Text
L.. _.
E
~ ~ '
~
ow -.,
C*
. _ Glen Ellyn. Illinois (LOCATION)
_ADril 19,-1982 (DATE)
-1,_ Ross B. Landsman
, hereby make the following statement to Charles H. Weil
_, who has identified himself to me as an Investigator of the United States Nuclear Regulatory Commission I make this statement freely with no threats or promises of reward having been made to me.
am presently employed by the Nuclear Regulatory Commission as a Civil Engineer Reactor Inspector.
I was recently assi ned to inspect remedial foundation work E
at the Midland Nuclear Power Plant construction site in Midland, Michigan.
On March 10, 1982, I initiated a meeting at the Nuclear Regulatory Commission's headquarters in Bethesda, MD.
The purpose of this meeting was.to discuss the application of quality assurance criteria and procedures to remedial foundation work underway at the Midland site.
During the meeting it was agreed between the Nuclear Regulatory Corraission and the Consumers Power Company that work started before March 10, 1982, would not be included in the remedial foundation work quality assurance program. Work commencing after that date would be included l
in the quality assurance program.
One of the' topics of conversation at the March 10th meeting was the status of the installation of instrumentation to measure the settlement of the Midland Auxiliary Building.
Mr. Al J. Boos, the Bechtel Power Corporation's Assistant Project Manager at Midland, attended the March 10th meeting. During the course of the meeting, Boos made a statement that lead me to believe the instruments had been installed to measure the settling of the Auxiliary Building, and since the instruments were installed the instruments would not have to be included in.
the quality assurance program under consideration for the remedial 'f'oundation work On March 12, 1982, I' participated in a telephone conversation initiated by the Consumers Power Company.
The purpose of this telephone call was to have C_onsumers Power Company identify the. items, either completed or where installation was underway, not included in the quality assurance program for the Midland remedial foundation work.
During the telephone conversation, Al Boos stated, " Gauges, backup gauges, have been procured as non-Q but would be calibrated under a Q program. These are existing dial gauges. Our instrumentation is essentially well-under way. Wiring has been pulled - raceway has been installed."
Based on Boos' statements of March 10 and 12,1982, I understood the instrumentation (i.e. settlement gauges and strain gauges) for the Auxiliary Building settlement monitoring would not be included in the remedial foundation work quality assurance program, as work had begun before March 10, 1982 On March 17, 1982, I was at the Midland site, along with Region III Inspector Ron Gardner, to observe the remedial foundation work.
During the course of the inspection,%grdneran ound cables for the Auxiliary Building settlement ETbeen3p r
nstruments h
without the benefit of quality assurance or quality e
'l
. control.
Later that day, I questioned Mike Schaeffer of the Consumers Power Company Quality Assurance Department about the absence of quality control /
Page 1 of _ 2
- ages, g8g98840718
~
RICE 84-96 h
py
~~
~~
~
~
N~
7
~
l~
Continuntien of Statsment of Rssa B. Landsman, April 19, 1982.
- e. -
quality assuranca for.tha instrumentation in'stallation.
Schaeffer informed me the cable pulling was not' considered to be under the quality assurance program j
for the remedial foundation work. After discussing the cable pulling with
)
Schaeffer, Schaeffer stated the' cable pulling would be stopped since there seemed to be some confusion on the quality assurance status of the cable pulls.
Schaeffer also told me that the installation of the settlement instrumentation for the Auxiliary Building-had be8un on March 11, 1982 On the morning of March 18, 1982, I. observed cable pulling was continuing without quality control / quality assurance, and I informed Mr. Ben W. Marguglio, Consumers
. Power's Director of the Mi<lland Project Quality Assurance Department, of my observations.
Marguglio stated the cable pulling had begun prior to March 10, 1982; therefore,- the cable pulling was not a part of the quality assurance program I
for the remedial foundation work. Also, Marguglio stated it was his understanding that Consumers Power Company Vice President Jim Cook and NRC Region III Director Jim Keppler had previously agreed the Midland project would not be cited by.the NRC for things that were obviously non-Q (not included) under the remedial foundation work quality assurance program.
)
On March 19, 1982, Margoglio informed me that he had stopped the cable pulling because it would'now be considered under the remedial foundation work quality assurance program and quality ass ra ce/ quality control procedures would be developed to control the work.
i
?Y' l
I ave read the foregoing statement consisting of two pages.
I have made any necessary corrections, and I have initialed those corrections.
This statement is the truth to the best of my knowledge and belief.
I declare under the penalty of perjury that the foregoing is true and correct.
Executed on April 19, 1982 at 3 fd e.
