MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line ML20084Q9241995-06-0505 June 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Request 94-49-0,revising TS Section 3/4.1.5, SLCS to Remove Min Flow Rate Requirement for SLCS Pumps ML20083R0031995-05-19019 May 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Change Request 95-02,revising TS Table 3.3.3-3, ECCS Response Times to Reflect Value of 60 Seconds for HPCI Sys Response Time Instead of 30 Seconds ML20082J4001995-04-0606 April 1995 Application for Amends to Licenses NPF-39 & NPF-85, Consisting of TS Change Requests 94-51 Delete Independent Tech Review Section from TS, 94-52 Delete Nrb Review Section from TS, 94-53 Delete Nrb Audit Section from Ts 1999-09-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F0941999-10-14014 October 1999 Application for Amends to Licenses DPR-39 & DPR-85,to Revise TS Sections 2.2 & 3.0/4.0 to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long-term thermal-hydraulic Stability Solution Hardware ML20216J3341999-09-27027 September 1999 Supplements Application for Amends to Licenses NPF-39 & NPF-45,to Modify Appearance of TS Page 3/4 4-8 as Typo Was Identified in Section 3.4.3.1 of Ts.Corrected TS Page,Encl ML20212H5521999-09-27027 September 1999 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Clarify Several Administrative Requirements,Deleting Redundant Requirements & Correcting Typos ML20212F9521999-09-20020 September 1999 Application for Amend to License NFP-39,requesting Issuance of TS Change Request 98-08-0 Re Increase in Allowable as- Found Main Steam SRV Setpoint Tolerance.Util Had Originally Requested That Subject TS Change Be Deferred in ML20196F5471999-06-22022 June 1999 Application for Amends to Licenses NPF-39 & NPF-85,change Request 99-01-0,to Revise TS to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h ML20195E7521999-06-0707 June 1999 TS Change Request 91-08-01 to License NPF-39,reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 in TS Table 3.6.3-1, Primary Containment Isolation Valves & Associated Notations ML20195G0421999-06-0707 June 1999 TS Change Request 98-09-0 for Licenses NPF-39 & NPF-85, Revising TS Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, by Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8361999-05-26026 May 1999 TS Change Request 99-02-0 for Licenses NPF-39 & NPF-85, Revising TS Section 4.1.3.5.b by Removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & Revising TS Section 3.1.3.5 ML20207L6561999-03-11011 March 1999 TS Change Request 98-07-2 for License NPF-85,revising MCPR Safety Limit Contained in TS Section 2.1, Safety Limits. Proprietary & non-proprietary Info Re Cycle Specific SLMCPR for Lgs,Unit 2 Cycle 6,encl.Proprietary Info Withheld ML20199G1651999-01-12012 January 1999 TS Change Request 98-08-0 to Licenses NPF-39 & NPF-85, Proposing Rev to TS Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2.Supporting TSs & Proprietary & non-proprietary Trs,Encl.Proprietary Info Withheld ML20199A6861999-01-0404 January 1999 TS Change Request 97-01-01 to Licenses NPF-39 & NPF-85, Revising Administrative Section on Controlled Access to High Radiation Areas & Rept Dates for Listed Repts ML20155H6311998-10-30030 October 1998 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS Surveillance Requirements 4.8.4.3.b.1,4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8781998-10-15015 October 1998 TS Change Request 97-04-0 to Licenses NPF-39 to NPF-85, Adding New TS Section & TS Bases Section to Incorporate Special Test Exception to Allow Rc Temp Greater than 200 F During IST & Hydrostatic Testing ML20151Z4541998-09-14014 September 1998 TS Change Request 98-04-2 to License NPF-85,revising TS Table 4.4.6.1.3-1 Re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules.Ge Rept GE-NE-B1100786,encl ML20151V0731998-09-0404 September 1998 TS Change Request 96-23-0 to Licenses NPF-39 & NPF-85, Revising TS Pages to Ensure Fidelity Between TS Pages & 970324 Submittal ML20236L5151998-07-0202 