g UNITED STATES g{p" 88 Gut,(o NUCLEAR REGULATORY COMMISSION g
REGION 111 g
g 3-2
.E 799 ROOSEVELT ROAD g,
GLEN ELLYN, ILLINots 60137
/
~
September 1, 1982 MEMORANDUM FOR:
D. G. Eisenhut, Director, Division of Licensing, NRR FROM:
R. F. Warnick, Acting Director, Office of Special Cases
SUBJECT:
RECOMMENDATION FOR NOTIFICATION OF LICENSING BOARD Enclosed is a potential 10 CFR 21 report from the Zack Company. The Zack Company is a heating, ventilation, and air conditioning (HVAC) subcontractor at three power plant construction sites within Region III (Clinton, LaSalle and Midland). The subject report discussed deficiencies concerning the accuracy of welder records and is limited to work performed at the Zack facility in Cicero Illinois. The Zack Quality Assurance (QA) program is an issue which will be addressed in the Midland OM/OL proceedings.
Region III has' reviewed the materiality and relevancy of this matter and perceives the infor:tation identified in the enclosure to be material and relevant to the Midland OM/0L proceedings. Region III believes NRC policy dictates that the information be forwarded to all sitting boards for cases involving Zack Compat.y as the HVAC subcontractor.
The Zack Company has initiated an investigation of the welder record discrepancies. Region III is presently waiting for a followup report from the Zack Company which will identify th& results of this investigation.
This followup report is expected by September 10, 1982.
If you have any questions or desire further information regarding this matter, please call me.
Ah.Y Tf R. F. Warnick, Acting Director Office of Special Cases
Enclosure:
As stated cc w/o enclosure:
W. D. Shafer R. N. Gardner R. B. Landsman R. Cook B. Burgess E
r*
gy NOV 0 8 P3 MEMORANDUM FOR:
D. G. Eisenhut, Director, Division of Licensing, NRR FROM:
R. F. Warnick, Director, Office of Special Cases
~
SUBJECT:
RECOMMENDATION FOR NOTIFICATION OF LICENSING BOARD In accordance with present NRC procedures regarding Board Notifications, the following information is being provid.ed as constituting new information rele-vant and material to the Midland OM/0L proceedings. This information deals with the licensee's November 3,1983, decision to issue a stop work order pertaining to eight Project Quality Control Instructions (PQCI's) which control the in-spection of electrical instrumentation support welds.
The eight PQCI's contain duplicate welding criteria. The potential exists that if a PQCI was revised, then all other PQCI's having duplicate welding criteria may not be revised. As a result, inspections could be performed to superceded requirements. This issue was identified by Stone and Webster during their over-view of the Construction Completion Program (CCP).
No work was being performed which was affected by the stop work order, however, the order will prevent the licensee from initiating phase 1 of the CCP as it relates to the inspection of electrical instrumentation support welds until corrective actions have been taken and the stop work order rescinded.
If you have any questions or desire further information regarding this matter, please call me.
" Original signed by ei. F. Varnick" R. F. Warnick, Director Office of Special Cases
'(d
,n i
RI I RII RIII g
Gar ner/ls Harrison Warnick 11/07/83 Q h1f$I
h PRINCJPAl. STAFF ___
/ p ase gk UNITED STATES
/
6' bleWE!PRP NUCLEAR REGULATORY COMMISSION D/RA DE 3
a I
wAsHmcToN. o. c. 20sse VRA W SP t
4c w
+1 November 21, 1983 sc3 rw u,o n
L _
File # '"
and 50-330 OM, OL MEMORANDUM FOR: The Atomic Safety and Licensing Board for the Midland Plant, Units 1 and 2 FROM:
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
SUBJECT:
BOARD NOTIFICATION - STOP WORK ORDER ON PROJECT OUALITY CONTROL INSTRUCTIONS REGARDING ELECTRICAL INSTRUMENTATION SUPP0AT WELOS (BN 83-181)
This Notification is provided in accordance with NRC procedures regarding Board Notifications and is deemed to provide new infomation material and 4
relevant to quality assurance / quality control issues in the Midland OM-OL proceeding. As noted in Enclosure 1, Consumers Power Company (the Applicant) issued a stop work order on November 3,1983, be:cause of duplicate welding criteria contained within eight Project Quality Control Instructions (POCIs) used to control inspections of support welds for electrical instrumentation.
A conce:Ti arises from the potential that, if a POCI is revised, not all other PQCI:, with duplicate welding criteria may be revised accordingly.
In such a case, inspections could be perfomed to requirements which should have been superceded.
l Initiation of phase I of the Applicant's Construction Completion Program i
(CCP) with respect to inspection of electrical inspection support welds could be affected by this stop work order in the future. At present, however, no work is being, nor has been perfomed because of earlier stop sork orders reported by BN 83-167. The NRC staff and Stone and Webster, the third party overviewer of the CCP, will monitor the Applicant's corrective actions regard-ing the eight POCIs. The staff will report further to the Board as resolu-tions are achieved.
Thomas M. Novak, Assistant Director for Licensing Civision of Licensing
Enclosure:
R. Warnick memo dated November 8,1983 E'@
8311010023 i
f.e
"~*
NOV 2 81983
- - _ ~. -. -
_-,---._-._.,..-._,y.-__-
--._-v~..,_-
._.w
- m. - - -.
DISTRIBUTION LIST FOR BOARD NOTIFICATION Midland Units 1&2, Docket Nos. 50-329/330 ACRS Members Charles Bechhoefer, Esq.
Dr. Robert C. Axtmann Ms. Lynne Bernabei Mr. Myer Bender Lee L. Bishop. Esq.
Dr. Max W. Carton James E. Brunner, Esq.
Mr. Jesse C. Ebersole Dr. John H. Buck Mr. Harold Etherington Myron M. Cherry, P.C.
Dr. William Kerr Dr. Frederick P. Cowan Dr. Harold W. Lewis T. J. Creswell Dr. J. Carson Mark Steve J. Galder, P.E.
Mr. William M. Mathis Dr. Jerry Harbour Dr. Dade W. Moeller Mr. Wayne Hearn Dr. Milton S. Plesset Mr. James R. Kates Mr. Jeremiah J. Ray Frank J. Kelley, Esq.
Dr. David Okrent Christine N. Kohl, Esq.
Dr. Paul C. Shewmon Mr. Howard A. Levin Dr. Chester P. Siess Mr. Wendell H. Marshall Mr. David A. Ward Michael I. Miller. Esq.
Thomas S. Moore, Esq.
Mr. Pa'ul Rau Ms. Mary Sinclair Ms. Barbara Stamiris Frederick C. Williams Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch e
-. p _ - - _ _ _ _. _
.-,~,-_.,c__
MIDLAND (ForBNs) i Mr. J. W. Cook Vice President Consmers Power Company 1945 West Parnall Road i
Jackson, Michigan 49201 1
cc: Stewart H. Freeman James G. Keppler, Regional Administrator Assistant Attorney General U.S. Nuclear Regulatory Commission, State of Michigan Enviornmental Region III Protection Division 799 Roosevelt Road 720 Law Building Glen Ellyn, Illinois 60137 Lansing, Michigan 48913 Mr. Ron Callen Mr. Paul Rau Michigan Public Servit.e Commission Midland Daily News 6545 Mercantile Way 124 Mcdonald Street P.O. Box 30221 1
Midland, Michigan 48640 Lansing, Michigan 48909 Mr. R. 8. Borsim Geotechnical Engineers Inc.
Nuclear Power Generation Division ATTN: Dr. Steven J. Poulos i
Babcock & Wilcox 1017 Main Street 7910 Woodnont Avenue, Suite 220 Winchester, Massachusetts 01890 Bethesda, Maryland 20814 Billie Pirner Garde Mr. Don van Farrowe, Chief Director, Citizens Clinic Division of Radiological Health for Accountable Government Department of Public Health Government Accountability Project P.O. Box 33035 Institute for Policy Studies Lansing, Michigan 48909 1901 Que Street, N.W.
]
U.S. Nuclear Regulatory Commission j
Resident Inspectors Office Commander. Naval Surface Weapons Center Route 7 ATTN: P. C. Huang
{
Midland, Michigan 48640 White Oak Silver Spring, Maryland 20910 1
Mr. Paul A. Perry, Secretary Constners Power Company Mr. L. J. Auge, Manager 212 W. Michigan Avenue Facility Design Engineering
]
Jackson, Michigan 49201 Energy Technology Engineering Center P.O. Box 1449 Mr. Walt Apley Canoga Park, California 91304 i
c/o Mr. Max Clausen i
Battelle Pacific North West Labs (PMWL)
Mr. Neil Gehring l
Battelle Blvd.
U.S. Corps of Engineers SIGMA IV Building NCEED - T l
Richland, Washington 99352 7th Floor l
477 Michigan Avenue l
Mr. I. Charak, Manager Detroit, Michigan 48226 NRC Assistance Project Argonne National Laboratory ATTM: Clyde Herrick 9700 South Cass Avenue Frenklin Research Center Argonne, Illinois 60439 20th & Race Streets Philidelphia, Pennsylvania 19103 Mr. Patrick Bassett Energy Division Norwest Bank Minneapolis, N.A.
8th and Marquetts Minneapolis, MN 55479 I
p i
kn ase UNITS 0 sTATss NUCLEAR REGULATORY COMMISSION 4
j nacion :::
3-too acosavaLT acao stem sLLyn, sLL nois sotst NOV 0 8 t;8T HEMORANDUM FOR:
D. G. Eisenhut, Director, Division of I.icensing, NRR FROM:
R. F. Warnick, Director, Office of Special Cases
SUBJECT:
RECOMMENDATION FOR NOTIFICATION OF LICENSING BOARD In accordance with present NRC proceduras regarding Board Notifications, the g
following information is being provided as constituting new information rele-g vant and material to the Midland OM/0L proceedings. This information deals with the licensee's November 3, 1983, decision to issue a stop work order pertaining to eight Project Quality Control Instructions (PQCI's) which control the in-spection of electrical instrumentation support welds.
l D !
The eight PQCI's contain duplicate welding criteria. The potential exists that if a PQCI was revised, then all other PQCI's having duplicate welding criteria may not be revised. As a result, inspections could be performed to supere,eded 33 q requirements. This issue was identified by Stone and Webster during their over-7 view of'the Construction completion Program (CCP).
No work was being performed which was affected by the stop work order, however,
'ef the order will prevent the licensee from initiating phase 1 of the CCP as it M) relates to the inspection of electrical instrumentation support welds until ci corrective actions have been taken and the stop work order rescinded.
Q If you have any questions or desire further information regarding this matter,
- 1 please call me.
~
R. F. Warnick, Director Office of Special Cases
?
[
t I
4
./
4
,I N
w i
- [ d 'I'6 9 "o.
6 874I DL/
X UNITED STATES NUCLEAR REGULATORY COMMISSION j j e((,,q
^ *f.