(Date)
(Time) tm Subscribed and sworn to before me
/
(5I
"**"#')
8 this 19th day of April Ross B. Landsman, Nuclear Regulatory 19 82 at Ginn Ellyn, Illinois f.
cnmmtesten neefon III. Glen Ellyn, IL.
(Address)
Charles H Nuclear ge. Weil Investi or rulat6ryCommikakonRegionIII.
s Glen Ellyn, Illinois 60137 w
.s w -
- n+-
-' ~
F-0, O
k, James W Cook Vice President - Projects. Engsneenng and Construction oenerse omcas: 1948 West Parnedi Road. Jackson. MI 49201 e (517) 788-0453 April 15, 1982 g
., g,_ } _ y
_.....__ _ g. c I
M.,
4..f.a;
'iL 9/D ff 9 h
-./ 7 k..:.rl e.
r r."t I l
I Harold R Denton, Director Office of Nuclear Reactor Regulation 7 ggjgyg[m l
l j
ip Division of Licensing DEPM3 Filo l 4^-/
US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 MIDLAND SOILS SETTLEMEhT REFERENCE INFORMATION SOURCE COMPILATION FOR SER EVALUATIONS FILE: 0485.16, 0505.16 SERIAL:
16639 In accordance with recent discussions between the NRC's management and Consumers Power Company's management, we are forwarding to the NRC a
(
compilation of the soil-related informational sources available to the Staff for the-Staff's use in' completing its SER evaluations, s
The enclosed document is composed of several separate lists, that is, one for each Standard Review Plan (SRP) pertinent to soils-related issues for Midland, each of which is keyed to the areas of review identified by the individual SRPs. The types of informational sources listed for these SRP's include Consumers' correspondence to the NRC, meetings and meeting summaries, telephone discussions with the Staff and its consultants, Nh technical audits, and hearing testimony transcripts.
We believe that the enclosed compilation of soils-related reference sources lends further support to our conclusion that the safety evaluations related to soils issues can be completed with the inform t. ion already available to the Staff.
.NC/RLT/mkh oc0482-0069a100 gN n
Af f s A LM/[
hie g g v,.C w i o /
m
f.
2 CC Atomic Safety and Licensing Appeal Board, w/o CBechhoefer, ASLB, w/o MMCherry, Esq, w/o i
FPCowan, ASLB, w/o RJCook, Midland Resident Inspector, w/o RSDecker, ASLB, w/o DCFischer, ACRS, w/a SGadler, w/o JHarbour, ASLB, w/o GHarstead, Harstead Engineering, w/a RHernan, NRC, w/a DSHood, NRC, w/a (2)
DFJudd, B&W, w/o JDKane, NRC, w/a FJKelley, Esq, w/o RBLandsman, NRC Region III, w/a WHMarshall, w/o JPMatra, Naval Surface Weapons Center, w/a k0tto, Army Corps,of Engineers, w/o WDPaton, Esq, w/o SJPoulos, Geotechnical Engineers, w/a FRinaldi, NRC, w/a HSingh, Army Corps of Engineers, w/a BStamiris, w/o 6
oc0482-0069a100 u
---m<=~
"* ~ '
s-_.-
. ~.
=--.. -......
ENCLOSURE r
I MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- MIDLAND UNITS 1 AND 2 DOCKET NO 50-329 and 50-330 t
CONSUMERS POWER COMPANY J
I k
h APRIL 14, 1982 d
- NOTE: This is a set of listings of only the reference information for thase sections of the SRPs which relate to soils settlement issues. Other information i
not related to soils issues can be found in the Midland FSAR or in other docketed I
submittals, l'
rp0482-1759fl02 e
b I
'~
4 1
3*
e MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUA' IONS
- STANDARD REVIEW PLAN 2.4.12 i
Groundwater
{
i I.
Areas of Review 50.54(f) Q&R 24 - Shallow groundwater system, permeabilities, impact of water level changes to i
foundation conditions 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring i
50.54(f) Q&R 49 to 52 - Further response to questions on dewatering system design and assumptions and
,1 recharge sources and rates that could impact the system 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results and' proposed continuation of study. NRC meeting summary trans-mitted in NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results, proposed continuation of study, discussion of postulated d
failures and system response alternatives, liquefac-tion protection provided by systems, and other site areas which may not be protected from liquefaction (See NRC meeting summary transmitted in NRC letter of 3/16/82)
II.
SAR 2.4.12.1 Groundwater Description 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Stat! comments on specification for dewatering
- Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.
rp0482-1759d173 q
e--
,-Pe='-
~"
=.-
-...~:.
= -.
2 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wellt 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permaneat l
dewatering wells P
11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.
SAR 2.4.12.2 Groundwater Usage 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 1 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells F
11/12/81 NRC Region III Inspection Report concarning dewatering I
wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 rp0482-1759d102 3
~
TT_TL__.-
I_T L _ l_ _ -_'_?'_'_
~~~
~ ~ ~
~~
^~~
..-- u.
