Application for Amends to Licenses NPF-4 & NPF-7,revising Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements Consistent W/Sts
ML20094E532
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 08/01/1984
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20094E541 List:
References
707A, NUDOCS 8408090235
Download: ML20094E532 (4)


Text

r- '

% . - ,r'

~

/

,.8,'

Q 8TRGINu EiAcimc usu Powen Courm Ricnwo5n,Vxnorwx12 0201 -

W,L.Stawont s Vscs Passapewr Necs.mAB oramAnowe . - August 1, 1984

{ ~ .

y* - -

_ , 3 7

.i ,, ./.

f. ,

s -

Mr. Harold,R. Danton, Director '

Serial No. 707A-Office of Nuclear Reactor-Regulation N0/JUL:acm Attn:' Mr. Jacec R.' Miller, Chief Dockot,Nos. 50-338

-Operacing Reactors Branch No. 3 50-339

' Divisjon of Liccucing -

License Nos. NPF-4 U. S. Ne,cicar Regulatory Cpemission . 'NPF-7 WashingtEn, A C. 20S55 Gentlemeatg', ,

s ~

^'

VIRGINIA ELECTRIC AND POWER COMPANY

+

NORTH ANNA 1ENP.R' STATION" UNIT NOS. J AND 2

. 'JEVISION TO PEOPOSEli TECHNICAL SPECIFM*.TTON CHAEGES

~

Byfour letter dated December 13,1983 (Serin No. 707), we proposed Technical 7"

Specification changes for North Anna Unit Nos. I and 2. 'The proposed changes

-were! ta revise Technica1 ' Specification 3.0.3 .

and ths " Bases related to

. Technical Specification 3.0.3. -

s i '

- lIn)our previous submitral, we = proposed changes that were hybrid in nature to

/ the Standardized Technical Specifications (STS) for Westinghouse Pressurized 1 1 Water . Reactorai The -lead-in to ti.r act. ton; statement time requirements for Technical Specification 3.0.3'was differene than the STS and our ba' sis for the ~

-changes sas that[the changea conformed vith NRC regulsticas.

w n  ; .#

The l purpose of itrais letter is to revise our previous submittal to be completely' consistent with.thelSTS for North'Ahna,Init Nos. I and 2 Technical Specifications 3.0:3 and the Baees related !to Technical Specificationsc 3.0.3.

The proposed -TedhNical Specification changes for North Anna Unit No. l'are provided in Attachment 1. The~ proposed changes 7for~ North Anna Udit No. 2 are provided in. Attachmen't 2. "A discussicn of '~ tie proposed Technical p Specification -chatigesLis provided in' Attachment-3. -

g

, ,c s

9 This1 revised 1reqtiest' has been' reviewed and f~approved by the Station h'uclear

' Safety and ' Operating - Constittee and the Safety Evaluation and Control Staff.

-It has been ... determined t"

  • thin ~ revised , request does not involve an ~

unreviewed safety. question as' defined in ,10 CFR 50.59 and does 1not pose a '

significant..hazarde consideration I

as defined i

in:10 CFR 30.92.

s ,

~,

' ~

g h ,

  • \ ,-

QQf

~

8400090235 840001

.e - w.

PDR ADOCK 05000338 -

>s I .m i p PM f

s:

V:monwaa En.sctasc Ano Powsi Courary to . Harold R. Denton i

>~

Since this'1etter1 revises our previous' submittal and licensee amendment fees

~

were'> submitted with the previous submittal, no additional license amendment-1 fees should be required.

"i'- Very truly urs, W. L. Stewart

-Attachments:

, _ _1.-' Proposed Technical Specification Changes - Unit 1 2.. Proposed Technical Specification Changes - Unit 2 13.j- Discussion of Proposed Technical Specification Changes icci Mr.' James P.-O'Reilly-

Regional Administrator Region II Mr. M.'
W.- Branch -

NRC Resident Inspector

d. ' . North Anna Power Station

.Mr.' Charles Price

- ~ Department.of Health

' 109 Governor Street Richmond,~, Virginia'23219.

r lt ,

~

v j

'T J-.-

x Np

.4 2

__J

r ,

COMMONWEALTH OF VIRGINIA )

)

- CITY OF RICHMOND )

I The foregoing document was acknowledged before me, in and for the City and

' Commonwealth aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to - execute and file the foregoing document in behalf of that

. Company, ' and the statements in the document are true to the best of his knowledge and belief.