C REGloN lli 8-799 MooSEVELT RoAo
~.....~
GLEN E LLYN, ILLINOIS 60137 ucu. O 1 ggg MEMORANDUM FOR:
D. Eisenhut, Director, Division of Licen i FROM:
s ng, NRR R. F. Warnick; Acting Director, Office of S
SUBJECT:
pecial Case,s
~ RECOMMENDATION FOR NOTIFICATION OF RD Enclosed is a Preliminary Notification reg and air conditioning (HVAC) installation acti i iqualifica t
eating, ventilatio Power Company Midland Site.
v t es at the Consumers n Region III has reviewed this information OM/0L proceedings. identified in the enclosure to be materi land perceives We recommend that the Midland Licensing Band relevant to a
be notified.
oard If you have any questions or desire furthe matter., please call me.
r information regarding this RFt)JnuJh R. F. Warnick, Acting Director Office of Special Cases
Enclosure:
As stated cc w/ encl:
A. B. Davis' W. D. Shafer R. N. Gardner R. B. Landsman R. J. Cook B. L. Burgess E. L. Jordan, IE
\\
e i
I J
_........ w m %,.., _...
public intorcst cignific:nca.This prolininery n:tificntien constitutoa EARLY nstice o fic;Oion"6r cvsluntiin, cnd is basically all thatTha infermetion is cs initicily received w veri-
)
is known by the staff on this date.
[CCilitY:
Consumers Power Company Midland Nuclear Power Plant Licensee Emerger.cy Classification:
Units 1 and 2 Notification of Unusual Event Al e r't Docket Nos. 50-329 50-330 Site Area Emergency Midland, MI 48640
_ General Emergency Not Applicable
~
Subject:
_ xx INADEQUATE QUALITY ASSURANCE FOR HVAC WELDE QUALIFICATION D PROCEDURE All safety related welding on the heating, ventilatin
-?-
was stopped November 30, 1972, after it was determined by thg and air conditioning (HVAC) cssurance program for welder certification and procedure qualificatie licensee A licensee QA audit of Photon Testing, Inc on was inadequate.
used in certifying welders and welding procedureswhich performed testing of wel,d samples did not b2sn removed by the licensee from the list of approhave an ade Photon Testing has subsequently ved Midland vendors.
As a result of the audit findings,'the HVAC contract discentinued the certification of new welders and withdcll r ers. Zack also prcccdures.
rew all safety-related weld gustifications 'since 1980.Th2 Photon Testing has performed testing services or HVAC welder and procedure ksgicn III (Chicago) personnel are on site and will to cddress the qualification of the Zack welders a dmonitor the licensee's program qu3tity of the completed HVAC welding work.
n procedures and to assess the Thare has been local news media interest in the cuali layoffs.
Region III will continue to respond to news inquirity assurance problems and res es.
Th2 State of Michigan will be notified.
Th2 licensee reported the quality assurance inadequacies and HVAC o petcntial 50.55e construction deficiency to Region III personn l 2 p.m., (EST),
worker layoffs as December-1, 1982.
This information is current as of that time.at the site e
UU-
&b Ccntact:
R. Gardner JD' O b 384-2524 W. Shafer R. Warnick 384-2656 384-2599 TRIBUTION:
Oc.
MSBB_
irscn Palladino Phillips_
E/W_
Willste_
~
. R:barts AEOD ELD
. Assolstine Air Rights MAIL:
SP INPO ADM:DMB Applicable Resident Site NSAC_*
DOT: Trans Only R3gicns I_
, II__
_, I V_
V__
il'I Licensee (Corporate Office)_
r<-
$d e
UNITED STATES NUCLEAR REGULATORY COMMISSION ERINOlPAL STAFF o
i g *, w#j wAsmucTom. o. c. 20sss
- A.A /45;.9 l
k"Mp.,.
October 28, 1983 N',N y).%
f (f"s,yge' g Docket Nos: 50-329 OM, OL' 39 and 50-330 OM, OL p
i FiF
- File 6g n MEMORANDUM FOR: The Atomic Safety and Licensing Board for the Midland Plant, Units 1 and 2 FROM:
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
SUBJECT:
BOARD NOTIFICATION REGARDING STOP WORK ON BABCOCK AND WILCOX'S PIPE HANGER AND SNUBBER ACTIVITIES (BN 83-162)
This Notification is provided for your infomation in accordance with NRC pro-cedures regarding Board Notifications and is deemed to provide new infomation material and relevant to quality assurance issues in the Midland OM/0L pro-ceeding. As stated in the enclosure, on October 5, 1983, Babcock and Wilcox (B&W) decided to stop all its seismic Class I pipe hanger and snubber activi-ties and lay off 132 craft and support personnel. The decision resulted from inspections by Bechtel and B&W which identified various discrepancies in the manufacture and installation of hangers and a number of deficiencies, including welding and bolting problems.
The NRC plans to follow the corrective actions which will result from this stop-work order and will provide follow up information to the Board once com-
'pleted.
Thomas M. Novak, Assistant Director for Licensing Divis!an of Licensing
Enclosure:
Memorandum from R. F. Warnick to D. G. Eisenhut dated October 17, 1983 cc: SECY OPE OGC Parties to the Proce-ding g 1_AARO 4
s A
y
~
l i
DISTRIBUTION LIST FOR BOARD NOTIFICATION Midland Units 182, Docket Nos. 50-329/330 ACRS Members Charles Bechhoefer, Esq.
Ms. Lynne Bernabei Dr. Robert C. Axtmann Lee L. Bishop Es Mr. Myer Bender James E. Brunner,q.Esq.
Dr. Max W. Carbon Dr. John H. Buck Mr. Jesse C. Ebersale
~
Myron M. Cherry, P.C.
Mr. Harold Etherington Dr. Frederick P. Cowan Dr. William Kerr T. J. Creswell Dr. Harold W. Lewis Steve J. Galder, P.E.
Dr. J. Carson Mark Dr. Jerry Harbour Mr. William M. Mathis Mr. Wayne Hearn Dr. Dade W. Moeller Mr. James R. Kates Dr. Milton S. Plesset Frank J. Kelley, Esq.
Mr. Jeremiah J. Ray Dr. David Okrent Christine N. Kohl, Esq.
Mr. Howard A. Levin Dr. Paul C. Shewmon Mr. Wendell H. Marshall Dr. Chester P. Stess Michael I. Miller, Esq.
Mr. David A. Ward Thomas S. Moore, Esq.
Mr. Phul Rau Ms. Mary Sinclair Ms. Barbara Stamiris Frederick C. Williams, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel /
Docketing and Service Section Document Management Branch b
_g._
MIDLAND (For BNs)
Mr. J. W. Cook Vice President Consmers Power Company 1945 West Parnall Road
> Jackson, Michigan 49201 cc:'PStewart H. Freeman dames G. Keppler, Regional Administrator Assistant Attorney General U.S. Nuclear Regulatory Commission, State of Michigan Enviornmental Region III Protection Division 799 Roosevelt Road 720 Law Building Glen Ellyn, Illinois 60137 Lansing, Michigan 48913 sMr. Ron Callen 4Mr. Paul Rau Michigan Public Service Commission Midland Daily News 6545 Mercantile Way 124 Mcdonald Street P.O. Box 30221 Midland, Michigan 48640 Lansing, Michigan 48909 aMr. R. B. Borsum Geotechnical Engineers, Inc.
Nuclear Power Generation Division ATTN: Dr. Steven J. Poulos Babcock & Wilcox 1017 Main Street 7910 Woodsont Avenue, Suite 220 Winchester, Massachusetts 01890 Bethesda, Maryland 20814 4H111e Pirner Gr.ede sMr. Don van Farrowe, Chief Director, Citizens Clinic Division of Radiological Health for Accountable Government Department of Public Health Government Accountability Project P.O. Box 33035 Institute for Policy Studies Lansing, Michigan 48909 1901 Que Street, N.W.
~
Washington, D. C.
20009 ap.S. Nuclear Regulatory Commission Resident Inspectors Office Commander, Naval Surface Weapons Center Route 7 ATTN: P. C. Huang Midland Michigan 48640 White Oak Silver Spring, Maryland 20910 Afr. Paul A. Perry, Secretary Consumers Power Company 1Mr. L. J. Auge, Manager 212 W. Michigan Avenue Facility Design Engineering Jackson, Michigan 49201 Energy Technology Engineering Center
~ P.O. Box 1449
=Mr. Walt Apley Canoga Park, California 91304 c/o Mr. Max Clausen Battelle Pacific North West Labs (PNWL)
Jir. Neil Gehring Battelle Blvd.
U.S. Corps of Engineers SIGMA IV Building NCEED - T Richland, Washington 99352 7th Floor 477 Michigan Avenue de. I. Charak, Manager Detroit, Michigan 48226 NRC Assistance Project Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 l
.g
.-~_,.-g 9
.-_m,,,,.,,.,c..
,..yg.--.--y
-_ ---~
y<_.w
---_-y---,9_7,
e-o e is o'
s mees UNITS 3 sTafss
/a 9m; NUCLEAR REGULATORY COMMISSION
~
{
'g RsalON lli et 3
199 moosavsLT momo e
t g
stam sLLym. stumois son at OCT I T $83' MEMORANDUM FOR:
D. G. Eisenhut, Director, Division of Licensing, NRR l
FRON:
R. F. Warnick, Director, Office of Special Cases
SUBJECT:
REC 0t9ENDATION FOR NOTIFICATION OF LICENSING BOARD In accordance with present NRC procedures regarding Board Notifications, the following information is being provided as constituting new information relevant and material to the Midland ON/0L proceedings. This information deals with Babcock and Wilcox's (B&W) October 5,1983, decision to stop all o.f its Class I (safety-related) pipe hanger and snubber activities. The stop-work applies to both small bore and large bore piping and has resulted in the lay-off of 132 craft and support personnel. The pertinent facts that relate to the stop work are as follows:
1 sampling of B&W pipe support hangers by the Bechtel Corporation, the Midland constructor, identified various discrepancies in the manufacture and installation of the hangers. Bechtel notified B&W, and it in turn took a sample of about 40 hangers for reinspection. B&W found a number of deficiencies, including welding and bolting problems during the inspection.
Both Bechtel and the licensee said that the stop-work order will not be lifted until they have approved a B&W employee training program, and that the appropriate personnel have been retrained. They also will not lift the stop-woth until corrective action is proposed by B&W to resolve any deficiencies in the hanger supports.
If you have any questions or desire further information regarding this matter, please call me.
S M kL W Ae R. F. Warnick, Director Office of Special Cases
/
,,(p** **%vjo,,
UNITED STATES NUCLEAR REGULATORY COMMISSION e
o t
.j WASHINGTON, D. C. 20655 k+..../
April 27,1984 Docket Nos: 50-329 OM, OL and 50-330 OM, OL
, Q : met g M '
A L24 T T MEMORANDitM FOR: Chairman Palladino Commissioner Gilinsky
~ -
Comissioner Roberts Jg Comissioner Asselstine Comissioner Bernthal FROM:
Darrell G. Eisenhut, Director Divisinn of Licensing, NRR
SUBJECT:
BOARD NOTIFICATION ON LIFTING OF STOP WORK ORDERS AND REGION III STAFFING CHANGES ON MIDLAND PLANT (BN 84-083)
In accordance with the NRC procedures for Board Notifications, the following information is being provided directly to the Comission for l' formation.
n This information is applicable only to the Midland Plant, Units 1 and 2.
The information is material and relevant to quality assurance / quality control issues before the Licensing Board in the OM-OL hearing.
The appropriate Boards and parties are being informed by copy of this memorandum.
Board Notificiation 83-167, dated October 28, 1983, advised the Licensing Board that Consumers Power Company had issued nine stop work orders following its audit of the design document control system, stopping extensive safety-related activities at the Midland site on October 22, 1983.
BN 84-019 dated February 2,1984, reported the lifting of the stop work order for remedial <nih work, and supplemental BN 84-023, dated February 14, 1984, reported the partial lifting of some of the other stop work orders.