.x
-~~_w.
u N,
- 3 3
7 t
03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.
SAR 2.4.12.3 Protection of Groundwater Users 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-q tion on interceptor back-up sells (Serial 11818) 05/28/81 j
NRC letter with Staff comments on specification for dewatering 2
05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation o'f 44 de-1 watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.
SAR 2.4.12.4 Design Bases for Subsurface Hydrostatic Loadings 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-tion on interceptor back-up wells (Serial 11818) 05/28/81' NRC letter with Staff comments on specification for dewateriag 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) s rp0482-1759d102
,.m e,e-Mp.M
- M
^*' ~'*' ' ' ~
F
- .-.~.
n in...- -. >. -...
I i
i 4
r a
f I
}
'09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells f
09/16/81 CP Co letter with request for installation of 44 de-l watering wells (Serial 13774) 10/22/81 NRC lecter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 06/04/80 US Corps of Engineers report to NRC on Review of i
Geotechnical Aspects of the Seismic Safety o'f Midland Nuclear Plant 03/16/82 Informal transmittal of site boring location draw-ings indicating loose sand layers subject to j
possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities c.
e, rp0482-1759d102
= -
[
~ ~ ~'
~
~. -
. wa
. L --..-.
~. :
}
- :.a.- -.. - u i-1-
j-3 4
1 1
j
[
a
'i MIDLAND SOII.S SETTLEMENT j
REFERENCE INFORMATION FOR SER EVALUATIONS
- 6 STANDARD REVIEW PLAN 2.5.1 Basic Geologic and Seismic Information A
I.2 Seismic Features 50.54(f) Q&R 24 - Shallow groundwater system, permeabilities,. impact of water level changes to foundation conditions
.1 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring
'h 50.54(f) Q&Rs 49 to 52 - Further response to questions on r
dewatering system design and assumptions and recharge sources and rates that could impact the system 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results as. documented in 0
NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction li protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 il s
03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities 4
I.3 Man-Made conditions 5,
50.54(f) Q&R 24 - Shallow groundwater system, Q
permeabilities, impact of water level changes to foundation conditions
- s 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring
.3.
Ytj S
- Note: This is a listing of only the reference information and the subsections p
of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
other information not related to soils issues can be found in the Midland FSAR i,
or in separate submittals, meeting notes, etc.
[f
- t pj rp0482-1759h102 l%
_n m
m, y
p-,
,, 4 y
--<-9.--
_ _. _ ~.. _ _ _ _ _ _ -.. _
~ un u.-: -.__._s 2
g.
t l
2 g
50.54(f) Q&Rs 49 to 52 - Further response to questions on dewatering system design and assumptions and recharge sources and rates that could impact the system 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 t
03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE)
?
r 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities rp0482-1759h102 1
n, -.
- a. l^
.u
~
w
-~'
~~
' ~~
~ ~
'~
~
s
(-.
- MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- STANDARD REVIEW PLAN 2.5.4 Stability of Subsurfa'ce Materials and Foundations I.1.d Unstable Rocks or Soils
- 1 50.54(f) Q&R 24 - Shallow-groundwater system, permeabilities, impact of water level changes to foundation conditions c
50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site Soring location drawings indicating loose sand layers subject to possible 2
liquefaction sent to J Kane (NRO) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of s.ite having potential for liquefaction beneath Category I facilities I.l.f Consolidation and Preconsolidation Pressures and Methods 08/17/81 Soil preconsolidation pressure vs post overburden pressure of the DGB (Serial 13422)
I.2 Static and Dynamic Soil / Rock Properties Underlying Site 11/24/81 Results of soil borings and testing program for Aux Bldg (Part 2) (Serial 14874) a c
11/10/81 Results of soil boring and testing program for the BWST (Serial 14281) 11/06/81 Test results of soil boring and testing program for SWPS (Serial 14280) 09/22/81 Results of soil boring and testing program for Aux Bldg (Part 1) (Serial 13794) 07/31/81 Test results of soil boring and testing program for DGB (Serial 13382) v p
- Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.
rp0482-1759g102 9
.av-
,<-e.
-m,..
w.
m.
