Text
!
NRC MONTHLY OPERATING REPORT i
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 21'U 4 DOCKET NO:
50-361 hhd i
UNIT NAME:
SONGS - 2 y
DATE:
October 13, 1995 4
3*
COMPLETED BY:
C.
E. Williams 00 TELEPHONE: -(714) 368-6707 8-M OPERATING STATUS 04 3
- 1. Unit Name: ' San Onofre Nuclear Generating Station, Unit 2 G
2.
Reporting Period:
September 1995
- 3. Licensed Thermal Power (MWt):
3390 t
gua D
4.
Nameplate Rating (Gross MWe):
1127 g
S.
Design Electrical Rating (Net MWe):
1070 a
- 6. Maximum Dependable Capacity (Gross MWe):
1127 1-
- 7. Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA i
9.
Power Level To Which Restricted, If Any (Net Mwe):
NA l
- 10. Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative t
- 11. Hours In Reporting :eriod 720.00 6,551.00 106,248.00 l
- 12. Number Of Hours B autor Was Critical 720.00 4,431.00 81,205.51
}
- 13. Reactor Reserve S1.cdown Hours 0.00 0.00 0.CJ
- 14. Hours Generator On-Line 720.00 4,023.32 79,654.66
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 i
- 16. Gross Thermal Energy Generated (MWH) 2,432,846.39 13,018,576.00 260,396,431.85 f
- 17. Gross Electrical Energy Generated (MWH) 811,878.50 4,385,330.00 88,236,829.50
- 18. Net Electrical Energy Generated (MWH) 773,582.00 4,130,648.04 83,694,742.91
)
- 19. Unit Service Factor 100.00%
61.42%
74.97%
l
- 20. Unit Availability Factor 100.00%
61.42%
74.97%
I
- 21. Unit Capacity Factor (Using MDC Net) 100.41%
58.93%
73.62%
{
- 22. Unit Capacity Factor (Using DER Net) 100.41%
58.93%
73.62%
[
- 23. Unit Forced Outage Rate 0.00%
2.15%
5.34%
i
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior To Commercial Operation) :
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA f
COMMERCIAL OPERATION NA NA 1
l l
1
.