Enclosure 1 notes that the final stop work order has now been lifted and identifies specific final release dates by the independent third-party overviewer (Stone and Webster) and by the Company. Accordingly, this is the final Board Notification regarding the status of the stop work orders.
NRC followup inspections of the Company's Field Change Request / Field Change Notice (FCR/FCN) documentation will be performed later this year and discussed in Region IH inspection reports to be provided to the Licensing Board and hearing parties.
8404230133
$4bho MSV e
a
.1 DISTRIBUTION LIST FOR BOARD NOTIFICATION Midland Units 1&2, Docket Nos. 50-329/330 ACRS Menbers Charles Bechhoefer, Esq.
Dr. Robert C. Axtmann Ms. Lynne Bernabei Mr. Myer Bender James E. Brunner, Esq.
Dr. Max W. Carbon Dr. John H. Buck Mr. Jesse C. Ebersole Mr. Ror.ald C. Callen Mr. Harold Etherington Gerald Charnoff, Esq.
Dr. William Kerr Myron M. Cherry, P.C.
Dr. Harold W. Lewis Dr. Frederick P. Cowan Dr. J. Carson Mark Barton Z. Cowan, Esq.
Mr. William M. Mathis T. J. Creswell Dr. Dade W. Moeller Gary J. Edles, Esq.
Dr. Milton S. Plesset Steve J. Galder, P.E.
Mr. Jeremiah J. Ray Dr. Jerry Harbour Dr. David Okrent Samuel A. Haubold, Esq.
Dr. Paul C. Shewmon Mr. Wayne Hearn Dr. Chester P. Siess Dr. W. Reed Johnson Mr. David A. Ward Mr. James R. Kates Frank J. Kelley, Esq.
Christine N. Kohl, Esq.
Dr. J. Venn Leeds, Jr.
Mr. Howard A. Levin Steven Lewis, Esq.
Dr. Emmeth A. Luebke Mr. Wendell H. Marshall Marshall E. Miller, Esq.
Michael I. Miller, Esq.
Thomas S. Moore, Esq.
William C. Potter, Jr.
Mr. Paul Rau Harold F. Reis, Esq.
Ms. Mary Sinclair Ms. Barbara Stamiris Frederick C. Williams, Esq.
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch l,
~..
MIDLAND (For RNs)
Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Stewart H. Freeman James G. Keppler, Recional Assistant Attorney General Administrator State of Michigan Environnental U.S. Nuclear Reaulat ory Comnission, Protection Division Region III 7?O Law Building 799 Roosevelt Road lansing, Michinan 48913 Glen Ellyn, Illinois 60137 Ms. Julie Morrison Mr. Ron Callen Midland Daily News Michigan Public Service Comnission 124 Mcdonald Street 6545 Mercantile Way Midland, Michigan 48640 Lansing, Michigan 48900 Mr. R. R. Borsum Geotechnical Engineers, Inc.
Nuclear Power Generation Division ATTN: Dr. Steven J. Poulos Babcock & Wilcox 1017 Main Street 7910 Woodmont Avenue, Suite 2?0 Winchester, Massachusetts 01890 Bethesda, Maryland 70814 Rillie Pirner Garde Mr. Don van Farrowe, Chief Director, Citizens Clinir Division of Radioloaical Health for Accountable Government Department of Public Health Government Accountability Pro.4cct P. O. Box 33035 institute for Policy Studies lansino, Michigan 48009 1901 Our Street, N.W.
Washington, D. C.
P0009 U.S. Nuclear Pegulatory Comnission Pesident inspector's Office Commander, Naval Surface Weapons Ctr.
Route 7 ATTN:
P. C. Huang Midland, Michigan 48640 White Oak Silver Spring, Maryland 70910 Mr. Paul A. Perry, Secretary Consumers Power Company Mr. L. J. Auge, Manager
?1? W. Michican Avenue Facility Design Engineering Jackson, Michioan 49201 Energy Technology Enginearing Center P. O. Rox 1449 Mr. Wal t Apley Canoga Park, California 91304 c/o Mr. Max Clausen Battelle Pacific North West Labs Mr.
Neil Gehrino SIGMA TV Buildino U.S. Corps of Engineers Battelle Blvd.
NCEE0 - T Richland, Washington 09352 7th Floor 477 Michigan Avenue Detroit, Michigan 48??6
Mr. J. W. Cook
- cc: Mr. I. Charak. Manager NRC Assistance Proiect Argonne National Laboratory 9700 South Car.s Avenue Argonne, Illinois 60439 ATTN: Clyde Herrick Franklin Research Center 20th & Race Streets Philadelphia, Pennsylvenia 19103 Mr. Patrick Bassett Energy Division Norwest Bank liinneapolis, N.A.
8th and Marguette Minneapolis, itinnesota 55479 O
r 6
i 4
v
~.
y-,
r---
y.
._.r,
.. v.,
,cc 1
g p.
s j.
y s,
1 :
s si (
s _.
,3 k
'Q
-.$,,[?.
c,,. m y-
2 -
s-
. s
,i
,\\
' b,
{s q
u
.~
. also describec (1) a recent'Reoion'III organizational change in which the Midleiid,iection of the Office of Special Cases is transferred to the Division ofPmject'and Pesident Programs, and (2) increased resources i
for-i4RC inspectjcns fot the Midland Plant. '
m f.
V d [Mh}G. jisenhut, Director
}d, hl6K M k V
f g'
g 1;
rrell s
i x,
't
- \\q N
[
Oivision of Licensing v
k.
t\\. Enclosure-C. Norelius memo A3ted 4/9/84
~
o 4
+
+
1 c
y s\\.-
cc: SECY.(2)'
50PEi t
N OGC ~ \\
~
t.
EDO L Parties to th?' Proceeding C. Bechhoefer, ASL!t.
F. P.sCowan, ASLB J. Harbour,s ASLB T
C.. Kohl, ASLAB s,
N. Bu'ck, ASLAB
^
N,7. Moore, ASLAS-s I
'w g
=
1,.
,'y '
3, i,
'- m 's s..
g I.
g t
y M
k s(y s
r 5.
)
(
-88
- +s&
+
l s
e, %
(
(
T 4
d
+
i.
Is t
4 s
3 g %;
y
, y c'
e w.
3
.s.
y,.. -
'N
y=_
s 0 mac UNITED STATES,
,[g,
\\,
NUCLEAR REGULATORY COMMISSION ir( '$
REGION lli O
f 799 mooSEvtLT moAo
.O 87 GLEN ELLYN. ILLINOl$ 60437 g
%....s*
f g, J Cy t MEMORANDUM FOR:
- 0. G. Eisenhut, Director, Division of Licensing FROM:
C. E. Norelius, Director, Division of Project and Resident Programs
SUBJECT:
RECOMMENDATION FOR NOTIFICATION OF LICENSING BOARD'-
FCR/FCN STOP WORK STATUS AND NRC MIDLAND STAFFING CHANGES In accordance with oresent NRC procedures regarding Board notifications, th9 following information is being provided as constituting new information relevant and material to the Midland OM/0L proceedings.
Design Control Stop Work Status On January 31, 1984, Region III notified you of the status of the stop work orders regarding the design control (FCR/FCN) problems at Midland.
On February 14, 1984, a Supplemental Board Notification (BN 84-023) forwarded this information to the Hearing Board.
Following this notification the licensee lifted the remaining stop-works by area engineering discipline.
On March 23, 1984, at 7:30 a.m., the final stop work was lifted.
Attached you will find a copy of a matrix developed by Consumers Power Company that identifies key dates for various releases including Stone and Webster releases and CPCo final release.
As a result of the design control stop work orders and the resultant review of approximately 60,000 documents by Consumers Power Company, 12 nonconformance reports were issued. identifies the noncoriformance reports issued by number, engineering discipline, and a description of the nonconformance.
The licensee has determined that the nonconformances have no significant impact on hardware.
The NRC staf f plans to perforal an inspection on the FCR/FCN area later_ this year to review the new design control system, problems identified by the licensee, and corrective actions taken.
The Board will be informed of the results of this inspection via a copy of the inspection report when issued.
This will complete all required followup action by the NRC.
e 1
D. G. Eisenhut 2
NRC Staffing Status 't The NRC. staff assigned'to perform inspections at the Midland facility has been increased this fiscal year.
The increase is in accordance with the Region III staffing plan and is due to the backlog of open inspection items and the increased inspection. workload associated with the Construction Completion Program.
The NRC now has three resident' inspectors located at the Midland site, an additional three individuals in the Region.III office assigned full time to the Midland project,'and three inspection specialists from the Region III Division of Engineering who spend time onsite as needed.
Additionally, an NRC Resident Site Supervisor has been selected for Midland and will report to the site in the near future.
NRC is in the process of approving a contract with a national laboratory for assistance with th'e technical inspection program at Midland, approximately i
two and orie-half man yearsi of effort.
In the interim, two Argonne contract engineers, formerly assigned to Zimmer, have been temporarily assigned to provide inspection assistance at Midland.
With the announced decision by the owners of the Zimmer plant t'o not complete it as a nuclear facility, Region III dissolved the Zimmer Section and the Office of Special Cases and transferred the Midland Section together with all its people to the Division of Project and Resident Programs (DPRP).
The
, Director of the Office of Special Cases was reassigned as Chief, Projects Granch 1, DPRP, with responsibility for RIII plants under construction, including Midland.
We believe the increased NRC staffing will help to reduce the backlog of open inspection items and will enable RIII to better monitor the ongoing plant activities.
The organization changes should have no impact on NRC inspection activities at Midland.
No followup actions are required.
! ( f : t u$ 'N u~ A n
/.-
C. E. Norelius, Director i
Division of Project and Resident Programs
Enclosures:
As stated i
cc w/encis:
J. G. Keppler i
t
~
i,
\\
r j
a T
];
-l ]
. Attachment'l 2 TOP aORK R t EASE CUP"1ARY JTCP Whg cupEas FsW.)) THb*=JOH al I?*3 "AK NO.
FSW-1)
FF"4 n*
' T _*d-M
f *.'r-36 f _.ei-37 PJ 1,6 F0W-if, F5W FSW-a t 5 '5JE3 -
.HVAC Zack MPGAL Hanger CE3 Cor.strue-Prseurement' B&W Fabrica-
!:.;s :-
Standish' CSO Fabri-Balan:e
& MPQAD.
Rear:spe:taor:
tion Testing tion. Instal-5e"stes Fabrication cation &
.of Plant HdAC In-lation & In-Facility Installa-0-relat-e:*r Febra.
spection spection
- stier.. In-Fabrication tion; MPOAD.
ed war A (Utillaing stallation.
Inspection Inspection tanlud-g BPCo Spec *s
- st*.ra: tion to support ing 2*P g
& Duss.
t.f.2;ec t t e.n of CSO Status Assess-ment &
OUP Aet.
- F57*.L 8I JA!E
. NI A N/A N'A Ar. Arbor N/A
- 4 &
EIA N/A N!&
s Prneurements (C13yl Vert-fle2 as not af'e:ted Il-3-83 11 20 a.m.
F17*;at *ILEASE FCR 12-9-83 12-5-5) 12*i=3) 12*9*I3.
32-9*03 II*bf 3 32*9*03 32*9*0I
.I2***
I M. *?* t#T!*:in*
6:10 p.m.
f?t4 c..
- 20 e.m.
6: *e p.m.
6:20 c.m.
- '1 r.+.
ce21 p.m.
6:22 p.m.
