Text

Catawba Nuclear Station UFSAR Chapter 18 Appendix 18A. Tables

Catawba Nuclear Station UFSAR Table 18-1 (Page 1 of 3)

Table 18-1. Summary Listing of the Programs, Activities and TLAA Topic Application UFSAR/ITS Location Location Alloy 600 Aging Management Review B.3.1 18.2.1 Battery Rack Inspections B.3.2 ITS SR 3.8.4.4 SLC 16.7-9.2, SLC 16.7-9.4 18.3.1 Borated Water System Stainless Steel B.3.4 18.2.2 Inspection Boric Acid Corrosion Control Program B.3.15 18.2.10 Bottom-Mounted Instrumentation Thimble B.3.5 18.2.3 Tube Inspection Program Chemistry Control Program B.3.6 18.2.4 ITS 5.5.10 ITS 5.5.13 SLC 16.5-3 SLC 16.7-9 SLC 16.8-5 Containment Inservice Inspection Plan - IWE B.3.7 18.2.5 Containment Leak Rate Testing Program B.3.8 ITS 3.6.1 ITS 5.5.2 Control Rod Drive Mechanism Nozzle and B.3.9 18.2.1.2 Other Vessel Closure Penetrations Inspection Program Crane Inspection Program B.3.10 18.2.7 Divider Barrier Seal Inspection and Testing B.3.11 ITS SR 3.6.14.2 Program ITS SR 3.6.14.4 ITS SR 3.6.14.5 Environmental Qualification 4.4 3.11 Fire Protection Program B.3.12 SLC 16.9.1 SLC 16.9.2 SLC 16.9.4 SLC 16.9.5 SLC 16.9.23 18.2.8 Flow Accelerated Corrosion Program B.3.14 18.2.9 Deleted Per 2010 Update Galvanic Susceptibility Inspection B.3.16 18.2.11 Heat Exchanger Preventive Maintenance B.3.17 18.2.12 Activities (05 APR 2015)

Catawba Nuclear Station UFSAR Table 18-1 (Page 2 of 3)

Topic Application UFSAR/ITS Location Location Ice Condenser Inspections B.3.18 ITS 3.6.12.6 18.2.13 Inaccessible Non-EQ Medium Voltage Cables B.3.19 18.2.14 Aging Management Program Inservice Inspection Plan B.3.20 18.2.15 Inspection Program for Civil Engineering B.3.21 18.2.16 Structures and Components Leak-Before-Break 4.7.2 3.9.1 License Renewal Program for High-Range Not Applicable ITS 3.3.1 Radiation and Neutron Flux Instrumentation ITS 3.3.3 Circuits Liquid Waste System Inspection B.3.22 18.2.17 Metal Fatigue 4.3 3.9.1, 3.9.3 Non-EQ Insulated Cables and Connections B.3.23 18.2.18 Aging Management Program Pressurizer Spray Head Examination Not Applicable 18.2.19 Preventive Maintenance Activities B.3.24 18.2.20 Reactor Coolant Pump Flywheel 4.7.1 3.5.1.2.1 Reactor Coolant System Operational B.3.25 ITS 3.4.13 Leakage Monitoring Program ITS 3.4.15 Reactor Vessel Integrity Program B.3.26 18.2.21 Reactor Vessel Internals Inspection B.3.27 18.2.22 Reactor Vessel Neutron Embrittlement 4.2 5.3.3 Selective Leaching Inspection B.3.28 18.2.23 Service Water Piping Corrosion Program B.3.29 18.2.24 Standby Nuclear Service Water Pond Dam B.3.30 ITS SR 3.7.9.3 Inspection Standby Nuclear Service Water Pond Volume 4.7.3 2.4.8 Program Steam Generator Surveillance Program B.3.31 ITS 5.5.9 18.3.2 Sump Pump Systems Inspection B.3.32 18.2.25 Technical Specification SR 3.6.16.3 Visual B.3.33 ITS SR 3.6.16.3 Inspection Treated Water Systems Stainless Steel B.3.34 18.2.26 Inspection (05 APR 2015)

Catawba Nuclear Station UFSAR Table 18-1 (Page 3 of 3)

Topic Application UFSAR/ITS Location Location Underground Inspection of Nuclear Service B.3.35 18.2.27 Water Structures Ventilation Area Pressure Boundary Sealants Not Applicable 18.2.28 Inspection Waste Gas System Inspection B.3.36 18.2.29 (05 APR 2015)

Catawba Nuclear Station UFSAR Table 18-2 (Page 1 of 1)

Table 18-2. Deleted Per 2016 Update.

(09 OCT 2016)