NRC MONTHLY OPERATING REPORT SAN ONOFRE NUCLEAR CENERATING STATION, UNIT 2 3'U$
DOCKET NO:
50-361 UNIT NAME:
SONGS - 2 U
1 DATE:
August 15, 1995 l
3pa COMPLETED BY:
R.
L.
Kaplan
[
88 TELEPHONE:
(714) 368-6834
[
n-OPERATING STATUS 04 um Co-1.
Unit Name:
San Onofre Nuclear Generating Station, Unit 2 38U 2.
Reporting Period:
July 1995 DMA
- 3. Licensed Thermal Power (MWt):
3390 f
3$
4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe) :
1070 i
- 6. Maximum Dependable Capacity (Gross MWe):
1127
- 7. Maximum Dependable Capacity (Net MWe):
1070
- 8. If Changes occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net Mwe):
NA
- 10. Reasons For Restrictions, If Any:
NA i
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.00 5,087.00 104,784.00
- 12. Number Of Hours Reactor Was Critical 744.00 2,967.00 79,741.59 l
l
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 2,559.32 78,190.66
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 f
- 16. Gross Thermal Energy Generated (MWH) 2,497,939.27 8,087,790.34 255,465,646.19
[
- 17. Gross Electrical Energy Generated (MWH) 852,799.00 2,718,989.00 86,570,488.50
[
- 18. Net Electrical Energy Generated (MWH) 813,752.00 2,542,855.04 82,106,949.91
- 19. Unit Service Factor 100.00%
50.31%
74.62%
l
- 20. Unit Availability Factor 100.00%
50.31%
74.62%
- 21. Unit Capacity Factor (Using MDC Net) 102.22%
46.72%
73.23%
l
- 22. Unit Capacity Factor (Using DER Net) 102.22%
46.72%
73.23%
- 23. Unit Forced Outage Rate 0.00%
3.33%
5.43%
l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)
?
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
{
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved i
.i INITIAL CRITICALITY NA NA I
J INITIAL ELECTRICITY NA NP.
f l
COMMERCIAL OPERATION NA NA j
i 1
!