6:28 :.-
- 1I t nEEITEn t-20-84 1-20-ce
- -N 8
- 3. C-94 1-20 84
-2*-!*
8-20-84 1-20-84 Evg c-17 A *1 7!!! USA"-
at 5t a.
5E !;;I tion 1.
12-st-53
( Ver tal -
Dug 4 Specs.
Occ sta-tions
- 14. 4fa.
b64 8 *f 12-83-?)
Print conce;t i Sta-tion 89 t-2c-6e 9
1
.x Rev. 2 3-2)-84 0 A Taggsrt i
.+
I 0
0 I
4 i
~
PACE 2 4
STDP woPr no.
r. 13 r *.w-ga re,w - 35 F:6-w r3v.37 r3y.33 r3w.39 r3y.go psy..,
i l
PARTIAL PELEASE F;4 2
L'
- 1-2C-84 2-9-84 1 23-34 2-8 84 s-2G-84 1-20-84 12-81-83 j
0-RELATED WOpg l'
a.m.
II:17 a.m.
2:48 p.m.
18:16 a.m.
3:46 p.e.
13:15 a.m.
11:58 a.m.
3:00 p.e I
j ARCHITECTURAL C00's
+ Ita: ton f Station f Station f Station f Station f Stattan f Station Dws only it FLLC)
%9 (FDDC) 59 (FDDC)
%.FDLC) 59.FDDC) 59 (FDDC) 59 (FDDC)
- Station j
NOTE:
Fab-14
- recation, I
Inspection.
12-13 83
& related 9:'S a.a.
-ork t r.
Ewr &
[
support or Spe:'s Scils re.
DCC Sta-leased via tions it.
l SdC F 6-3*
4'a. bas i
45%
I 4
i-20-se j
11:15 a.a All via l
1 work prin 4 Statas Assess-ment PMr.
i j
corcept l
@ Statien j
$9 (FCCO)
$70tJF 6 let P* TER
- -;;-te 1-20-84 1-20-34 1-2 -94 1 20-84 1-19-84 t-20-84 l-20-84 1-20-54 j
'l:45 a.m.
II:17 a.m.
2:48 p.m.
tt:- a.a.
3:48 p.m.
9:40 a.m.
II:15 a.m.
11:18 a.m.
11:45 an Woke CIWIL DuC's f ; tat:en
& Station
& Stattar.
f.N a' t >r.
f Statann Sotts DCC f Statton f Station
}
!) :FDDC) 59 (FDDC) 59 (FDDCJ 59 8L3Ca 59 (FLDC)
- tations 59 NOTE:
59 (FDDC) 8.10.13,24 Fabracation, i
& 64 Inspection.
(
4 related work in sw-pport of Solls re.
i l
leased via I
SWO FSW-38 i
-25 9a 1 24-84 1-24-84 1 -;..f 4 l-24 84 1-24-84 3 24-84 1-24-84 1-24-84
[
ST0HE & IntP.TER
+
I e c *EtF_A*
l i
t Rev.2 3-2 3-84 l
D A Taggart e
e 6
3 s
Page 3 CT3P W W NO FT4-31 FTW-14 FoW-15 FSW-16 F % )7 i
?sw-38 F' W-39 FSW 40 FSW-43 FARTIAL hELEACE 2-,-e 1-24-84 2-4-64 l-24-84 2-i-ig
'3oals G 1-24-54 1-24-84 1-24-84 FOR Q-8 ELATED 11-2 4.m.
12:32 p.m.
2:48 p.m.
12:30 p.m.
3:48 p.m.
Leries to 12:32 p.m.
82:33 p.m.
82:35 a.m wo8K ISC DOC *1' 9 Itat am i Stattort e Station
@ Station f Stat a.:n support
- 5tation f Station
% (Fli:)
54 (FDCC) 51 (FDDC) 59 (i DDC) 59 (FL;.
Caett Sotts 59 (FDDC) 59 (FDDC) released 1-24-84 a 18:55 a.m.
- T n:I & WE8; TEN
-2t-3a
'-2 f -6 4 1-2t-84
-:t -i s 1-26-84 1-26-84 1 26-84 1-26-84 ELECTRICAL PELEASE PARTIAL DELEASE 2',-*
1-;c.84 2-9-84 1-26-84 2-5-!.
2-6-84 1-26-84 3-26-84 3 26-84 FJA G-SELATED t t 2i a. st.
2:36 p.m.
2:48 p.m.
2:37 p.m.
3:46 g.e.
1:20 p.m.
2:38 p.m.
2:39 p.m.
2:42 p.m w0RK ELECTRICAL e Stt. n f Station
- Stataan f ::titaon f Station Stations
- Station
- Station f Statto DOC's.
% I F f5 -
Si (FDDC) 59 (FDDC)
-69 (7DDC) 59 (FID's 84 10 59 (FDDC) 59 (FDDC) 59 (FDDC Siont & WEBSTER 2-8-34 2-8-84 2-8-84 2-8 -34 2 it 2-8-84 2-8-84 2-6-84 2-8-84 MECHANICAL PELEA';E rARTIAL DELLALL 2-,-o,
...-).
-P - A 4
.-5,
,-23-34 2-8-84 2-8-84 2-8-94
~ 30 a.m.
3:48 p.m.
3:49 p.m.
3:45 p.m FJB Q-RELATED 13:25 a.m.
3:47 p.m.
2:48 p.m.
3:47 p.m.
3:45 p.
W]at t' HANICAL 9 StatMn 9 Otation f Statnon
& St et t ort
- 5 tat &on 9 N at a cr.s f station
- Station
- Stataan
' 4 to 59 (FDDC) 59 (FDDC) 59 (F0DC)
- 3"s
- 5) i f r. ~
?) ('007)
", ) IFICC)
'.9 t rDDC) 54 4 F;; ;
F!nAL CCMPLETE 2-4-8e 2 a-ig 2-4-84 2-8 -64
?-t-64 Soils Prt.
2-8-84 2-8-84 2-8-84 itEL Et 3E lt:d*, a.s.
3 4'
,.m.
2:48 p.m.
3 47 p.m.
3:*5 g...
mary re-3:48 p.m.
3:49 p.m.
3:45 p.m.
lease 1-19-84 9:40 a.m.
- !x were release 1 an
- n0TE: C Ser a es docuser.t s were a nc lui I & C Dn 's.
con junction as wt.ere tric disc ag.lar e -as re aease s itart arie '-24-14 Rev. 2 3-2.'t-8 4 D A Taggart 1
e
[
Dean L Quemme Sest 6farrarre
- AtulianJ Prene.t M.diand Prope PO Bom :963 Metend M6 4864o. 15171 631-8650 February 23, 1984 Mr J J Harrison Chief, Midland Section Region III Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERCY CENTER GWO 7020 NCR'S FROM THE FCR/FCN REVIEW FOR SWO'S File: 0505.2 UFI: 03*05*06 Serial: CSC-7367 0460.3 73*10*03 0250 99*04 Per your request, attached is a sum: nary of the NCR's identified as a result of the recent FCR/FCN review.
f
//
v DLQ/DDJ/ kip ect JEKarr, CIO RAWells, MPQAD liHPeck, MEC NIReichel, MEC KJCook, NRC Site 0
g6T67 r
f To Distribution (See below)
Faou DATA 86 art, Midland
.gg gg gg g Dave February 21, 1984 h0 WOE Suescci MIDLAND ENERGY CENTER PROJECT - IDENTIFIED NCR's FROM THE FCR/FCN REVIEW FOR SWO's Comatspo=oc=cc DAT 21-84 'l cc KJGill, Midland PDMilano, Midland EMFalmer. Midland Attached for your information please find a summary of the NCR's which were identified as a result of the recent FCR/FCN review.
Should you have any specific questions regarding these items please feel free to contact Pat Milano.
/
an DISTRIBUTION:
RAWells, Midland JLWood, Midland DLCuamme, Midlanc GEParker, Midland HPLeonard. Midland RCSember, Midland JKMeisenheimer, Midland NReichal, Midland WRBird, P-14 418A DPerry, Midland
e-pa g,,,.. p. c.O
.-~d x
.<v NCRs From FCR/FCN Review For SW0s NCR{-
Discipline Nonconformance 1.
C-00913 Mechanical Penetrations drilled and rebar cut in isolation valve pit wall and Turbine Building wall w/o prior Project appro-val, as required by Spec C-231.
2.
C-00024 I&C Contrary to note on Drawing J-3150(0)
Instrument Support, 2LT-3976BB2, lo-cated 4" east of required location.
Tolerance was only s2".
3 C-0093-3 Electrical Wire number change to blue conductor of cable'0BB6601B proposed by FCN E-5298.
FCN was not clearly dis-approved by Project Engineering and
-thus, the disapproved change was incorporated into Drawing E-900.
E-900 calls for wire tag now to be "6".
Drawing E-37 identifies wire number as "SG1".
4.
C-00934 Electrical FCN E-5744 revised sizes of terminal (Replaced by NCR C-01012 boxes 2J1109 and 2J1110 from 30"x20"x8" to 30"x30"x8".
However, FCN not attached to Drawing E 46 at time of installation and thus, wrong box si e could be installed.
NCR C-01012 written on the same problem which superceded this NCR.
5 C-00935 Electrical Drawing E-791 provides dimer.sional plans for raceway supports.
E-7LS provides dimension sections for raceway supports.
FCR E-639 was not incorporated into Drawings E-748(C),
Sheets 1 & 2.
Dimensions on E-741(C) do not agree with E-748(0) sht 1.
Proposed connection details on FCR-E-639 for E748, Sh. 2, were disapproved Status of supports indetermin.Le.
'A u nn[11 77 r vil PCR C 161A written against detail ~'C
~
- HVAC) 902 at one specific location.
The FCC was dispositioned to be a revision for all locations.
However, the FCR was not attached to Drawing C-902.
r-NCR Discipline Nonconformance 7.
H-00138-zz Civil Same as H-00133-ZZ but_ror dirrerent (HVAC) hanger.
8.
H-00135-zz civil Same as H-00133-ZZ but for dirrerent (HVAC) hanger.
19.
H-00175-zz Civil FCN C924 never incorporated-into (HVAC)
Drawing C-953(Q) as so stated'in dis-position.
10.
H-00176-ZZ Civil FCN C-878 never incorporated into (HVAC)
Drawing C-935(0) as'so stated in disposition.
e
- n e
e-y m
~
\\
~
APR 19 EIof '
Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:.Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
This is to confirm the arrangements between Mr. J. Cook of Consumers Power Company and Mr. R. Gardner of the Region III staff scheduling May 4, 1984, at 1:00 p.m. as the date and time to discuss the proposed plan to conduct an independent management appraisal of the Midland Nuclear Project.
This meeting is to be held at the Quality Inn, Conference Room E, in Midland, Michigan.
The meeting will be open to the public.
At the conclusion of the meeting, the NRC will respond to r;estions and comments from members of the public on the Management Appraisal Plan.
Should you have any questions regcrding this letter, please contact me at (312) 790-5575.
Sincerely, dic R. F. Warnick, Chie Projects Branch I cc: See Distribution Next Page l
o RIl4 f, j RIII RIII RIII,C[
%4
@A fa. "o b L a n'd e...a n/db Gardner Harrison Warnic f 04/19/84 1
e arrug
[
UNITED STATES
^
NUCLEAR REGULATORY COMMISSION e
REGION lli 0
799 ROOSEVELT ROAD k
e
GLEN ELLYN. ILLINOIS 80137 APR 191984 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: ' Consumers Power Company Name of Facility: Midland, -Units 1 and 2 Docket Nos.:
50-329; 50-330 Date and Time of Meeting: May 4,1984, at 1:00 p.m.