~;
. ~.. _
.~_.. -...
j
+
I 2
i
- t
-1 07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340)
(
I.3 Relationship of Foundations and Underlying Materials 11/24/81 Results of soil borings and testing program for Aux Bldg (Part 2) (Serial 14874) 11/10/82 Results of soil boring and testing program for the BWST (Serial 14281) 11/06/81 Test results of soil boring and testing program for SWPS (Serial 14280) 09/22/81 Results of soil boring and testing program for Aux Bldg (Part 1) (Serial 13794) t 07/31/81 i
Test results of soil boring and testing program for DGB (Serial 13382) 07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340)
I.6 Groundwater Conditions and Dewatering 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 50.54(f) Q&R 49 to 52 - Further response to questions on dewatering system design and assumptions and recharge sources and rates that could impact the system 09/11/81 CP Co letter with new settlement plots, Borros Anchor and piezometer plots (Serial 13784) 07/27/81 CP Co letter with revised settlement plots and piezometer plots (Serial 128 9) 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 04/24/81 CP Co response to NRC request,s for additional information on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225)
- j rp0482-1759g102 w.,,,smwwwa&
_ ~ ~,
e
- ~ * - - * * ~
,--w.-
e e
p T--
r w
~; ua a,.--.--a
- o E.
[
h 3
i-E i
jy 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells l
09/16/81 CP Co letter with request for installation of 44 dewatering wells-(Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 5
02/23/82 Meeting concerning recharge test results-as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquezaction l'
protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 I.7 Responses of Site Soils to Dynamic Loadina 03/10/82 Settlement of underground diesel fuel tanks.due to seismic shakedown (Serial 16243) a 6
10/21/81 CP Co letter on remaining NRC concerns for the DGB (Serial 14316)
I.8 Liquefaction 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 3
06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) s 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities 1
rp0482-1759g102 4
,--._s e
m.
c e.
4
---+-g
.-m--,
e w
ese g-.
e.-
-s.,,
pg.---.+v-%-,
w9y y yyg-
--+
9--eryi----.-.ryga-=qw-949 99, 99 gr h--gye-
a.._- a 1._.__. ~..
~~~' ~ ~~
~
~~
F A
3
- f 4
Si =
1 I.10 Founda. tion Material Stability, Deformation and Settlement Under Static b
Conditions 10/21/81 CP Co letter on remaining NRC concerns for the DGB (Serial 14316) 09/11/81 Table of Midland updated marker settlement vs time plots (Serial 13784) 02/23-26/82 Meeting on the Diesel Generator Building and Service Water I;
3
~ Pump Structure as documented in NRC meeting sumerary of 3/12/82 I.11 Criteria and Design Methods for Static and Dynamic Analyses of Foundation Material 07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340) e I,
I.12 Techniques and Specifications to Improve Subsurface Conditions 03/18/82 Surcharge removal for the BWST valve pits (Serial 16559) 01/06/82 Aux Bldg unde.:rpinning freeze wall - effects of the freeze wall on utilities and structures (Serial 15424) 02/04/82 Aux Bldg soil remedial measures access shaft - augering method for soldier pile holes (Serial 15528) 11/16/81 Aux Building - response to NRC questions (Serial 14869) 11/06/81 Response to NRC request for additional information pertaining to the proposed underpinning of the SWPS (Serial 14843) 10/26/81 Surcharge of the BWST foundation (Serial 14591) 01/18-20/82 and NRC audit of the Aux Building 02/01-05/82 03/15-19/82 NRC audit of the SWPS 03/26/82 Telecon closing items on SWPS:
(1) soil spring constants; (2) construction dewatering; and (3) settlement monitoring plans.
o 7
I
(-
c5
)
u rp0482-1759g102 w
~ - -
,-e w
w
. _ _. -. ~,.
-~
~ ~
^
=
.,I.
C i.
I'-
~
MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- 1 STANDARD REVIEW PLAN Section 3.7.1 Seismic Design Parameters
?
I.2 Critical Dampina Values
?
12/14-15/81. Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi, and J Matra 1.3 Supportina Media fer cat I Structures 50.54 (f) Q&R's 12, 24, & 25 03/23/82 Test Results of the Soil Boring and Testing Program for the Retaining Walls (Serial 16573 w/ encl) 11/24/81 Results of Soil Boring and Testing Program for Auxiliary Building (Part 2)(Serial 14874 w/ encl) 11/06/81 Test Results of Soil Boring and Testing Program for the SWPS (Serial 14280 w/ enc 1) 09/22/81 Results of Soil Boring and Testing Program for s
Auxiliary Building (Part 1) (Serial 13794 w/ enc 1) 07/31/81 Test Results of Soil Boring and Testing Program for DGB (Serial 13382 w/2 encl) 07/27/81 Updates of DGB Area Settlement and Piezometer Plots (Serial 12809 w/2 enc 1) 11/10/81 Results of Soil Boring and Test Program for the BWST (Serial 14281 w/3 encl) 10/21/81 Estimates of Relative Density of Granular Fire Materials Under the DGB (Serial 14316 w/8 encl)
I i
1 I:
- NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units I and 2.
Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.
j miO382-0053a100
(
h
-e-,-.