July 1998 Supplemental Application for Amend to Licenses NPF-39 & NPF-85,consisting of TS Change Request 96-06-0,modifying Appearance of Unit 1,FOL Page 8 ML20247M6891998-05-14014 May 1998 Amend 128 to License NPF-39,documenting NRC Staff Approval of Implementation of Plant Mod to Support Installation of Replacement Suction Strainers for ECCS at Plant,Unit 1 ML20217Q5001998-05-0404 May 1998 Amend 127 to License NPF-39,revising Minimal Critical Power Ratio Safety Limits for Operation Cycle 8 ML20217M0731998-03-31031 March 1998 Amends 125 & 89 to Licenses NPF-39 & NPF-85,respectively, Revising LGS Units 1 & 2 TS Section 4.0.5 & Bases Sections B 3/4.4.8 Re Surveillance Requirements Associated W/Isi & IST ML20202G7591998-02-0909 February 1998 Application for Amend to License NPF-39,revising TS Section 2.1, Safety Limits, to Revise Minimum Critical Power Ratio Safety Limit.Proprietary Supporting Info Withheld (Ref 10CFR2.790) ML20199G7701998-01-27027 January 1998 Application for Amends to Licenses NPF-39 & NPF-89,removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from Ts.Change Request 98-01-0 & marked-up TS Encl ML20198M7551998-01-12012 January 1998 TS Change Request 97-02-1 to License NPF-39,revising TS Table 4.4.6.1.3-1 to Change Withdrawal Schedule for First Capsule to Be Withdrawn from 10 Effective Full Power Yrs to 15 Efpy.Ge Rept GE-NE-B1100786-01,Rev 1 Encl ML20212D1761997-10-24024 October 1997 Application for Amend to License NPF-39,revising TS Section 3/4.1.3.6,to Exempt Control Rod 50-27 from Coupling Test for Remainder of Cycle 7,provided Certain Conditions Are Met ML20216H0931997-09-0808 September 1997 Application for Amends to Licenses NPF-39 & NPF-85, Supplementing Changes Request 96-06-0 by Adding Three Addl TS Pages Containing Typo Errors Discovered Since 970225 Submittal ML20210T9141997-09-0202 September 1997 TS Change Request 96-20-0 to Licenses NPF-39 & NPF-85, Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8,re SRs Associated W/Isi & Inservice Testing of ASME Code Class 1,2 & 3 Components ML20137X7931997-04-0909 April 1997 TS Change Request 96-24-0 to Licenses NPF-39 & NPF-85, Deleting Requirement to Correct Specific Gravity Values Based on Electrolyte Battery State of Charge ML20137G6611997-03-24024 March 1997 Application for Amends to Licenses NPF-39 & NPF-85,deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Adding SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0861997-02-25025 February 1997 Application for Amends to Licenses NPF-39 & NPF-85, Reflecting Name Change from PA Electric Co to PECO Energy Co ML20135F0911996-12-0606 December 1996 Application for Amend to License NPF-85,revising TS 2.1 to Change Minimum Critical Power Ratio Safety Limit ML20135A3841996-11-25025 November 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20128N7551996-09-27027 September 1996 Application for Amends to Licenses NPF-39 & NPF-85, Requesting Rev to Increase Reactor Enclosure Secondary Containment Maximum Inleakage Rate ML20116L2551996-08-0808 August 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Sections 3/4.3.1,3/4.3.2,3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6161996-08-0505 August 1996 Application for Amend to License NPF-85,revising TS Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E5981996-08-0101 August 1996 Application for Amend to License NPF-85,revising TS Section 3/4.4.4.6 to Reflect Addition of Two Hydroset Curves Effective for 6.5 & 8.5 Effective Full Power Years,To Existing Pressure-Temp Operating Limit for LGS Unit 2 ML20115A9071996-06-28028 June 1996 Application for Amend to Licenses NPF-39 & NPF-85 to Perform Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2441996-05-20020 May 1996 TS Change Request 96-12-0 to Licenses NPF-39 & NPF-85, Revising TS Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Describe,Rhr Sys Shutdown Cooling Mode of Operation ML20117D7451996-05-0303 May 1996 Application for Amends to Licenses NPF-39 & NPF-85,revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5061996-04-25025 April 1996 TS Change Request 95-08-0 to Licenses NPF-39 & NPF-85, Relocating TS 3/4.7.7 Re Traversing in-core Probe LCO ML20101L9111996-03-29029 March 1996 Application for Amends to Licenses NPF-39 & NPF-85, Respectively,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K4801995-12-22022 December 1995 Application for Amend to Licenses NPF-39 & NPF-85,increasing Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20092J3941995-09-18018 September 1995 TS Change Request 95-01-0 to Licenses NPF-39 & NPF-85, Revising TS Table 4.3.1.1-1, RPS Instrumentation SRs to Reflect Change in Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3181995-09-14014 September 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS to Remove Secondary Containment Isolation Valve Tables ML20087C9451995-08-0101 August 1995 TS Change Request 95-12-0 Revising TS Section 3/4.9.1, to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S5981995-07-28028 July 1995 Application for Amends to Licenses NPF-39 & NPF-85,revising TS Table 4.3.1.1-1,to Reflect Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation ML20086U4821995-07-28028 July 1995 TS Change Request 94-28-0 to Licenses NPF-39 & NPF-85, Revising TS SR & Deleting Specific Requirements to Perform Surveillances Prior to Beginning or Resuming Core Alterations or CR Withdrawal Assoc W/Refueling Activities ML20086U4361995-07-28028 July 1995 TS Change Request 95-09-0 to Licenses NPF-39 & NPF-8, Revising Ts,By Deleting Operability & SR Involving Secondary Containment Diffrential Pressure Instrumentation ML20086T6061995-07-28028 July 1995 TS Change Request 95-13-0 of License NPF-39 & NPF-85, Requesting Change to Ts,To Eliminate TS Requirement to Perform 10CFR50,App J,Type C,Hydrostatic Testing on Certain Valves ML20086A1631995-06-23023 June 1995 Application for Amend to License NPF-85,consisting of Change Request 95-07-2,extending AOT to Allow Adequate Time to Install Isolation Valves & cross-ties on ESW & RHRSW Sys to Facilitate Future Insps or Maint ML20085M8811995-06-20020 June 1995 Application for Amend to Licenses NPF-39 & NPF-85,consisting of Change Request 95-06,requesting one-time Schedular Exemption from 10CFR50,App J, Primary Containment Leakage Testing for Water-Cooled Power Reactors ML20085M9171995-06-19019 June 1995 Application for Amend to License NPF-39,consisting of Change Request 95-03,revising TS Section 2.1, Safety Limits, to Change MCPR Safety Limit,Due to Use of GE13 Fuel Product Line 1999-09-27
[Table view] |
Text
_ . . . .. . . .
l
- StationSupportDr-- =:xt 1
a i v
PECO NUCLEAR- eccoc erovc o-oe<
Nuclear Group Headquarters A UMr or PfCO ENrucy 905 chettertxook Boulevard Wayne. PA 19087-5091 June 28,1996 Docket Nos. 50-352 50-353 l
License Nos. NPF-39 NPF-85 U S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
- - Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 95-14-0 Adoption of Performance Based,'10 CFR 50, Appendix J, !
Option B Testing Gentlemen:
PECO Energy Company (PECO Energy) is submitting Technical Specifications (TS)
Change Request No. 95-14-0, in accordance with 10 CFR 50.90, requesting a change to TS (i.e., Appendix A) of Operating License Nos. NPF-39 and NPF-85 for ,
Limerick Generating Station (LGS), Units 1 and 2. j The purpose of this letter is to notify the NRC of PECO Energy's desire to perform containment leakage-rate testing in accordance with 10 CFR 50, Appendix J ,
- "Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," Option B. In addition, PECO Energy proposes TS changes to implement
- the requirements of Option B, performance based testing.
Under a separate cover letter, PECO Energy will also request revisions to a currently approved relief request from the requirements of Section XI of the American Society of Mechanical Engineers (ASME) code, in order to fully implement 10 CFR 50, Appendix J, Option B.
9607090099 960628 : '
PDO ADOCK~05000352' P PDR 1
\ \
.1
. _ _ . - . _ _ . .- __ _ _ . _ ~ _ _ . _ _
l i
a !
