- - _

!3/4 ' LIMITING' CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY 8

i+

jf -LIMITING CONDITION FOR OPERATION

. 3. 0.1. Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each Specification.' .

~

f  ; 3.0.2 ? Adherence to the requirements of the Limiting Condition for Operation S and/or associated ACTION within the 'specified time interval shall constitute

- compliance with the ' Specification. . In the event the Limiting Condition for Operation is ' restored prior- to expiration of the specified time interval, completion of'the ACTION statement is not required.

L3.0.3 When a Limiting Condition for Operation is not met, except as provided

' -in the associated-. ACTION requirements, within one hour ACTION shall be

_ > initiated:. to place the unit in a MODE in which the Specification does not

' ~

apply by placing it, as applicable, in:

/ .o

1. At-least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
2. ;At least HOT SHUTDOWN within.the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and l
  • i3. At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

~'

lWhere corrective mea'sures are-completed that permit operation under the ACTION O requirements, the -. ACTION may be taken in accordance with the specified. time

'2 11mits as measured from the time of failure to meet the Limiting Condition for Operation.. LExceptions to these requirements are stated in the individual

~

. Specifications.

+:

3.0.4 ' Entry -into .an = OPERATIONAL ' MODE or other specified ' applicability j]p.

condition shall not be made unless the conditions for the Limiting Condition

' forLOperation are met'without reliance on provisions contained in the ACTION

@N W statements unless otherwise excepted. -This- provision shall not prevent

-y ?passagei,through OPERATIONAL MODES : as required. to comply with ACTION 99 ,  : statements.

y 13.0.5 When a system, subsystem,: train, component.or device is determined to be inoperable solely ' because its emergency power ' source 'is inoperable, or

= solely. because . its' normal power source is inoperable, it may be ' considered OPERABLE for. the purpose of satisfying' the ' requirements of its applicable

~

4 ' Limiting Condition for Operation, provided: (1) its corresponding normal or

- Lemergency power ' source is OPERABLE; and (2) - all of its redundant system (s),

faubsystem(s), train (s). -component (s), and device (s)- are OPERABLE, or a

s J likewise' satisfy _ the requirements of this Specification. _Unless both ~

O , _

conditions :(1) and (2) are satisfied, the unit shall be placed in at least HOT fSTANDBY within'1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 41nat.least COLD SHUTDOWN within'the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This Specification

'is"not applicable in MODES 5 or 6.

dNORTH ANNA - UNIT 1- 3/4 0-1

~ . - -_ _ - _ - _ - _ _

-=

if q:)

3

c. ' .

x 3/4.0 APPLICABILITY'  !

. BASES ~

(The. specifications of this section provide the general requirements applicable to 'esch:of: the Limiting Conditions for Operation and Surveillance Requirements

. within Section 3/4..

J

" . 3.0.1 This specification ' defines the applicability of each specification in ,

termsR of idefined OPERATIONAL MODES or other specified conditions and is

.provided to delineate specifically when each specification is applicable.

' 3.0.21 This specification defines those conditions necessary to constitute compliance :with . the - terms of . an individual Limiting Condition for Operation n -; and associated' ACTION requirement.

23;0.3 _This' specification delineates the ACTION to be taken for circumstances

- _ not directly provided_for in the ACTION statements and whose occurrence would Eviolate the -intent of l the . specification. For example, Specification 3.5.1 calls for each: Reactor Coolant System accumulator to be OPERABLE and provides

,; explicit ACTION requirements when one accumulator is inoperable. Under the

_. terms of Specification 3.0.3. ,: if more than one accumulator is inoperable,

. , -within one hour measures must be initiated to place the unit in at least HOT

.STANDBYL within. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 'and in at least HOT SHUTDOWN within the following 6 i hours. As a . further example, Specification 3.6.2.1 requires two containment Quench'. Spray. Systems to be OPERABLE.and provides explicit ACTION requirements

~ -Lif_one spray ~ system-is inoperable.. Under the terms of Specification 3.0.3, if eboth ' of ;the- required Containment Quench Spray Systems are inoperable, within

.one hour measures must be initiated to place the unit in at least HOT STANDBY

~

within 61 hours7.060185e-4 days <br />0.0169 hours <br />1.008598e-4 weeks <br />2.32105e-5 months <br />, in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in lst:least COLD SHUTDOWN'in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

13.0.4 This specification provides that entry into an OPERATIONAL MODE _ or  :

'_ "lother ' specified . applicability . condition' must be made with (a) the full

complement: of required ' systems, equipment of components OPERABLE and (b) all

- other parameters asJapecified in the Limiting Conditions for Operation being met uwithout regard for allowable . deviations and out' of service provisions contained.in the ACTION statements,

}~ _

b The ;intenti _ of . this provision is to _ insure that facility operation is not

' initiated with either ~ _ required equipment or systems inoperable or other specified limits being exceeded.'

" - " Exceptions to - this_ provision have been provided for a limited number of specifications when startup with inoperable equipment would not affect plant These . exceptions are stated in the ACTION statements of the

- safety.

. > ' appropriate specifications.-

h:, -

.y -

. NORTH: ANNA - UNIT 1 B 3/4 0-1 e .

~

I - - , - - -

T' p ,

p' k

3 x

A ATTACHMENT 2 I

B.

?

3-I b

h; s

  • g I

h-i.

W.

h.

p i

r e

1

C:

-3/4 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING CONDITION FOR OPERATION 3.0.1 Compliance with the Limiting Conditions for Operation contained in the

~

succeeding Specifications is required during the OPERATIONAL MODES or other conditions specified therein; except that upon failure to meet the Liaiting Conditions for Operation, the associated ACTION requirements shall be met.

