ML20083R003

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-39 & NPF-85, Consisting of Change Request 95-02,revising TS Table 3.3.3-3, ECCS Response Times to Reflect Value of 60 Seconds for HPCI Sys Response Time Instead of 30 Seconds
ML20083R003
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 05/19/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20083R005 List:
References
NUDOCS 9505260288
Download: ML20083R003 (2)


Text

. . _ . . __ . _

3,$ ., 1 -e

%g .

A PECO ENERGY mi a sc;;;;7,,,,,

965 Chesterbrook Doulevard Wayne, PA 19087-5691 May 19,1995 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 i

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 3

Subject:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 95-02 0 Gentlemen:  :

PECO Energy Company is submitting Technical Specifications (TS) Change Request No.  ;

9542 0, in accordance with 10CFR 50.90, requesting an amendment to the TS (Appendix A) of Operating License Nos. NPF-39 and NPF-85 for Umerick Generating Station (LGS), Units 1 and

' 2, respectively. This proposed change will_ revise TS Table 3.3.3-3, ' Emergency Core Cooling System Response Times" to reflect the value of 60 seconds for the High Pressure Coolant Injection (HPCI) system response time instead of 30 seconds as currently specified. Information "

supporting this Change Request is contained in Attachment 1 to this letter, and the proposed replacement pages for the LGS Units 1 and 2 TS are contained in Attachment 2. This information is being submitted under affirmation, and the required affidavit is enclosed.

We request that, if approved, the amendment to the LGS Units 1 and 2 TS be issued by Apri 1, 1996, and become effective within 30 days of issuance.

if you have any questions, please do not hesits.te to contact us.

Very truly yours, i Md- O.

G. A. Hunger, J .,

Director Ucensing Enclosure, Attachments cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosure, attachments)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ enclosure, attachments)

R. R. Janati, PA Bureau of Radiological Protection (w/ enclosure, attachments) 9505260288 950519 PDR ADOCK'05000352 P PDR

~

l

?

I . .

COMMONWEALTH OF PENNSYLVANIA  :

as.

COUNTY OF CHESTER  :

' W. H. Smith, Ill, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the foregoing Application for Amendment of Facility Operating Ucense Nos. NPF-39 and NPF-85 (Technical Specifications Change Request No. 9542-0), to increase the High Pressure Coolant injection system response time from 30 seconds to 60 seconds, at Umerick Generating Station, Units 1 and 2, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.

Vice Presiden Subscribed and swo to before me this } day ofY 1995.

!' %d '

'// Notary Public '

l wc-ma%

T C