Locatien of Meeting: Quality Inn Conference Room E Midland, Michigan Purpose of Meeting:
To discuss the licensee's proposed plan to conduct an independent management appraisal of the Midland Nuclear Project.
Region III Attendees:
James G. Keppler, Regional Administrator Others as designated by Region III NRR Attendees:
D. G. Eisenhut, Director, Division of Licensing, NRR Others as designed by NRR Licensee Attendees:
S. Howell, Executive Vice President, Midland Project J. Cook, Vice President, Midland Project Others as designated by the licensee
- This meeting will be open to members of the public.
Distribution:
R. C. DeYoung, Director, IE E. L. Jordan, Director, Division of Emergency Preparedness and Engineering Response, IE J. M. Taylor, Director, Division of Quality Assurance, Safeguards, and Inspections Programs, IE J. A. Axelrad, Acting Director, Enforcement Staff D. G. Eisenhut, Director, Division of Licensing, NRR E. G. Adensam, Chief, Licensing Branch No. 4 R. L. Tedesco, Assistant Director for Licensing, NRR J
~g,,
UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION
/
.r REGION ill
/
799 ROOSEVELT ROAD o
% * \\".'
e" CLEN ELLYN, ILLINOIS 60137
'APR 27 884 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Consumers Power Company Name of Facility: Midland, Units 1 and 2 Docket Numbers:
50-329; 50-330 Date and Time of Meeting: May 4, 1984, at 9:30 a.m.
Location of Meeting: Quality Inn Conference Room E Midland, Michigan Purpose of Meeting: To allow the licensee the opportunity to present their schedule for completion of the Midland facility.
Region III Attendees:
James G. Keppler, Regional Administrator Others as designated by Region III NRR Attendees:
D. G. Eisenhut, Director, Division of Licensing Others as designated by NRR Licensee Attendees:
- 5. Howell, Executive Vice President, Midland Project J. Cook, Vice President, Midland Project Cthers as designated by the licensee
- This meeting will be open to members of the public.
Distribution:
R. C. DeYoung, Director, IE J. M. Taylor, Deputy Director, IE E. L. Jordar., Director, Division of Emergency Preparedness and Engineering Response, IE J. N. Grace, Director, Division of Quality Assurance, Safeguards and Inspections Programs, IE J. A. Axelrad, Director, Enforcement Staff D. G. Eiserhut, Director, Division of Licensing, NRR E. G. Adensac., Chief, Licensing Branch he. 4 T. NovaL, ssistant Director for Licensing, N_R
h~)7
}
August 4. 1983 Docket No. 50-329 Docket No. 50-330 Government Accountability Project
)
Instituts for Policy Studies 3
ATTN: Ms. Billie P. Garde
\\
Director Citizens Clinic for Accountable Government 1901 Que Street N. W.
Washington, D. C. 20009 r
Dear Ms. Gards:
This letter confirms our plans to meet with you to discuss Consumers l
Power Company's Construction Completion Program for the Midland site and to answer questions and receive comments on this program. The meeting will be held at the Quality Inn Central, 1815 S. Saginaw Road. Conference Room E.
starting at 2:00 p.m. on Aangust 11, 1983.
There will be a meeting at the Great Ball. Valley Plaza. 5221 Bay City Road, at 7:00 p.m. to discuss the details of this program in a public forum.
should you have any questions, please contact me at (312) 932-2575.
Sincerely.
8' Original signed by.R. F. Warnick"
- 1. P. Warnick. Director Office of Special Casas cct See attached distribution list f
Mb 4gD t
'd Bae e e-
- r :::::::::: c:
1: :-
......... ~ ~..
~..
osu 8/3/83
]
""""'T-
......~.. ~....
. ~. ' ~
une rone sie no.noi nacu orso OFFICI AL RECORD COPY
7 l
2-b6 4 1983
~
- B. P. Garde cc:
J. W. Cook, Vice President, Midland Project DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII The Honorable Charles Bechhoefer.
ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara Stamiris Mary Sinclair Wendell Marshall Colonel Steve J. Gadler (P 7..)
Howard Levin TERA Lynne Bernabei, Government Accountability Project O
e -
0
.A.
\\
sh" To UNITED STATES c
/[p
,0, NUCLEAR REGULATORY COhmalSSHON g
g REGION ill sm g-*
- . t 7H ROOSEVELT RoAo C
4 GLEN ELLYN, ILLjNolS 60137 4'
%g '
t September 27, 1982 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Consumers Power Company Name of Facility: Midland, Units 1 and 2 Docket Nos.:
50-329; 50-330 Date and Time of Meeting: September 29, 1982, at 10:00 a.m.
Location of Meeting: Ramada Inn Central Conference Room A Midland, Michigan Purpose of Meeting: To discuss Consumers Power Company's assumption of all Quality Control (QC) activities and the resulting re-qualification of QC inspectors.
Region III Attendees:
R. F. Warnick, Acting Director, Office of Special Cases Others as designated by Region III NRR Attendees:
T. H. Novak, Assistant Director for Licensing Others as designated by NRR ELD Attendees:
W. D. Paton, Legal Counsel Others as designated by ELD Licensee Attendees:
J. W. Cook, Vice President, Midland Project Others as designated by the licensee
- This meeting will be open to the members of the public.
Distribution:
J. M. Taylor, Director, Division of Reactor Programs E. L. Jordan, Director, Division of Engineering and Quality Assurance J. Lieberman, Acting Director Enforcement Staff J. P. Murray, Jr., Director, Rulemaking and Enforcement Division, ELD D. Hood, LPM, NRR E. L. Adensam, Chief,-LB4, NRR R. L. Tedesco, Assistant Director for Licensing, NRR W. D. Paton, ELD J. W. Gilray, QAB, NRR
OCT 5 1983 Dock-t No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
This is to confirm the arrangements between Mr. J. Cook of Consumers Power Company and J. Harrison of the Region III staff scheduling ?ctober 11, 1983, at.3:00 p.m.,
as the date and time to discuss the alleged violation of the ASLB Order for the Midland site related to the rcmedial soils area and possible IE enforcement actions. This meeting is to be held at the Region III office in Glen Ellyn, Illinois.
If you have any questions concerning this meeting, we will be happy to discuss them with you.
Sincerely, 8' Original signed Ly.R. F. Varnick" R. F. Warnick, Director Office of Special Cases cc: DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII The Honorable Charles Bechhoefer, ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara Stamiris Mary Sinclair Wendell Marshall Colonel Steve J. Gadler (P.E.)
Howard Levin (TERA)
Billie P. Garde, Government Accountability Project Lynne Bernabei, Government Accountability Project R
RIII RII RIII h M' SW L dsman/db Garunerf*<
H rison Warnick 10/05/83 go }oil3
/W t n ! /1 h <4 9.
4 JG'\\
r-p a!8Ioq UNITED STATES
,8 8,
NUCLEAR REGULATORY COMMISSION T
~
~
o REGION til
[
D
- f 799 ROOSEVELT ROAD I
E GLEN ELLYN. ILLINOIS 60137
%,.... 4' t
l October 5,1983 NOTICE OF SIGNIFICANT LICENSEE MEETING s.
Name of Licensee:
Consumers Power Company Name of Facilities:
Midland Nuclear Plant, Units 1 and 2 Docket Nos.:
50-329; 50-330 Date and Time of Meeting-Tuesday, October 11, 1983, at 3:00 p.m.
(CDT)
Location of Meeting:
U. S, Nuclear Regulatory Commission, Regional Office, Glen Ellyn, Illinois Purpose of Meeting:
Enforcement Conference _to Review the Office of Investigation Report and IE Enforcecent Actions on the Alleged Violation of the ASLB Order on Remedial Soils NRC Attendees:
James G. Keppler, Regional Administrator R. F. Warnick, Director, Office of Special Cases Others from RIII, IE, NRR as appropriate Licensee Attendees:
S..Howell, Executive Vice President J. W. Cook, Vice President Others as designated by the licensee
-NOTE:
Attendance by NRC personnel at the meeting should be made known by October 7,- 1983, via telephone call'to J. J. Harrison, Region III, FTS 388-5635 Distribution:
R. C. DeYoung, Director, IE E. L. Jordan, Director, Division of Emergency Preparedness and Engineering Response, IE J. M. Taylor, Director, Division of Quality As'surance, Safeguards, and Inspection Programs, IE J. A. Axelrad, Acting Director, Enforcement Staff D. G. Eisenhut, Director, Division of Licensing, NRR E. G. Adensam, Chief, Licensing Branch No. 4 R. L._Tedesco, Assistant Director for Licensing, NRR
./
/) l l t
e i-
. j[4 ""E44(9,,
3 UNITE 3 STATES NUCLEAR REGULATORY COMMISSION
'{ } j g g REGloN lli f., E 7M ROOSEVELT ROAD
% fS.e GLEN ELLYN. ILLINOIS 60137
/
<<y %r J May 6, 1982 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Consumers Power Company-Name of Facility:
Midland Nuclear Power Pl' ant, Units I and 2 Docket Nos:
50-329; 50-330 Date and Time of Meeting: May 14, 1982, 9:00 a.m. CST Location of Meeting: USNRC,-Region til Office 799 Roosevelt Road Glen Ellyn, IL 60137 Purpose of Meeting:
To discuss disposition of results of electrical overview inspection NRC Attendees:
'7 C. E. Norelius, Director, Division of Engineering and Technical Programs C. C. Williams, Chief, Plants Systems Section R. N. Gardner, Reactor inspector Licensee Attendees:
B. W. Marguglio, Director of Environmental.and Quality Assurance Other members as designated by the licensee NOTE: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by 4:00 p.m., May 12, 1982, via telephone call to Region l i l, FTS 384-2578.
Distribution:
J. Lieberman, Acting Director, Enforcement Staff, IE E. L. Jordan, Dire-tor, Division of Engineering and Quality Assurance J. Taylor, Director, Division of Reactor Programs J. P. Murray, Jr., ELD s
b 9
4 5m,
,w---
e--
..,,.v-y
,e w.
-~.e
V
'1W&
f* @""Ig[.
UNITEo STATES I*
0g NUCLEAR REGULATORY COMMISSION
'y ,' 3p( [ g REGION 111 g,
f;. E 799 ROOSEVELT f40AD ag.,
f otem ELLvN. ILUNOIS 60137 MAY 0 6 oc2, Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook Vice President '
Midland Project 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
This is to confirm a phone conversation between W. S. Little of my staff and your office regarding plans to meet.in the Region 111 office on Friday, May 14, 1982, at 9:00 a.m.
The purpose of the meeting is to discuss the results of your. overview of electrical Inspections.
Your cooperation with us is appreciated.
Sincerely,
[ $. bwAil=
C. E. Norelius, Di rector Division of Engineering and Technical Programs cc:
DMB/ Document Control Desk (RIDS)'
Resident inspector, Rill The Honorable Charles Bechloefer, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Jerry Harbour, ASLB The Honorable Ralph S. Decker, ASLB Michael Hiller Ronald Callen, Michigan Public Service Conmission Myron M. Cherry Barbara Stamirls i
Mary Sinclai r Wendell Marshall Colonel Steve J. Gadler (P.E.)