I June 28,- 1996 - i
. Page 2 l I
i
. Information supporting the TS Change Request is contained in Attachment 1 to this :
letter, and copies of the marked-up TS pages for the LGS, Units 1 and 2, TS are !
contained in Attachment 2. The TS change information is being submitted under affirmation, and the required affidavit is enclosed. }
I We request that if approved, the TS Change be issued by January 1,1997, and become effective within 30 days of issuance.
l If you have any questions, please do not hesitate to contact us.
Very truly yours,
- O s .
G. A. Hunger, Jr. j Director-Licensing l 1
Enclosure, Attachments j cc- T. T. Martin, Administrator, Region I, USNRC (w/ enclosure, attachments) j N. S. Perry, USNRC Senior Resident inspector, LGS (w/ encl, attachments) l R. R. Janati, PA Bureau of Radiation Protection (w/ enclosure, attachments)
)
i l
I I
l
V *
(
l i -i COMMONWEALTri OF PENNSYLVANIA :
- ss.
?
COUNTY OF CHESTER :: }
l t ,
t D. B. Fetters, being first duly sworn, deposes and says: That he is Vice President of L PECO Energy Company. the Applicant herein; that he has read the enclosed Technical i ' Specifications Change Request No. 95-14-0 " Adoption of Performance Based,10 CFR 50, -l Appendix J, Option B Testing," for Limerick Generating Station, Unit 1 and Unit 2, Facility l Operating License Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the l statements and matters set forth therein are true and correct to the best of his knowledge, j information, and belief. )
O i
~kA id 3
~
)
Subscribed and sworn to before me this c2 day of M 1996.
s ssuc .l.
1 Notary Public Notarial Seal !
n wp.C'ho Co tAy Commission Expires May 17,7099,
, b W Powyk## **:*"10' N " '
i l
~
l ATTACHMENT 1 i
LIMERICK GENERATING STATION i
UNITS 1 AND 2 Docket Nos.
50-352 50-353 License Nos.
NPF-39 NPF-85 l
" Adoption of Performance Based, 10 CFR 50 Appendix J Option B Testing"
- Information Supporting Changes - 7 pages a
a 6
+
E
- n ,-n ,- -
l l
l DISCUSSION AND DESCRIPTION OF THE PROPOSED CHANGES l PECO Energy Company (PECO Energy) is requesting Technical Specifications (TS) ;
changes which will incorporate performance based testing , in accordance with 10 l CFR 50, Appendix J " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," Option B. This option allows utilities to extend the frequencies of the Type A Containment Leak Rate Test (ILRT), and Type B and C i Local Leak Rate Tests (LLRTs) based on the performance and design of the l containment and components. ;
The proposed TS changes were modeled from the TS detailed in NUREG-1433
" Standard Technical Specifications, General Electric Plants, BWR/4" and reviewed by the NRC by letter to the Nuclear Energy institute (NEI) dated November 2,1995.
i Specifically, the test frequencies and testing details will be removed from the TS and I reference will be made to the LGS Primary Containment Leakage Rate Testing i Program (PCLRTP). The testing frequencies will be established through the PCLRTP for each component based on design and previous performance history. The LGS program is in accordance with Regulatory Guide (RG) 1.163, " Performance-Based Containment Leak Test Program" dated September,1995 and NEl guideline document NEl 94-01, Revision 0, " Industry Guideline for Implementing Performance- j Based Option of 10 CFR 50, Appendix J." l in addition, specific paragraph references to 10 CFR 50, Appendix J, will be deleted from the Facility Operating Ucense (FOL), paragraph 2.D, which addressed previous approved exemptions to 10 CFR 50, Appendix J.
TS SAFETY ASSESSMENT The NRC approved for use a performance-based option for containment leak testing when it amended 10 CFR 50, Appendix J (60 FR 49495). In order to adopt the revised regulations, licensees are required to incorporate into their TS, by general reference, the NRC regulatory guide or other plant-specific implementing document used to develop the performance-based leakage testing program. A new Administrative Control subsection (i.e. 6.8.4.g) is proposed to be added to the LGS TS which will establish and maintain a LGS Primary Containment Leakage Rate Testing Program (PCLRTP). The LGS PCLRTP will be in accordance with NRC RG 1.163, and will be based on the criteria contained in NEl document 94-01, Revision 0.
