9504070111
Download: ML17291A716 (4)


Text

R.IC3R.I"EY PACCELERATED RIDS PROCESSING) 1 REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9504070111 DOC.DATE: 94/12/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME . RECIPIENT AFFILIATION

SUBJECT:

"1994 Annual Environ Operating Rept.>> W/950331 ltr.

DXSTRXBUTION CODE: ZE25D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

NOTES RECIPIENT COPXES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 3 3 PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS '1 1 -FILE CENTER~01 1 1 NRR/ADAR/PDLR 1 1 RGN4 'RSS/RPB 1 1 RGN4 FILE 02 1 1 EXTERNAL: LXTCO AKERS, D 1 1 NRC PDR 1 1 NOTE TO ALL'RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

WASHINGTON PUBLIC POWER SUPPLY SYSTEM

'I'.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 March 31, 1995 G02-95-063 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

WNP-2, OPERATING LICENSE NPF-21 1994 ANNUALENVIRONMENTALOPERATING REPORT This letter is submitted per reporting requirements of Section 5.4.1 of the WNP-2 Environmental Protection Plan (EPP; Appendix B to OL).

No design or operational changes or tests in 1994 involved an unreviewed environmental question. The only proposed change for which an environmental evaluation was prepared was a proposed 4.9% increase in WNP-2 thermal power. This proposal, which requires a change to the operating license, was submitted getter dated July 9, 1993) for review by NRC staff. No non-routine nonradiological reports (within the context of EPP Section 5.4.2) were required for 1994. A summary of the effluent data reported to the State of Washington on the monthly discharge monitoring reports is attached.

Should you have any questions or desire additional information regarding this matter, please call me or D. W. Coleman (509) 377-4342.

J. V. Parrish (Mail Drop 1023)

Vice-President, Nuclear Operations JPC/ml

Attachment:

Table of 1994 effluent data cc: LJ Callan - NRC RIV KE Perkins, Jr. - NRC RIV, Walnut Creek Field Office NS Reynolds - Winston Ec Strawn JW Clifford - NRC DL Williams - BPA/399 JJ Zeller (EFSEC)

NRC Sr. Resident Inspector - 927N 07.U 0.38.,

i(4~

,.R,...

9504070ill 94123i PDR ADQCK, 05000397 PDR

~l

WNP-2 COOLING WATER BLOWDOWN DISCHARGES, 1994 Days of pH TRC Discharge Volume Month Discharge (mg/1) (millions of gallons)

High Total Ave*

30 7.4 8.6 <0.1 104.7 3.49 5.94 Feb 7.6 8.4 s0.1 108.6 3.88 6.98 Mar 31 7.5 8.5 s0.1 134.9 4.35 9.07 Apr 29 7.3 8.8 <0.1 114.3 3.94 6.91 May 27 7.7 8.8 <0.1 58.4 2.16 2.67 Jun 23 7.3 8.2 <0.1 56.2 2.44 2.79 Jul 30 6.7 8.4 <0.1 72.1 2.40 3.46 Aug 31 7.6 8.7 <0.'1 64.8 2.09 5.83 Sep 30 6.9 8.8 46.4 1.55 5.83 Oct 31 6.9 8.7 <0.1 1.80 3.67 55.6'7.5 Nov 30 7.5 8.7 <0.1 1,92 3.89 Dec 31 7.8 s0.1 56.8 1.83 3.46 Permit Limit 6.5 9.0 0,1 5.00 9.40

  • Average daily discharge during the month.
    • Maximum daily discharge during the month.

Supply System Nuclear Plant No. 2 1994 Annual Environmental Operating Report