1 h uu d v j k
fl
\\
gi 8 I-C,N g#
UNITE 3 STATES g
NUCLEAR REGULATORY COMMISSION
.y c>
g REGloN lli -
g
',p 799 ROOSEVELT ROAD
.D oLEN ELLYN, ILLINOIS 60137
,cf 4 *****
May 6, 1982 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Consumers Power Company Name of Facility:
Midland Nuclear Power Plant, Units I and 2 Docket Nos:
50-329; 50-330 Date and Time of Meeting: May 14, 1982, 9:00 a.m. CST Location of Meetir.g:
USNRC, Region ill Office 799 Roosevelt Road Glen Ellyn, IL 60137 Purpose of Meeting:
To discuss disposition of results of electrical overview inspection NRC Attendees:
C. E. Norelius, Director, Division of Engineering and Technical Programs C. C. Williams, Chief, Plants Systems Section R. N. Gardner, Reactor Inspector Licensee Attendees:
B. W. Margugi to, Director of Envi. onmental and quality Assurance Other members as designated by the.icensee
~
NOTE: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by 4:00 p.m., May 12, 1982, via telephone call to Region ill, FTS 384-2578.
Distribution:
J. Lieberman, Acting Director, Enforcement Staff, IE E. L. Jordan, Director, Division of Engineering and Quality Assurance J. Taylor, Director Olvision of Reactor Programs J. P. Murray, J r., ELD s
T.
l
'AUG 4 943 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Gentlemen:
This is to confirm the arrangements between James W. Cook of Consumers Power Company and Robert F. Warnick of the Region III staff scheduling August 12, 1983 at 9:00 a.m., as the date and time to discus's the Systetatic Assessment of Licensee Performance (SALP) for the Midland site. This meeting is to be held at the Quality Inn, Midland, Michigan.
While this meeting is a presentation and discussion forum between Consumers Power Company and the NRC, it will be open to other interested parties as observers.
If you have any questions concerning this SALP Meeting, we will be happy to discuss them with you.
Sincerely,
" original signed by.R. F. Warnick" R. F. Warnick, Director Office of Special Cases cc: See attached distributica list R, vg
'~ ~~
3 o"c w. awy..... y..
.. pgsy
...... i
- "t >;. Ga rdner/Is.
.Rarripon..,,,Warnick.,
- . 8 / 3/. 8 3..........................
we norm m no.soi unci mo -
~~
OFFICIAL RECORD COPY
p ona;u UNITED STATES
,? _
[o, NUCLEAR REGULATORY COMMISSION 2
o REGION 118
{.-
p3 799 ROOSEVELT ROAD 8,
f.
A, v p'g OLEN ELLYN, ILLINOIS 60137
~
May 6, 1982 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee:
Consumers Power Company-Name of Facility:
Midland Nuclear Power PI' ant, Units I and 2 Docket Nos:
50-329; 50-330 Date and Time of Meeting: May 14, 1982, 9:00 a.m. CST Location of Meeting:
USNRC, Region 111 Office 799 Roosevelt Road Glen Ellyn, IL 60137 Purpose of Meeting:
To discuss disposition of results of electrical overview inspection NRC Attendees:
C. E. Norelius, Director, Division of Engineering and Technical Programs C. C. Williams, Chief, Piants Systems Section
~} R. N. Gardner, Reactor Inspector Licensee Attendees:
B. W. Marguglio, Director of Environmental and Quality Assurance Other members as designated by the IIcensee NOTE: Attendance by NRC personnel at the.NRC/ licensee meeting should be made known by 4:00 p.m., May 12, 1982, via telephone call to Region lil, FTS 384-2578.
Distribution:
J. Lieberman, Acting Di rector, Enforcement Staff, IE E. L. Jordan, Director, Division of Engineering and Quality Assurance J. Taylor, Director, Division of Reactor Programs J. P. Murray, Jr., ELD l
)
- l
'o, UNITED STATES E
' },
NUCLEAR REGULATORY COMMISSION M#
.J WASHINGTON, D. C. 20555 N na t:..
l
?.
g,..... #g m
8 132 I
b-g~i Docket Nos.: 50-329 ig-). ;
g and 50-330
.m.r.u 5if y ;
i g
m.
1 i
APPLICANT:
Consumers Power Company A
l bKE 6 f u. S l F/,CILITY:
Midland Plant, Units 1 and 2
SUBJECT:
SUMARY OF MEETING HELD WITH CONSUMERS POWER ON AUGUST 4,1982 -
MIDLAND PLANT, UNITS 1 AND 2 On August 4,1982, the NRC staff met in Bethesda, Maryland with " Consumers Power Company and Bechtel Power Corp. to discuss use of anchor bolts in masonry walls at. the Midland Plant. This subject relates to section 3.B.2 l
of the Midland SER. A list of. meeting attendees is attached as Enclosure 1.
SUMMARY
The NRC staff is preparing Supplement No. 2 to the Midland Safety Evaluation Report (NUREG-0793). Since issuance of the SER in May 1982, Consumers Power has supplied the additional information needed by the staff to complete evaluation of masonry wall usage at the Midland Plant. This item was listed as confirmatory issue No. 3 in section 1.8 of the SER. The additional information transmitted by a Consumers Power letter dated July 23, 1982, included a Bechtel report on testing of concrete expansion anchors installed in concrete block walls (Bechtel. Report No. 7220-CTR-1-1). This report resulted in design recommendations regarding installation of grouted and wedge-type expansion anchors in grout-filled concrete masonry walls. Bechtel made a presentation to the staff on the purpose and approach used in this testing, using the above report as the basis for discussion. Application and installation criteria / practices were discussed in detail. An anchor bolt of the type used at Midland was used during the discussion for demonstra-tion purposes. The effects of embedment length, anchor size and installation torque were also discussed.
After asking a nunter of questions, the staff concluded that a sufficient amount of information has probably been provided to permit completing the safety evaluation in this area. The staff intends to publish its conclusions regarding the masonry wall evaluation in Supplement No.' 2 to the Midland SER.
h.
Ronald W. Hernan, Project Manager Licensing Branch #4 Division of Licensing
Enclosure:
As stated cc:
See next page Al38 l 31882 00
=-
t;0!r-fa. Fr. cr
~'
- 7. 6 A
- --'."* j
- f ON
- +-...... ;
-~
'~.
I' + 3
!. _ _.. Z
~4%
1
.. A i
RGIN i
- ical speciffation limit specification method-abcock & Wilcox
. Levandoski
. Rombaugh
. Kochendarfer
. Coppola 1
, Project Manager
'No. 4 sing W '.
M for licenses are open
- ervenors, or other ling and Statement of i
N ki Agy 1
-= ; :. e LIST OF ATTENDEES I
NRC N..Romney R. Hernan CONSUMERS POWER COMPANY D. Budzik R. Oli ve r i
j T. Thiruvengadam i
BECHTEL J. Rotz 4
i P. Regupathy D. Lewis l
e i
i 4
4 i
i I
L
PRINCIPAL STAFF.
fp? s k.t _ C i
r.
]f[
v&
3*; qr.,
n 4,_____
c.:2
- ,3 ~?
N:T f
titan 5MITTALISLIP u.
c';s.
f,,
ROUTING AND
/
WJ gone e / Post)
Lobby H-St.
.Aeoner
- 3. Vanessa Washington -
3.
m to.ns R=m 4.
Per Coreveresten re f
for Clearance Prepare Repey w,eo Approval For Cerroetion See We As Reevested Foe Your leformationSagnefure Circulate tavestegste for the weeks Justify l
Comene t Attached is the NRR Mtg. Schedu eThe encl n
Coordmeteen 1982 weeks only of August 16 and 23, for the forthcomings sent to t schedule of meetings includes those noticeLicensing as of August 13,'
982.
R. Purple DISTRIBUTION P404A M. Williams P404B Receptionist H'~. Dentoh ~
E. Case P436
. Bulletin Board J. Carter P43B M. Hungerbuhler J. Funches 403.E/W So.
DL R/F R. Senseney EW-359
- Regional AdministratorACRS. H-1004 EW-5 263(2) *Stan Schafer,Y, H-ll49 E. Jordan 216 T. Combs, SECMNBB 6113 G. Kelly C. Michelson MBB-7710 V. Stello
- FAX ss J. Heltemes 4 88-6709como et asennets. eencurrences, e.
- 7. Rehm 0o Moi vee ins form = etetsareness, and sivmler actsons Room No --Stdg.
l
/ Post)
.528 PROM:(Neme, etg. syment. Agency Phone No.
47980 76)
Mary Schaaf OPfloNAL FOR88 41 (Rev. 7-b
-31888
_ to2 aoss-
..s.
. s.:.n, st:n l
l s
e w
.s_.,
~
,-+-+--g--
-,e,4
- r. - -, - - - - _ -, __---:-
m-m.
August 13, 1982 MRR MEETING NOTICES
- APPLICANT /
NRR CONT ACT ATTENDEES _
DOCKET PURPOSE V. Nerses LOCATION Florida Power & Light NUMBER DATE/ TIME Working session to review the detail (St. Lucie 2) 50 389 Triangle Towers items to be placed in the Radiological 8/16-19/82 16th fl., FPAL Ef fluent and Administrative Controls 9:00 am Meeting Of f.
portions of the Tech. Speci fications E. Licitra l,
Bethesda Carolina Power & Light Conduct a review meeting for the Westinghouse Shearon iarris Site I&C portions of the Shearon Harris EBASCO 50 440 8/16-20/82 50 441 near Raleigh, NC 1:00 8/16 DOE
--..R.. Stark.
I SAR 8:30 remaining days Clinch River Breeder Reactor
$0-531 AR-5033 TMBDB G. Edison 8/17/82 Bethesda Ohio'n.El&dttit.Cb; __
Discuss the 6 asis for routing of Kansas Gas & Elec. Co.
8:30 am Bech{el Offices instrumentation Nutlear Projects, Inc.
50-4B3 5/11/52 Gaithersburg, Md.
(Callaway1) 9:00 am P. Wagner Duke Power Co.
Discuss Radiological Ef fluent 50-269/270 Oconee Site Technical Specifications 8/18-19/82
& 287 Seneca, SC 11 :00 am I
492-7166 PLEASE BE ADVISED THAT DAILY RECORDINGS CAN ailable and placed in the respective docket file (s) in l
- Copies of sunmaries of these meetings will be made public y av the NRC and local public document rooms.
GW
=
- 3. <--
1 l",
.l og
, [,
.s
,p
.y
% f,{ " w r,,s' i.,
)
i
% ].
,; {:
L}
f-L'
~
s j-c.
,l J'y=
?
,/
u y ;-
/
']
~.
NRRltQINGHOTICES_*. ',///, -'
/ %p a
' ' / ";
.m l.
'/
APPLIEMT/ '
";RR COMT QT g f
/
5 - ',i,g
' I ' A.T.nTEltDEES
!y i
~
]
j T
t PURPOSE
/
,p
_v i
.)
DATE/ TIME-.[
NLMER LOCATION,p Philadelphia Electric Co. H. Abelson-100CKET*
'L f'
-i
!3merick ' technical meeting to P
., C i-(
t c s.
~, J 8/18/82' j $0-352
~!blid3y 1m etiscuss PECO responses to: draft r
.,1 o,
..c PetuC4:, PA i
m...
h
'0, Sells ~
e,Jewironmental questions"rf 5.m:the FERC o 50-353
.!,;!- 8:30 am a
3 U/../
/
~/ 4 c>
~
DC-1in~c
, MNBB-171'3
' t. ion-M a high voltage:
/
s 3,
r 3.
60 498 Bethesda onethe_STP site '
3 -
E. McKenns ;.)'.
l 8/19/82 50-499 9:00 am j
/
>]suthern Calif. Edison
' ~
~.
