Revised Monthly Operating Rept for Sept 1995 for San Onofre Nuclear Generating Station Unit 2
ML20095G427
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/30/1995
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20095G399 List:
References
NUDOCS 9512210012
Download: ML20095G427 (1)


Text

!

NRC MONTHLY OPERATING REPORT i

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 21'U 4 DOCKET NO:

50-361 hhd i

UNIT NAME:

SONGS - 2 y

DATE:

October 13, 1995 4

3*

COMPLETED BY:

C.

E. Williams 00 TELEPHONE: -(714) 368-6707 8-M OPERATING STATUS 04 3

1. Unit Name: ' San Onofre Nuclear Generating Station, Unit 2 G

2.

Reporting Period:

September 1995

3. Licensed Thermal Power (MWt):

3390 t

gua D

4.

Nameplate Rating (Gross MWe):

1127 g

S.

Design Electrical Rating (Net MWe):

1070 a

6. Maximum Dependable Capacity (Gross MWe):

1127 1-

7. Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA i

9.

Power Level To Which Restricted, If Any (Net Mwe):

NA l

10. Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative t

11. Hours In Reporting :eriod 720.00 6,551.00 106,248.00 l
12. Number Of Hours B autor Was Critical 720.00 4,431.00 81,205.51

}

13. Reactor Reserve S1.cdown Hours 0.00 0.00 0.CJ
14. Hours Generator On-Line 720.00 4,023.32 79,654.66
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 i
16. Gross Thermal Energy Generated (MWH) 2,432,846.39 13,018,576.00 260,396,431.85 f
17. Gross Electrical Energy Generated (MWH) 811,878.50 4,385,330.00 88,236,829.50
18. Net Electrical Energy Generated (MWH) 773,582.00 4,130,648.04 83,694,742.91

)

19. Unit Service Factor 100.00%

61.42%

74.97%

l

20. Unit Availability Factor 100.00%

61.42%

74.97%

I

21. Unit Capacity Factor (Using MDC Net) 100.41%

58.93%

73.62%

{

22. Unit Capacity Factor (Using DER Net) 100.41%

58.93%

73.62%

[

23. Unit Forced Outage Rate 0.00%

2.15%

5.34%

i

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i

25. If Shutdown At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior To Commercial Operation) :

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA f

COMMERCIAL OPERATION NA NA 1

l l