,,mm,....._ y
,,_,w,
,em, p.,
-_m3,m.yy,y4.m-pmm.m.,,,,y,w o-s m g,
y y
p,,ms74,.m3
.. _. ~ -
.~
z.
z! X.c -.__.Tr__
e MIDLAND SOILS SETTLEMENT ~
REFERENCE INFORMATION FOR SER EVALUATIONS
- STANDARD REVIEW PLAN Section 3.7.2 Seismic System Analysis I.1 Seismic Analysis Method 10/21/81 Relative Density and Shakedown Settlement of Sand Under the DGB (Serial 14316 w/8 encl) 12/14-15/81 Hearing transcript testimony of Dr R P Kennedy I.3 Procedures Used for Analytical Modelina Auxiliary Buildina 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi, and J Matra 50.54(f) Q&R 15 01/25/82 NRC letter summarizing 10/2/81 meeting on seismic models for Aux Bldg acd SWPS 03/11/82 NRC letter summarizing 3/8/82 telecon on soil spring stiffnesses for Aux Bldg underpinning and Phase II construction 1
09/30/81 SWPS and Aux Bldg Seismic Models (Serial 14110 w/3 encl)
BWST 12/14-15/82 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi and J Matra 11/24/81 Addendua No 1 to the Design Report for the BWST Foundation Analysis (Serial 14902 w/ encl)
SWPS 12/14-15/82 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi and J Matra 03/02/82 Appendix A: SWPS Three-Dimensional Finite-Element Models (Serial 16352 w/ encl) 4 50.54(f) Q&R 15
- NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
Other information not related to soils issues can be found in the Midland FSAR or in separate submituals, meeting notes, etc.
miO382-0053a100
^ ^ ^ ^ ~ ~ ~ ~
2 01/25/82 NRC letter summarizing 10/2/81 meeting on seismic models for the Aux Bldg and SWPS DGB 01/08/82 Draft testimony of K Wiedner 50.54(f) Q&R 13 10/21/81 Relative Density and Shakedown Settlement of Sand Under the DGB (Serial 14316 v'8 encl)
I.4 Soil-Structure Interaction 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy and Paul Hadala.
50.54(f) Q&R's 13, 15,& 25 I.8 Interaction of Non-Cat I Structures with Cat I 02/23/82 to Meetings in Bethesda as documented in NRC meeting 02/26/82 summary transmitted by NRC letter of 3/12/82 I.11 Methods Used to Account for Torsional Effects 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, J Matra, and F Rinaldi I.13 Analysis Procedure for Damping 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, J Matra, and F Rinaldi miO382-0053a100
~ ~ ~ ~
MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION TOR SER EVALUATIONS
- 9 STANDARD REVIEW PLAN 3.7.3 Seismic Subsystem Analysis I.12 Category I Buried Piping, Tanks, Ducts, etc.
50.54(f) Q&R's 7, 17, 18, 19 & 20 03/16/82 Additional Information Concerning Safety Grade Buried Piping (Serial 16269 )
03/10/82 Settlement of Underground Diesel Fuel Tanks Due to l}
Seismic Shakedown (Serial 16243)
!\\
4
'i i
- NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issucs for Midland Units 1 and 2.
3 :
Other information not related to soils issues can be found in the Midland FSAR
)
or in separate submittals, meeting notes, etc.
miO382-00531100 1
- -~
~
MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- i STANDARD REVIEW PLAN 3.8.4 Other Category I Structures I.2 Applicable Codes, Standards & Specs Auxiliary Buildina & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg 5 FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01-20-82 1
Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann ' Arbor 03/19/82 12/31/81 Draf'. Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant
- Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
Other inforination not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.
rp0482-1759a102
- w..- - - -
u.
- x..
i
-.-,. ~ :
- a..
2 1-i
,T l
1.3 Loads & Load Combinations Auxiliary Building & FIVP 09/30/81 Tecnnical Report on Underpining the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testinoay by Applicant SWPS J
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/82 Draft Testimony by Applicant 4
Dgg j
02/24/82 Draft Testimony by Applicant O
I.4 Design & Analysis A.
Boundary Conditions & Behavior Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) l 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda rp0482-1759a102
.m.,
+.
's a
3 1
03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant 02/24/82 Meeting w/ Staff at Bethesda B.
Transmission of Lateral Loads & OTM Auxiliary Buildina & FIVP
,h 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 1
01/18/82
'j to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS 4
(Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant 02/24/82 Meeting w/ Staff at Bethesda C.
Computer Programs Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Report on Aux Blds - hesults of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ana Arbor 01/20/82 Testimony by Applicant s
rp0482-1759a102
- ~ ~
, ~
~.. -..
