NRC MONTELY OPERATING REPORT SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 N'$
DOCKET NO:
50-361 b*
j UNIT NAME:
SONGS - 2 y
DATE:
November 13, 1995 2H*
COMPLETED BY:
C.
E. Williams
$h TELEPHONE:
(714) 368-6707 n-OPERATING STATUS 04 GG O*
- 1. Unit Name:
San Onofre Nuclear Generating Station, Unit 2 38I3 2.
Reporting Period:
October 1995 Oub
- 3. Licensed Thermal Power (MWt):
3390 3*
4.
Nameplate Rating (Gross MWe):
1127 r
5.
Design Electrical Rating (Net MWe):
1070
- 6. Maximum Dependable Capacity (Gross MWe):
1127
- 7. Maximum Dependable Capacity (Net MWe):
1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 1
9.
Power Level To Which Restricted, If Any (Net Mwe):
NA
- 10. Reasons For Restrictions, IF Any:
NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 745.00 7,296.00 106,993.00
- 12. Fumber Of Hours Reactor Was Critical 745.00 5,176.00 81,950.59 l
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 745.00 4,768.32 80,399.66
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2,440,983.00 15,459,559.00 262,837,414.85
- 17. Gross Electrical Energy Generated (MWH) 851,988.00 5,237,318.00 89,088,817.50
- 18. Net Electrical Energy Generated (MWH) 811,820.00 4,942,468.04 84,506,562.91
- 19. Unit Service Factor 100.00%
65.36%
75.14%
- 20. Unit Availability Factor 100.00%
65.36%
75.14%
- 21. Unit Capacity Factor (Using MDC Net) 101.84%
63.31%
73.82%
- 22. Unit Capacity Factor (Using DER Net) 101.84%
63.31%
73.82%
- 23. Unit Forced Outage Rate 0.00%
1.82%
5.29%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1
-.