NRC MONTHLY OPERATING REPORT i
SAN ONOFRE NUCLEAR GENERATING STATION, UNIT 2 I ;21~0 i-EU DOCKET NO:
50-361 r
y UNIT NAME:
SONGS -2 29 DATE:
September 14, 1995
@8 COMPLETED BY:
R.
L.
Kaplan r3*
TELEPHONE:
(714) 368-6834 4
X*
04 OPERATING STATUS GW O"
O h3 1.
Unit Name:
San Onofre Nuclear Generating Station, Unit 2 "a
2.
Reporting Period:
August 1995
- 3. Licensed Thermal Power (MWt):
3390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1070
- 6. Maximum Dependable Capacity (Gross MWe):
1127
- 7. Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net Mwe):
NA l
- 10. Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 5,831.00 105,528.00
- 12. Number Of Hours Reactor Was Critical 744.00 3,711.00 80,485.59
(
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 3,303.32 78,934.66
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 2,497,939.27 10,585,729.61 257,963,585.46
- 17. Gross Electrical Energy Generated (MWH) 854,462.50 3,573,451.50 87,424,951.00
- 18. Net Electrical Energy Generated (MWH) 814,211.00 3,357,066.04 82,921,160.91
- 19. Unit Service Factor 100.00%
56.65%
74.80%'
- 20. Unit Availability Factor 100.00%
56.65%
74.80%
- 21. Unit Capacity Factor (Using MDC Net) 102.28%
53.81%
73.44%
- 22. Unit Capacity Factor (Using DER Net) 102.28%
53.81%
73.44%
- 23. Unit Forced Outage Rate 0.00%
2.60%
5.38%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1
.