- , ~'
Discuss the licensee's tssessment)
' (Sap Onofre 1)
.q.!.]f,f'r of SEP Topics ill-5. A and flics.B P 110 i
8/19/8k Bethesda (Pipe.Becak inside and Outside
?.-
t' f,;:, i, r
_ M.
~
Containment) 9:00 an; s
'5. Chesnut Cor.aon;,1calth Edison Co.
~
~
Power Systems Branch sjte, visit-
~
a
,,,s
~
s S *t 50-454
',. Byron Station 1
E. Doolittle s
-tyron, Ill:
7 Duquesne Light Co.
8/19/82
.SfN 50-455 9:00 am
=
_7 Dis Jss" overview of OL application 8/19/82
~ 50 412
,. hNW-6110 review for Boaver Valley 2
.T. Wambach
/.
Bethesda Consumers Power Co.
Licensee to make presentation of (Palisades) 9:30 am t
proposed modifications to heating, NNBB-171.3 ventilating and air conditioning Bethesda
.'3/19/82 1:00 am This includes the l
systems.
modifications for response to i
NUREG-0137, item 111.D.3.4,
" Control Room liabitability" C. Nelson Yankee Atomic Elec.,Co.
Discuss small break (L0dA) models P-422 being developed for Maine Yankee B/19/82 Bethesda (NUREG-0737 Item II.K.3.30) i 9:00 am i
492-7166 RECORDINGS CAN BE HEARD ON
,PLEASE BE ADVISED THAT DAILY d in the respective docket file (s) in l
' "-~ =aatings will be made publicly available and p ace f
~ -..
7
NRR MEETING NOTICES
- DOCKET APPLICANT /
DATE/ TINE NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 8/23/82 50-329 P-110 Discuss Hidland SER Open item #1 on Consumers Power Co.
R. Hernan i
9:00 mn 50-330 Bethesda nearby explosive hazards 8/23/82 50 400 P-110 Discuss Shearon Harris Reservoir Carolina Power & Light D. Sells I
9:00 am 50-401 Bethesda Reanalysis l..
e l
8/24/82 50-313 P-422 Discuss methods of inspecting the fly Arkansas Power & Light G. Vissing 1:30 pm Bethesda wheels of reactor coolant pwnps (Arkansas l}
l
~~""8/24/82~
56 '528' P-l'i4
~
Yo app 5al staff posit'fn that~ the ~ ~
~APS'
"~
~ ~ ~ '
o E'.'L1citta -
9:00 am 50-529 Bethesda dampin9 value for cable trays shall Bechtel i
50-530 be 15% instead of 20%
8/54-26/82 50-341 fermi 2 Site Observe conitruction and obtain ihfor-Detroit Edison Co.
L. Kintner 9:00 am Monroe Cty.,
mation regarding completion of con-Michigan struction and preoperational tests for use by the NRC Caseload Forecast Panel I
PLEASE BE ADVISED THAT DAILY RECORDINGS CAN BE ilEARD DN 492-7166 l
I
- Copies of summaries of these meetings will be made publicly available and placed in the respective docket file (s) in j
the NRC and local public document rooms.
~
i e
l i
c-V
,.,g ti e
ql 4
?
g o.
pa a' coq usirso states
[*J
.[
NUCLEAR REGULATORY COMMISSION
,f[fh
~
,j gf 3,, r.(
g Q,
. jj neciou sii
^-
=
e,, b,( y [v e _
799 noostvicci meAo 5
j OLEN Eu,YN, ILUNOIS'60137 D d
.\\
, i"
,MAY 0 6 bo.
2 d
Docket No. 50-329 N
y*
Ducket No. 50-330 N 1
\\'
Consumers Power Company.
'1 ATTN:
Mr. James W. Cook Vice. President I
Midl'and Project i
S g 1945 Vest Parnall Road T
Jackson, MI 49201
,}
l
, Gentlemen:
T
' O, This is to confirm a pho^ne conversa' tion between W. S. Little of my staf f and your office regarding plans to meet.in tbc Region lli office on e
Friday, May 14, 1982, at 9:00 a.m.
The purpdse of the meeting is to discuss the?results of y'our overview of electrical. inspections.
Your cooperation with us _Is appreciated.
~.,
Sincerely, s
{ $. bev)&
+'
C. E. Norelius, Director
'N
(
Division of Engineering and -
N Techn ical. Programs
~
cc:
DMB/ Document Control Desk (RIDS)
/. Resident inspector, Rlli s The Honorable Charle!s Bechloefer, ASLB The. Honorable Frederick P. Cowan, ASLB The Honorable Jerry Harbour, ASLB The Honorable, Ralph-S. Decker,, ASLB Michael Miller' vs
. Ronald Callerc, Mir.h'igan Pub'lic
- Service Commisblon s
n hyron M. Cherry Barbara Stamiris T
Mary Sinclair Wendell Marshall Colonel Steve J. Gadler (P.'E.)
-S 5
w T'~
f o' ?,/"dk b
.c d
s i
Y
r-
/]lQh*.L\\
.t AI' C 5
..m.a I
Y Docket No. 50-329 Docket No. 50-230 Consumers Power Company ATTN:
Er. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Ger. tic 2.:
t Jh : :.. curing c telephone conversction on Janucry 4, 1K3, en Er f c rec:n.t Conference vill be held at the ERC's Region III office in Glen Ellyn. Illinois on January 18, 1983 at 10:00 a.m.
The purpose cf the Enforce mat Conference is to discuss the results of the special tcan in:pection of the Diesel Generator Building. Neubers of both of our staffs vill be present.
l Or!ginai if gned by A. sert Davis James G. Kappler Regional Administrator cc: DYJ/ Document Control Desk (RIDS) hesident Inspector, RIII Tne Eocorable Charles Bechhoefer, ASLB Tne Honorable Jerry Harbour. ASLB The Honorable Frederick P. Cowan ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan Public Service Comission 1 yr: :
1.. Cherry buLcrr Staciris
- F.ary Sinclair Kcadc11 Marshall Celenel Steve J. Cadler (P.E.)
go n '
1_I h L_[
l qjv
\\
Vf) g T
+ RII b....;..
..f.
. O..f
............f........
c"
"'E.Gardner/ls.'.S E
U.,,.
. D a,v, s,,,,,,,
ep, l er,,,,,,,,},
b 8
I
.l/d. f.j'l
./. 4/.l. d.
A 01/04/s.
i m
.>.ce merirlai prenon enov
{:
~
- MW, UNITED STATES NUCL E A r, F E G U L t. T O r. Y CO'." *.'!! ! D'.
['
't l
F.to tore m
,-w,,,,.,
7er a sost vt., r.ose L *- 0. /.
. s tt e, e ut.vs, stussis cois?
'....J"'
January 4. 1983 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of. Licensee: Consumers Power Company Name of Facility: Midland Nuclear Power Plant, Units 1 and 2 Docket Nos.:
50-329; 50-330 Date and Time of Meeting: January 18, 1983 at 10:00 a.m.
Location of Meeting:
U. S., Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Purpose of Meeting: Enforcement Conference to discuss the results of the special team inspection of the Diesel Generator Building Region III Attendee.s:
James G. Keppler, Regional Administrator Others as designated by Region III NRR Attendees:
D. Hood, Licensing Project Manager Others as designated by NRR IE Headquarters Attendees:
J. H. Sniezak, Deputy Director, Office of Inspection and Enforcement Others as designated by IE Headquarters Licensee Attendees:
J. W. Cook, Vice President, Midland Project Others as designated by the licensee Distrubution:
J. M. Taylor, Director, Division of Quality Assurance, Safeguards, and Inspection Programs E. L. Jordan Director Division of Emergency Preparedness and Engineering Response J. Axelrad, Acting Director. Enforcement Staff J. P. Murray, Jr., Direct'r, Rulemaking and Enforcement Division, ELD D. Hood, LPM, NRR E. L. Adensam, Chief, LB4, NRR R. L. Tedesco Assistant Director for Licensing, NRR t
W. D. Paton, ELD J. W. Gilray, QAB, NRR R. C. DeYoung, Director, Office of Inspection and Enforcement 9
v.
r
~
l'NB1EO sTAMs p*, ' ' *t,#*,
~ NUCLEAR REGULATORY COMMISSION
[
y 2
g REGION 111
{ >, 4;', l [, g 70W RooSEVE LT RO AD p
,s ;A -
otts r u.YN, ItuNOIS 601J7 o,
?-
....e September 7, 1982 NOTICE OF SIGNIFICANT. MEETING Date and Time of Meeting: September 9, 1982 at 9:00 a.m.
Location of Meeting: Phillips ' 8uil ding Bethesda, MD Purpose of Meeting: To discuss Midland remedial soils issues Region III Attendees:
W. D. Shafer, Chief, Midland Section Others as designated by Region III NRR Attendees:
D. Hood, Licensing Project Manager Others as designated by NRR Distribution:
J. M. Taylor, Director,' Division of Reactor Programs E. L. Jordan, Director, Division of Engineering and Quality Assurance J. Lieberman, Acting ' Director, Enforcement Staf f J. P. Murray, Jr., Director, Rulemaking and Enforcement Division, ELD D. Hood, LPM, NRR E. L. Adensam, Chief, L84, NRR R. L. Tedesco, Assistant Director for Licensing, NRR W. D. Paton, ELD J. W. Gilray, QAB, NRR
.g.
L'
F
[l) / }
e oo cec
'*f s
UNITED STATES J
['
- g NUCLEAR REGULATORY COMMISSION
~LP,lNCI PKl. ST AFF y, ;
WASHINGTON. O. C. 20555
,f,\\
i IENF1
- 4 O/RA SCS b
- l
%..... jf SE t 81983 t/RA OAO QPRP
$lO Docket Nos.: 50-329 OM, OL 7
Vogyg r
/
casse 1
(yuttrL-sta ))
og I
!EMORANDUM FOR Elinor G. Adensam, Chief
~
Licei. sing Branch No. 4 Division of Licensing FROM:
Darl S. Hood, Project Manager Licensing Branch No. 4 Division of Licensing NOTICE OF MEETING AND SITE VISIT T0 REVIEW HVAC SYSTEMS
SUBJECT:
DATE AND TIME:
October 4, 1983 1:00 pm - 6:30 pm October 5, 1983 8:30 am - 3:00 pm October 6, 1983 Noon
- 6:30 pm LOCATION:
October 4 & 5 October 6 Midland Plant Site Bechtel 777 E. Eisenhower Parkway Midland, Michigan Ann Arbor, Michigan PURPOSE:
To review structural adequacy of as-constructed HVAC systems Consumers Power Company PARTICIPANTS:
NRC Danielson D. Budzik, et al.
D. Terao C. Sellers Bechtel W. LeFave N. Swanberg, et al.
D. Hood, et al.
M ee t.
o, E Darl S. Hood, Project Manager Licensing Branch No. 4 Division of Licensing
Enclosure:
cc:
See next page 1/ The October 4 & 5 meetings between the NRC and applicant are open for interested members of the public, petitioners, intervenors, or other r
~
parties to attend as observers pursuant to "Open Meeting and Statement of NRC Staff Policy", 43 Federal Register 28058, 6/28/78. The active nature of the October 6 on-site visit does not provide for public observation.
Requests for separate site tours should be directed to the Utility.
[
~
gqgg a
MIDLAND Mr. J. W. Cook Vice President Constners Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Three First National Plaza, Lansing, Michigan 48909 Sist floor
- Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue James E. Brunner, Esq.