NUREG-1493, " Performance-based Containment Leak Test Program," provides the technical basis for the LGS adoption of 10 CFR 50, Appendix J, Option B. This NUREG concluded that reducing the frequency of Appendix J, Type A tests (ILRTs) from the current three per 10 years to one per 10 years was found to lead to an imperceptible increase in risk. NUREG-1493 includes the results of a sensitivity study performed to explore the risk impact of several alternative leak rate test schedules.
I
The estimated increase in population exposure risk ranged from 0.02% to 0.14%. The risk impact was determined to be very small since Type B and C testing (LLRTs) can j detect a very large percentage of overall containment leakages. The percentage of ;
leakages detected by the ILRT is very small. Past test results experienced at Limerick j Units 1 and 2 concur with these determinations. The NUREG also concluded that the '
overall unit risk is not very sensitive to changes in containment leakage rates. Given j the insensitivity of risk to containment leak rates and the small fraction of leak paths !
detected solely by ILRT, increasing the interval between ILRTs is possible with j minimalimpact on public risk. j I
A risk impact assessment performed by EPRI, as defined in their report EPRI TR- l 104285 " Risk Impact Assessment of Revised Containment Leak Rate Testing l Intervals," dated August 1994, states that an increase from 3 years to 10 years for performance of an ILRT results in a risk impact change of 0.029% for BWR's (less than 1 person-rem). LLRT analysis results also reflect a very small impact to risk; 0.0003-0.0005% for Type B, and 0.002-0.006% for Type C at 60 month intervals.
LLRTs identify the vast majority (97%) of all potentialleakage paths. A review of Type B testing of electrical penetrations and 'O' rings at LGS Units 1 & 2 indicates that leakages through these paths are both infrequent and small. The vast majority of leakage paths are identified by LLRTs of containment isolation valves (Type C tests).
NUREG-1493 concluded that, based on component failure verses time, the performance-based a!tematives to current, local-leakage testing requirements are feasible without significant risk impacts. LGS design and performance is bounded by this study. In addition, this study permits the extension of 25% of test interval for scheduling purposes as allowed by the new 10 CFR 50, Appendix J, Option B. The model indicated that the number of components tested could be reduced by about 60% with less than a three-fold increase in the incremental risk due to containment leakage. Since under existing requirements, leakage contributes less than 0.1 percent of overall accident risk, the overall impact is very small.
A LGS LLRT tracking and trending database has been developed to record performances of Type B and C components. Determination of test intervals will be based on performance results.
The current LGS TS identifies exemptions to 10 CFR 50, Appendix J, which will be addressed as follows:
TS Limiting Conditions for Operation (LCO) 3.6.1.2.b identifies an exemption for separating the Main Steam isolation Valves (MSIV) leakage rate from the combined leakage rate for all penetrations and all valves listed in TS Table 3.6.3-1, and for testing the MSIVs at a lower test pressure (i.e., 22 psig). This exemption will be retained in the LGS Unit 1 and Unit 2 License.
2
TS Surveillance Requirement (SR) 4.6.1.3.a.2 identifies an exemption that allows a 10 psig leak test on containment air lock seats prior to establishing Primary Containment Integrity when the airlock has been used and no maintenance has been performed on the air lock. This alternate test reference is no longer required since NRC RG 1.163 references NEl Guideline 94-01 which allows airlock seals to be tested at a pressure stated in the plant TS (i.e.,
10 psig will be specified in TS Section 6.8.4.g). However, the exemption will be retained in the LGS Unit 1 and Unit 2 Ucense in order to document the lower 1 pressure.
TS SR 4.6.3.5 identifies a Traversing incore Probe (TIP) System explosive (shear) isolation valve surveillance test that ensures that the valve will perform its intended function and exempts it from Type C testing requirements. This ,
SR and exemption will be retained in TS, and in the LGS Unit 1 and Unit 2 Ucenses.