~_ ~, ~.. ".
f.*
f k
~
4 y'
SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant f
DGB 02/24/82 Draft Testimony by Applicant 3
D.
Design Report
.l Auxiliary Building & FIVP 09/30/81 Technical Report cu Underpin. ting the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report Aux Bldg - Results of Static Analysis (Serial 14895)
SWPS 4
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352)
E.
Structural Audit Auxiliary Building & FIVP May/82 Forthcoming Audit SWPS 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 I.5 Structural Acceptance Criteria A.
rp0482-1759a102
__7..._
______3
^ ^~
- '~~~ ~
~
~
s 5
Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report Aux Bldg - Results of Static Analysis (Seria). 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant t
SWPS S
^
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) i 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16332) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 te Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant P
DGB 02/24/82 Draft Testimony by Applicant B.
Cracks Issue Auxiliary Building & FIVP 01/25/82 Evaluation of Cracking in the Feedwater Isolation Valve Pits (Serial 15493) 01/29/82 Evaluation of Cracking in the Auxiliary Building Control Tower and Electrical Penetration Areas at Midland Plant (Serial 15:27) 12/10/81 Meeting w/ Staff at Bethesda 01/11/82 Meeting w/ Staff at Bethesda Testimony by Applicant SWPS 03/02/82 Evaluation of Cracking in the Service Water Pump Structure (Serial 16009) 12/10/81 Heeting w/ Staff at Bethesda 01/11/82 Heeting w/ Staff at Bethesda 12/31/81 Draf t Testimony by Applicant rp0482-1759a102
U
. ~.---.
a.
J. -
[ '..
j.,
6 DGB 02/16/82 Evaluation of the Effect on Structural Strength of Cracks in the Walls (Serial 15978) 10/02/81 Adina Concrete Cracking Analysis (Serial 14111) 09/30/81 Meeting w/ Staff at Bethesda 12/10/81 Meeting w/ Staff at Bethesda 01/11/82 Meeting w/ Staff at Bethesda 02/24/82 Meeting w/ Staff at Bethesda I
I.6 Materials, QC, & Spl Constr Technique A.
Materials 5
Auxiliary Buildina & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 4
01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant i
SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 09/17/81 Meeting 'c/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB NA
, B.
Special Construction Techniques Auxiliary Building & FIVP (Includes Const Analysis, Monitoring and Post Tensioning) 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to the Proposed Undarpinning of the Aux Bldg
& FIVP (Serial 14869) 10/01/81 Meeting w/ Staff at Bethesda 11/04/81 Meeting w/ Staff at Bethesda 02/26/82 Meeting w/ Staff at Bethesda rp0482-1759a102
-a
-wa a,
?...... - -.- s g..
I 6(.
7 n
br b
01/18/82 4
to Audit by Staff at Ann Arbor i.
01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 Testimony by Applicant SWPS (Includes Const Analysis, Monitoring and Post Tensioning) j 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the SWPS (Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant j
03/02/82 j
Three-Dimensional Finite-Element Models for the SWPS (Serial 13652)
DGB a
NA
/
rp0482-1759a102 1
- ~
?_.
2, w.
..-_.x.
- _ --~ n m._...
.-.2.~
j-4 MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- STANDARD REVIEW PLAN 3.8.5 Foundations I.1 Description of Foundations Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP i
(Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the Aux Blds & FIVP (Serial 14869) 10/01/81 Neeting w/ Staff at Bethesda 1
11/04/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 Testimony by Applicant Testimony by NRC Staff SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the SWPS (Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 4
02/05/82 Testimony by NRC L
NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
l.
Other information not related to soils issues can be found in the Midland TSAR or in separate submittals, meeting notes, etc.
rp0482-1759b102 a
--- - - - *~' -~'-'-
.-j g-
-.9...
-.-p.,.-
wa 7
.-g g%9,e.,,ep.,
--...9gbw
.,e--,.ewg.-
y.-.e-..y e
i*
l,
?.
2 r
Y MB NA
(
I.2 Applicable Codes, Standards & Specs j
Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110)
(
10/01/81 Meeting w/ Staff at Bethesda 01/18/82 4
to Audit by Staff at Ann Arbor l
01/20/82
$j Testimony by Applicant Testimony by NRC Staff j
SWPS 08/26/81 Techaical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Lethesda Testimony by Applicant 02/05/82 Testimony by NRC D,GB, 02/24/82 Draft Testimony by Applicant I.3 Loads & Load Combinations Auxiliary Building & FIVP o.
09/30/81_ Technical Report on Underpining the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant
~.
t' rp0482-1759b102 7
- =
.~..
. ~-
- a. ?.
