NRC MONTHLY OPERATING REPORT i

SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 I ;21~0 i-EU DOCKET NO:

50-361 r

y UNIT NAME:

SONGS -2 29 DATE:

September 14, 1995

@8 COMPLETED BY:

R.

L.

Kaplan r3*

TELEPHONE:

(714) 368-6834 4

X*

04 OPERATING STATUS GW O"

O h3 1.

Unit Name:

San Onofre Nuclear Generating Station, Unit 2 "a

2.

Reporting Period:

August 1995

3. Licensed Thermal Power (MWt):

3390 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1070

6. Maximum Dependable Capacity (Gross MWe):

1127

7. Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net Mwe):

NA l

10. Reasons For Restrictions, If Any:

NA This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744.00 5,831.00 105,528.00
12. Number Of Hours Reactor Was Critical 744.00 3,711.00 80,485.59

(

13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 3,303.32 78,934.66
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2,497,939.27 10,585,729.61 257,963,585.46
17. Gross Electrical Energy Generated (MWH) 854,462.50 3,573,451.50 87,424,951.00
18. Net Electrical Energy Generated (MWH) 814,211.00 3,357,066.04 82,921,160.91
19. Unit Service Factor 100.00%

56.65%

74.80%'

20. Unit Availability Factor 100.00%

56.65%

74.80%

21. Unit Capacity Factor (Using MDC Net) 102.28%

53.81%

73.44%

22. Unit Capacity Factor (Using DER Net) 102.28%

53.81%

73.44%

23. Unit Forced Outage Rate 0.00%

2.60%

5.38%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shutdown At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1

.