10 CFR 50 Appendix J, Option B, paragraph V.B.1 allows specific exemptions to Option A of the Appendix that were formally approved by NRC per 10 CFR 50.12, to be still applicable to Option B of the Appendix, if necessary. Therefore, paragraph 2.D of the LGS Units 1 and 2 Facility Operating Ucenses (FOL) will be revised to delete the specific Appendix J, paragraphs (i.e., Option A) identified, while still retaining documentation of the original Appendix J exemptions.
TS SR 4.6.1.2 idenOs the use of BN-TOP-1 " Testing Criteria for Integrated Leak Rate Testing of Primary Containment Structures for Nuclear Power Plants: Bechtel Corporation Topical Report" as the methodology for performing ILRTs. NRC RG 1.163 references ANSI /ANS 56.8-1994 " Containment System Leakage Testing Requirements," for technical methods and techniques for performing ILRTs. BN-TOP-1 is not addressed in the NEl guideline or the ANSI standard. The ANSl/ANS method is the industry accepted method and provides the necessary details for conducting the test. Therefore, the LGS commitment to use BN-TOP-1 will be eliminated and will be deleted from the TS. LGS will commit to the guidance provided in ANSl/ANS 56.8-1994 as referenced in RG 1.163.
The PCLRTP will be identified as a program in TS Section 6.8.4.g, and will define the acceptance criteria, test frequencies and other pertinent details.
i 3
l INFORMATION SUPPORTING A FINDING OF NO SIGNIFICANT HAZARDS CONSIDERATION We have concluded that the proposed changes to the Umerick Generating Stabon
- (LGS) Unit 1 and Unit 2 TS which will incorporate the performance-based 10 CFR 50, Appendix J, Option B Testing, do not involve a Significant Hazards Consideration. in support of this determination, an evaluation of each of the three (3) standards set forth in 10 CFR 50.92 is provided below.
- 1. The orooosed TS chanaes do not involve a sianificant increase in the orobability or consecuences of an accident oreviousiv evaluated.
Incorporation of the new 10 CFR 50, Appendix J, Option B at LGS, Units 1 and 2 does not increase the probability of occurrence of an accident previously evaluated. The containment structure including its isolation capability is not an accident initiator.
These changes do not involve any changes to the containment structure, system or components which could increase the probability of occurrence of an accident previously evaluated or act as a new accident initiator.
Implementation of the proposed changes will affect the manner in which these structures, systems, or components (SSCs) are tested; however, the new {
testing schedule is not an initiator of any analyzed event. No equipment !
changes are involved with adoption of Option B; therefore, performance- i based test intervals for Type A, B, and C tests do not increase the probability of occurrence of a malfunction of equipment important to safety previously evaluated. No physical changes are being made to the plant, nor are there any changes being made in the operation of the plant as the result of increasing the test intervals. Additionally, the proposed TS changes will not alter the operation of equipment available for the mitigation of accidents or transients, therefore, this change will not result in any significant increase to 1 onsite or offsite dose previously evaluated. The potential for time-based and activity-based failure mechanisms which could lead to excessive containment ,
leakage has been determined to be minimal. Performance-based test intervals for Type A, B, and C tests will not alter any safety limits which ensure the integrity of fuel barriers, and will not increase the primary containment leakage limits, i Performance-based test intervals for Type A, B, and C leak tests do not l increase the consequences of an accident previously evaluated. NUREG-1493 concluded that reducing the frequency of Type A tests from the current three per ten years to one per ten years was found to lead to an imperceptible increase in risk. NUREG-1493 includes the results of a sensitivity study
- . performed to explore the risk impact of several alternative leak rate test
- schedules. The estimated increase in population exposure risk ranged from
} ,
4
0.02% to 0.14%. The risk impact was determined to be very small since Type B and C testing (local leak rate tests) detect a very large percentage of overall containment leakages. The percentage of leakages detected by Type A tests is very small. Past test results experienced at Umerick Units 1 and 2 concur with these determinations. NUREG-1493 also concluded that the overall unit risk is not very sensitive to changes in containment leakage rates. Given the insensitivity of risk to containment leak rates and the small fraction of leak paths detected solely by the Type A tests, increasing the interval between Type A tests is possible with minimal impact on public risk.