(
~*
5 3
t-E I
SWPS I
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) l 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda f
03/16/82 to Audit by-Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant
]
BWST 11/13/81 Design Report for the Borated Water Storage
[
Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda 1
02/23/82 to Meeting w/ Staff at Bethesda 02/26/82 Testimony by Applicant 02/05/82 Testimony by NRC 1
DGB 02/24/82 Draft Testimony by Applicant I.4 Desian & Analysis A.
Boundary Conditions & Behavior Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 1
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda
~,
rp0482-1759b102
+
..w
- v-*
4 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant B_}{ST_
11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC DGB 02/24/82 Draft Testimony by Applicant B.
Transmission of Lateral Loads & OTM Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 t
Testimony by Applicant SkTS 08/26/81 Technical Report on Underpinning the SkTS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SkTS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant rp0482-1759b102
_. ~ _ - - - - - - - - ' - - - ^ - - ' - ' _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ - - - - - - - -
..a :
- '..: z.- ~
. =
.e t
^
ig.
r 5
DGB 02/24/82 Draft Testimony by. Applicant i
C.
Computer Programs r
Auxiliary Building & FIVP 09/30/81-Technical Report on Underpinning the Aux Blds & FIVP (Serial 14110) 12/03/81 Addendum to Report on Aux Blds - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda p
01/18/82 0;
to Audit by Staff at Ann Arbor
(
01/20/82 Testimony by Applicant SWPS i,
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda L
02/23/82 Meeting w/ Staff at Bethesda
,j 03/16/82 to
?
Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339)
Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant D.
Desian Report Auxiliary Buildina & FIVP 09/30/81 Technical Report on Underpinning the Aux Blds & FIVP (Serial 14110) 4 12/03/81 Addendum to Tech Report Aux Blds - Results of Static Analysis (Serial 14899)
SWPS 7,
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 1
,+j rp0482-1759b102 i.
ti O**D'
?:-.
a._...-~.
- ..s 6
u 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352)
BWST 11/13/81 Design Report for the-Borated Water Storage Tank Foundation Analysis (Serial 14339) 11/24/81 Addendum No 1 - Design Report for the BWST Foundation Analysis (Serial 14902)
E.
Structural Audit Auxiliary Building & FIVP May/82 Forthcoming Audit r-SWPS 03/16/82 to Audit by Staff At Ann Arbor 03/19/82 BWST 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 April /82 Forthcoming Audit of Cales I.5 Structural Acceptance Criteria A.
Compliance with ACI Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899)
T 10/01/81 Meeting w/ Staff at Bethesda I-01/18/82 to Audit by Staff at Ann Arbor l
01/20/82 j
Testimony by Applicant I.
SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) t 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda ep0482-1759b102 h
v m-w y
w of----
9
--w,,
7-
+i
-y ev:-
&-T-y
t
. ~J ~ ~ ~ T 7
il 03/16/82 g.
to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BET 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC MB 02/24/82 Draft Testimony by Applicant B.
Factors of Safety-Sliding & OT Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ar.n Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additional Info Pertaining to the Proposed Undeqpinning of the SWPS (Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage I:
Tank Foundation Analysis (Serial 14339) p 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant l'
V f;
rp0482-1759b102 I
i
. '.. '.. - -, ' ~ ~., ~ ~... -
~
~
~.
~
.x u
~,.
e 8
.DGB e
NAf I.6 Materials, QC, & Spl Constr Technique A.
Materials Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda f
01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS i
08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 09/17/81 Meeting w/ Staff at Bethesda 03/16/82
~
to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicaat B.
Special Construction Techniques Auxiliary Building & FIVP (Includes Const Condition Analysis, Monitoring and Post Tensioning) 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the Aux Bldg
& FIVP (Serial 14869) 10/01/81 Meeting w/ Staff at Bethesda 11/04/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 rp0482-1759b102
-v--*-Y"-
" " ' -8
w_.-
s 9
i: ;
[.
03/16/82 l
to Audit by Staff at Ann Arbor 03/19/82 Testimony by Applicant t
SWPS (Includes Const Condition Analysis, Monitoring and Post Tensioning) 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additio'nal Info Pertaining to the Proposed Underpinning of the SWPS (Serial 14843) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) g 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 e
to Audit by Staff at Ann Arbor 03/19/82 12/31/81' Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Heeting w/ Staff at Bethesda Testimony by Applicant 02/23/82 to Meeting w/ Staff at Bethesda 02/26/82 t
P J
w
.i t
l i
rp0482-1759b102 c..
I,
--WMW"
_ - _ -. ~ _. ~ ~. -, _
7
.... ~
g,y a-9
{j' IU.
MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS
- STANDARD REVIEW PLAN 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment I.2.j. Seismic System Analysis for Category I Buried Piping Systet 10/20/80 NRC request for details of stress analyses for underground Pi ing P
11/14/80 CP Co response to request for stress analyses for underground
[
piping (Serial 10113) 12/15/81 CP Co letter w/ enclosed report " Analysis of Buried Piping for
]
Midland" (Serial 15093)
{
02/03/82 Sample cale and Bechtel Design Guide C-2.44 on seismic analysis of underground piping 03/08/82 Informal transmittal to J Kane of service water pipe profile plots and borros anchor plots 03/16/82 CP Co Letter on future monitoring program and ' reinstallation of service water piping (Serial 16269) h 01/20/81 Meeting to review the method of calculations for underground
}
Pi ing P
4 05/04/81 Meeting on fill settlement and stresses in underground piping 10/06/81 Meeting to present CP Co demonstration-type solution on underground piping.
t 01/21/82 Meeting on future monitoring, geotech concerns, and seismic concerns for underground piping 02/05/82 NRC meeting summary for li)/6-7/81 meeting on proposed performance - based acceptance criteria for servi'ce water piping and other piping 02/11/82
,i Meeting to discuss underground piping terminal end analysis, rattlespace criteria, and pipe ovalization 3
y 08/10/81 Telecon to discuss how CP Co proposes to demonstrate
]
structural integrity of underground piping N
2
- Note:
This is a listing of only the reference information and the subsections N
of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.
d
]
rp0482-1759c102 n
4
..-.,.,p.nue. 4'unbh 8-
- - - + -. +
---.-e----m---or
--.O ew--.m.e----si---ows
_,-m.
p,+e-y-.
.rw.y,w,w
+y,www-y-,.-
-gy-v--w-ww-vv.---
4w-ww-gg.-.is,y4% w-wqw-
'g-w wwy-w-y=w+W e -we,c wp--9 y+pw9-,-+ge-www w g--evy8"m9'
s-e d'
2 4
08/25/81 Telecon to discuss NRC position on proposals for the j.
demonstration of underground piping integrity 01/08/82 Telecon concerning monitoring and rebedding of underground Pi ing P
03/24/82 g
03/25/82 Telecon on geotech parameters used for buried piping seismic analysis a
02/05/82 CP Co written testimony for Soils Hearings 02/18/82 02/19/82 Soils hearings transcript 4.
- l
~
I 4
i t
rp0482-1759c102
~ ~ ~ ~~
-~.
J Z
' - ~. _, _ __,_ _.. -..,
~
~
MIDLAND SOILS SETTLEMEh7 REFERENCE INFORMATION FOR SER EVALUATIONS
- STANDARD REVIEW PLAN 9.5.4 Emergency Diesel Engine Oil Storage and Transfer System I.1.a Seismic Design Requirements 50.54(f) Q&R 33 - Load test buried tanks and impact piping connections 12/15/81' CP Co letter on the Analysis of Buried Piping (Serial 15093) 03/10/82 Settlement of underground fuel tanks due to seismic shakedown (Serial 16243) 03/03/82 Meeting to discuss the liquefaction potential of loose aand layer (s) 03/19/82 Telecon with Paul Hadala (US Corps of Engineers WES) concerning liquefaction of loose sand layer (s) 03/30/82 Telecon with J Kane/P Hadala on additional
- boring data for the buried fuel tanks 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings I.1.5 System Design, Fabrication, Erection, and Testing to Quality Standards 50.54(f) Q&R 6.b - Settlement of buried tanks 50.54(f) Q&R 17 - Seismic Category I buried piping 50.54(f) Q&R 33 - Load test buried tanks and impact piping connections 50.54(f) Q&R 44 - Buried tank bearing capacity, settlement, and uplift stability l
12/15/81 CP Co letter on the A slysis of Buried Piping l
(Serial 15093) 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings 1.
- Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.
l Other information not related to soils issues can be found in the Midland FSAR l_
or in separate submittals, meeting notes, etc.
I rp0482-1759e102 l
~~~~
'~ ~
--,-,y p
..-e.,,.,
yw _
n
.e-
.. -.,,r-
~
~
~~
.- -_ : s 2
a I.1.f. Protection fra Natural Phenomenon and External Missiles 12/15/81 CP Co letter on the Analysis of Buried Piping (Serial 15093) 03/10/82 Settlement of underground fuel tanks due to seismic shakedown (Serial 16243) 03/03/82 Meeting to discuss
- the liquefaction potential of loose sand layer (s) 03/19/82 Telecon with Paul Nadala (US Corps of Engineers WES) concerning liquefaction of loose sand layer (s) 03/30/82 Telecon with J Kane/P Hadala on additional boring data for the buried fuel tanks 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings i
i rp0482-1759e102 r,_ : L
_ _. -,. r:::::.- _,, -, ::: ~. : - _- -_,,,..--
-