St. Paul, Minnesota 55108 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Consumers Powar Company 720 Law Building 212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
Mr. R. B. Borsum SIGMA IV Building Nuclear Power Generation Division Richland, Washington 99352 Babcock & Wilcox 7910 Woodmont Avenue, Suite 220 Mr. I. Charak, Manager Bethesda, Maryland 20814 NRC Assistance Project Argonne National Lauoratory Cherry & Flynn 9700 South Cass Avenue Suite 3700 Argonne, Illinois 60439 Three First National Plaza Chicago, Illinois 60602 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
,,,,r--
m
p-Mr. J. W. Cook -
cc: Mr. Ron Callen Michigan Public Service Commission 6545 Mercantile Way P.O. Box 30221 Lansing, Michigan 48909 Mr. Paul Rau Midland Daily News 124 Mcdonald Street -
Midland, Michigan 48640 Billie Pirner Garde Director, Citizens Clinic for Accountable Government Government Accountability Project Institute for Policy Studies 1901 Que Street, N.W.
Washington, D. C.
20009 Mr. Howard Levin, Project Manager TERA Corporation 7101 Wisconsin Avenue Bethesda, Maryland 20814 Ms. Lynne Bernabei Government Accountability Project 1901 Q Street, N.W.
Washington, D. C.
20009 l
l
r Supplemental page to the Midland OM, OL Service List Mr. J. W. Cook _
cc:
Commander, Naval Surface Weapons Center ATTN:
P. C. Huang White Oak Silver Spring, Maryland 20910 Mr. L. J. Auge, Manager Facility Design Engineering Energy Technology Engineering Center P.O. Box 1449 Canoga Park, California 91304 Mr. Neil Gehring U.S. Corps of Engineers NCEED - T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 Charles Bechhoefer, Esq.
Atanic Safety & Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Dr. Frederick P. Cowan Apt. B-125 6125 N. Verde Trail Boca Raton, Florida 33433 Jerry Harbour, Esq.
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Geotechnical Engineers, Inc.
ATTN:
Dr. Steve J. Paulos 1017 Main Street Winchester, Massachusetts 01890
- e urw%,
- p r.,
e-T - y,:th '" "" # "^
UNITED STATES
'j NUCLEAR REGULATORY COMMISSION
.[N
- ~ - ' '
WASHINGTON, D. C. 20555
{'
- ,.; f
~' /
November 8,1983 77 "g--
3
-5' 1
. n+1 DocU,tNos: 50-329 and 50-330 MEMORANDUM FOR: Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing FROM:
Melanie A. Miller, Project Manager Licensing Branch No. 4 Division of Licensing
SUBJECT:
NOTICE OF MEETING - MIDLAND FIXED MARGIN TECPNICAL SPECIFICATIONS DATE & TIME:
November 15, 1983 1:00 p.m. - 5:00 p.m.
. LOCATION:
Maryland National Bank Building 7735 Old Georgetown Road, Bethesda Room 6110 s
PURPOSE:
To disduss changing the current technical specifiation limit methodology to fixed margin technical specification method-ology. An agenda is enclosed.
PARTICIPANTS:
NRC CPCo Babcock & Wilcox D. Hoffman M. Capicchioni F. Levandoski W. Brooks D. Wuokko C. Rombaugh M. Miller T. Hollowell R. Kochendarfer B. O'Donnell E. Coppola J. Umbarger qY(ks.A Melanie A. Miller, Project Manager Licensing Branch No. 4 Division of Licensing
Enclosure:
As stated cc: See next page E eetings between NRC technical staff and applicants for licenses are open M
for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting and Statement of NRC Staff Policy," 43 Federal Register 28058, 6/28/78.
EeSi p 7 4 2,Ill?DS$0
r
~
~
MIDLAND Mr. J. W. Cook Vice President Cons mers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Departuent of Public Health
-Isham, Lincoln & Beale P.O. Box 33035 Three First National Plaza, Lansing, Michigan 48909 Sist floor
- Chicago, Illinois 60602 Mr. Steve Gadler i
2120 Carter Avenue James E. Brunner, Esq.
St. Paul, Minnesota 55108 Cons mers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Sumnerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River i
Stewart H. Freeman Freeland, Michigan 48623 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Protection Division Consubers Power Company 720 Law Building 212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
2 Mr. R. B. Borsum SIGMA IV Building Nuclear Power Generation Division Richland, Washington 99352 Babcock & Wilcox 7910 Woodmont Avenue, Suite 220 Mr. I. Charak, Manager Bethesda, Maryland 20814 NRC Assistance Project Argonne National Laboratory Cherry & Flynn 9700 South Cass Avenue Suite 3700 Argonne, Illinois 60439 Three First National Plaza 4
Chicago, Illinois 60602 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 m,
,,.-.-.,---e,- - - - - - -
.,-------,--------,--e
,---------,,-w---,,--wwem,.
,-e-,
,-g, r--
p-
Mr. J. W. Ccok -
cc:
Mr. Ron Callen Michigan Public Service Commission 6545 Mercantile Way P.O. Box 30221 Lansing, Michigan 48909 Mr. Paul Rau Midland Daily News 124 Mcdonald Street Midland, Michigan 48640 Billie Pirner Garde Director, Citizens Clinic for Accountable Government Government Accountability Project Institute for Policy Studies 1901 Que Street, N.W.
Washington, D. C.
20009
' Mr. Howard Levin, Project Manager TERA Corporation 7101 Wisconsin Avenue Bethesda, Maryland 20814 Ms. Lynne Bernabei
. Government Accountability Project 1901 Q Street, N.W.
Washington, D. C.
20009 l
l i
r FIXED MARGIN TECHNICAL SPECIFICATIONS ON MIDLAND _
NOVEMBER 15, 1983 1:00 p.m. - 5:00 p.m.
I.
. INTRODUCTION OBJECTIVES OF THE MEETING REASONS FOR CONSIDERING TECH SPEC LIMIT METHODOLOGY CHANGES II.
CURRENT TECH SPEC LIMIT METHODOLOGY CONTROL ROD, IMBALANCE AND TILT MONITORING STANDARD TECH SPEC F AND F MONITORING 0
0 46 III.
' FIXED MARGIN TECH SPEC LIMIT METHODOLOGY SIMILARITIES TO PRESENT F AND F MONITORING 0
0bt SYSTEM COMPONENTS SYSTEM UNCERTAINTY OPERATOR DISPLAYS UNIQUE FEATURE
SUMMARY
IV.
CURRENT STATUS PHASE I REMAINING WORK V.
POTENTIAL IMPLEMENTATION SCHEDULE NRC OBSERVATIOMS/ FEEDBACK ESTABLISH SCHEDULE FOR FOLLOW-UP ITEMS I
i I..
I
/I5' 71 NOV 1 4 GB3' Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:
Mr. James W. Cook' Vice President Midland Project 1945 West'Parnall Road Jackson, MI 49201 Gentlemen:
This is to confirm the arrangements made between Mr. S. Howell of Consumers Power Company and me scheduling November 16, 1983, at 9:00 a.m., as the date and time to discuss the alleged violation of the ASLB Order for the Midland site related to the remedial soils area and possible IE enforcement actions. Thi's meeting is to be held at the Holiday Inn-O' Hare, 3801 N. Mannheim Road, Schiller Park, Illinois.
If you have any questions concerning this meeting, we will be happy to discuss them with you.
Sincerely,
" Original signed by.R. F. t!:rnick" R. F. Warnick, Director Office of Special Cases cc: DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII The Honorable Charles Bechhoefer, ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara Stamiris Mary Sinclair Wendell Marshall Colonel Steve J. G3dler (P.E.)
howard Levin (TERA)
Billie P. Garde, Government Accouatability Project Lynne Bernabei, Government Accountability Project Stone and Webster Michigan, Inc.
R A
RIII RIlk L RIII
$Y RW 60*
- ffd La amanns Gardner Harrison Warnick (l'l l}
m LO'N
'AUG 4 m3 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN: Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road Jackson, MI 49201 Gaatismen
- I This is to confirm the arrangements between James W. Cook of Consumets Power Company and Robert F. Warnick of the Region III staff scheduling August 12,
- l 1983 at 9:00 a.m., as the date and ei== to discuss the Systematic Assessment of Licensee Performance (SALP) for the Midland site. This meeting is to be held at the Quality Inn, Midland, Michigan.
While this meeting is a presentation and discussion forum between Consumers Power Company and the NRC, it will be open to other interested parties as observers.
If you have any questions concerning this SALP Meeting, we will be happy to discuss them with you.
- i Sincerely.
l1 l
" Original signed by.R. F. Warnick" i
i' R. P. Warnick, Director l
Office of Special Cases 4
'i
,I cc: See attached distribution
!I list
- I t
l e
i '.
Ih h
b 2,A, 9 h-y
?
o 1
i
.. Q..... f'{.). ~
o'na,.R111
' -l' 5 *"*"'%. Gar
/1s.
.R4TXiPM....
- Warn,1@,., l
,,_,,_ ' '_ _ m m m m
~
~~ ~.~.~
~
," m
.m
. al3).83.......
- ~ - 'b -
.............. ~
- ~ ~. ~ ~ -
~ ~ ~ ~ ~ ~. ~ ~ -
ar,o.. m oo.aoi Nacu o2ao OFFICIAL RECORD COPY
o g
Consumers Power Company AUG 4
cc: DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII The Honorable Charles Bechhoefer, ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan Public Service Commission Myron M. Cherry Barbara Stamiris Mary Sinclair Wendell Marshall Colonel Steve J. Gadler (P.E.)
Howard Levin, TERA Billie P. Garde, Government Accountability Project Lynne Bernabei, Government Accountability Project 1
)
l 4
b UNITED ST A1LL
!p* ** %
NUCLEAR REGUL ATOR Y COMt.11SSION
^
REGloN IH
,(,
f E
CLEN ELLYN. ILLINOl$ 60137 C.,
~ af
- ...+
November 14, 1983 NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Consumers Power Company Name of Facility: Midland Nuclear Plant, Units 1 and 2 Docket Nos.: 50-329; 50-330 Date and Time of Meeting: Wednesday, November 16, 1983 at 9:00 a.m. (CST)
Location of Meeting: Holiday Inn-O' Hare 3801 N. Hannheim Rd.
Schiller Park, IL Purpose of Meeting: Enforcement Conference to re-review the Office of Investigation Report and IE Enforcement Actions on the Alleged Violation of the ASLB Order on Remedial Soils NRC Attendees:
R. C. DeYoung, Director, Office of Inspection and Enforcement James G. Keppler, Regional Administrator, RIII J. Lieberman, Director, Division of Regional Operations and Enforcement, ELD Others from RIII, IE, NRR, as appropriate Licensee Attendees:
J. Selby, President and Chairman of the Board S. Howell, Executive Vice President Others as designated by the licensee NOTE: Attendance by NRC personnel at the meeting should be made known by November 15, 1983, via telephone call to J. J.: Harrison, Region III, FTS 388-5635 Distribution:
R. C. DeYoung, Director, Office of Inspection and Enforcement E. L. Jordan, Director, Division of Emergency Preparedness and Engineering Response, IE J. M. Taylor, Director, Division of Quality Assurance, Safeguards, and Inspection Programs, IE J. A. Axelrad, Director, Enforcement Staff E.'G. Eisenhut, Director, Division of Licensing, NRR E. G. Adensam, Chief, Licensing Branch No. 4 R. L. Tedesco, Assistant Director for Licensing, NRR