NUREG-1493 also concluded that, based on a model of component failure with time, the performance-based altematives to current, local-leakage testing requirements are feasible without significant risk impact. 'The LGS design and past performance is bounded by the NUREG study. The NUREG model indicated that the number of components tested could be reduced by about 60% with less than a three-fold increase in the incremental risk due to containment leakage. Since under existing requirements, leakage contributes less than 0.1 percent of overall accident risk, the overall impact is very small.
Therefore, the proposed TS changes will not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. The orocosed TS chances do not create the oossibility of a new or different kind of accident from any accident oreviousiv evaluated.
Performance-based test intervals for Type A, B, and C leak tests do not introduce a new or different type of accident or create the possibility of a different type of ma! function of equipment important to safety than previously evaluated. No physical changes are being made to the plant, nor are there any changes being made in the operation of the plant as the result of increasing the test intervals. No new failure modes of plant equipment previously evaluated will be introduced. Additionally, the TS changes will not alter the operation of equipment available for the mitigation of accidents or transients. The safety function of the primary containment will be retained since the containment will continue to provide an essentially leak tight barrier against the uncontrolled release of radioactivity to the environment for postulated accidents previously evaluated.
Therefore, the proposed TS changes will not create the possibility of a new or different kind of accident from any accident previously evaluated.
5
i l ,
l l
l
- 3. The orocosed TS changes do not involve a significant reduction in a maroin of safety.
The margin of safety is not reduced as a result of adopting 10 CFR 50, l Appendix J, Option B. The effect of increasing containment leakage rate testing intervals was evaluated in NUREG-1493 using historical industry !
leakage rate testing results. Performance history at LGS is consistent with the !
conclusions reached in NUREG-1493 and NEl 94-01. The results of the NUREG evaluation conclude that the increased safety risk corresponding to ;
the extended test intervals is small (less than 0.1% of total risk). The revised TS will continue to maintain the allowable leakage rate for the Type A tests. In !
addition, the requirement to perform a periodic general visual inspection of the l primary containment has been maintained at the original interval of three times l in 10 years as part of the performance-based leakage rate testing program.
The risk of a non-detectable increase of primary containment leakage is ;
considered to be negligible due to the conclusion that 10 CFR 50, Appendix J, !
Type B and C testing program will continue to be conducted between Type A tests. A review of previous LGS Type A test results has concluded that the only failure mechanisms are activity-based. There is no indication of time-based failures that would not be identified during the performance of Type B and C tests. Therefore, we have concluded that the proposed adoption of the Option B intervals would not result in a non-detectabla primary containment leakage rate in excess of the allowable value (i.e.,0.5% wt/ day) established by i
the LGS TS.
a The proposed TS will continue to maintain the allowable leakage rate for the combined Type B and C tests. As supported by the findings of NUREG-1493, i the percentage of leakages detected by Type A tests is small (as stated I above) and Type B and C leakage tests are capable of detecting more than !
, 97% of containment leakages and virtually all such leakages are identified by )
local leak rate tests of containment isolation valves. The Type B and C test !
intervals will be established through the PCLRTP for each component based on design and previous LGS test performance history.
Therefore, the proposed TS changes do not involve a reduction in a margin of j safety. l l
4 I
6
INFORMATION SUPPORTING AN ENVIRONMENTAL ASSESSMENT An Environmental Assessment is not required for the TS changes proposed by this request because the requested changes to the LGS, Units 1 and 2, TS conform to the i criteria for " actions eligible for categorical exclusion," as specified in 10 CFR I 51.22(c)(9). The requested TS changes will have no impact on the environment. The proposed TS changes do not involve a Significant Hazards Consideration as discussed in the preceding section. The proposed changes do not involve a significant change in the types or significant increase in the amounts of any effluent that may be released offsite. In addition, the proposed TS changes do not involve a significant increase in individual or cumulative occupational radiation exposure.
CONCLUSION The Plant Operations Review Committee and the Nuclear Review Board have reviewed these proposed changes to the LGS Units 1 and 2 TS, and have concluded that the changes do not involve an unreviewed safety question, and will not endanger the health and safety of the public.