3.0.2 Noncompliance with a Specification shall exist when the requirements of the -Limiting condition for Operation and associated ACTION requirements are not met within the specified time intervals. If the Limiting Condition for Operation is restored prior _ to expiration of the specified time intervals, completion of the ACTION requirements is not required.

3.'0.3 When a Limiting Condition for Operation is not met, except as provided in ~the associated ACTION requirements, within ene hour ACTION shall be initiated ' to place the unit in a MODE in which the Specification does not apply by placing it, as applicable, in:

  • 1. At least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, l
2. At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and
3. At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. l Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured from the time of failure to meet the Limiting Condition for Operation. Exceptions to these requirements are stated in the individual Specifications.

3.0.4 Entry _into an OPERATIONAL MODE or other specified condition shall not be made unless the conditions of the Limiting Condition for Operation are met without reliance on provisions contained in the ACTION requirements. This provision shall not prevent passage through OPERATIONAL MODES as required to comply with ACTION requirements. Exceptions to these requirements are stated in.the individual Specifications.

3.0.5 -When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation, provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s),

subsystem (s), train (s), component (s), and device (s) are OPERABLE, or likewise satisfy the requirements of this Specification. Unless both

conditions (1) and (2) are satisfied, the unit shall be placed in at least HOT STANDBY within I hour, in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. This Specification is not applicable in MODES 5 or 6.

NORTH ANNA - UNIT 2 3/4 0-1

9 lns Q ;;,,

5 3/4.0 APPLICABILITY BASES J.. A ; ',

The. specifications of this section provide the general requirements applicable

to each of the Limiting Conditions for Operation and Surveillance Requirements within Section-3/4.

3.b.1~ This specification defines the applicability of each specification in terms. of defined OPERATIONAL MODES or other specified conditions and is provided to delineate specifically when each specification is applicable.

3.0.2 1 This . specification defines those conditions necessary to constitute compliance with the terms of an individual Limiting Condition for Operation and associated ACTION requirement.

c3.0.3 This specification delineates the ACTION to be taken for circumstances not directly provided for in the ACTION statements and whose occurrence would violate .the intent of the specification. For example, Specification 3.5.1

-requires each-Reactor Coolant System accumulator to be OPERABLE and provides explicit ACTION requirements if ^ one ' accumulator is inoperable. Under the terms. of . Specification 3.0.3. , if more than one accumulator is inoperable, within-one hour measures must be initiated to place the unit in at least HOT STANDBY within -6.-Sours and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example,' Specification 3.6.2.1' requires two Quench Spray Systems to be OPERABLE.and provides explicit ACTION requirements if one spray system is inoperable. Under the terms of Specification 3.0.3, if both of the

- roquired Quench Spray Systems are inoperable, within one hour uneasures must be initiated to place the unit in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at

'least HOT SHUTDOWN within the following 6' hours, and in at least COLD SHUTDOWN

'in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l 3.0.4- This specification provides that entry into an OPERATIONAL MODE or

'other specified applicability . condition must be made with (a) the full

. complement of. required. systems,. equipment or components OPERABLE and (b) all s jother parameters as specified in the Limiting Conditions for Operation being W met without - regard for allowable deviations and out of service provisions contained in the ACTION' statements.

4 The ; intent of this provision is to - insure that facility operation is not initiated with either required equipment or systems inoperable or other specified. limits being exceeded.

NORTH ANNA - UNIT 2 B 3/4 0-1 i._

} 6 .> .

4

  • I' ATTAC&fENT 3 h

b.

s i-

g h

I

{.

6.

Y y .

I r

?

y

, , .~ (

v. . .

DISCUSSION OF PROPOSED TECHNICAL SPECIFICATION CHANGES

h -

By_our letter dated December 15, 1983 (Serial No. 707), we proposed Technical

~

. Specification changes for North Anna Unit Nos. I and 2 to revise Technical Specification 3.0.3 and the Bases related to Technical Specification 3.0.3.

, The_ proposed changes were to provide consistency in relation to the time requirements of the Standardized Technical Specifications for Westinghouse Pressurized Wat'r reactors. In this submittal we proposed some hybrid changes such'that the lead-in to the action statement was different' than the standard; specificallylfrom a previously approved version of the North Anna 1 Technical

-Specifications. This was brought to the attention of Vepco by the NRC Project Manager for North Anna.

The ' proposed supplemental changes will revise . North Anna 1 and 2 Technical

-Specification 3.0.3 to partially state, "When a Limiting Condition for Operation . is not met, except - as provided in the associated ACTION requirements, within one hour ACTION shall be initiated to place the unit in a LMODE in which the Specification does not apply by placing it, as applicable,

.in:

1. . At least. HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
2. . At least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and-
3. At least COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."

^ In addition,' the Technical . Specification Bases have been revised to provide consistency with the changes to Technical Specification 3.0.3.

These supplemental. changes are to provide consistency in relation to._the time requirements of the Standardized Technical Specifications for Westinghouse LPressurized. Water Reactors, Revision 4, issued Fall, 1981.

The' proposed changes do not pose a significant hazards consideration as stated LinEthe Federal- Register. . dated April 6, 1983, Page 14870, Example (vii); a

. change to make a license conform to changes in the regulations, where the

" license change results in very minor changes to facility operations clearly in _

. keeping with the regulations. The regulation that is referred to for these

,c changes is NUREG-0452, Revision 4.

?