3F0192-14, Forwards Rev 2 to Cycle 8 Core Operating Limits Rept

From kanterella
(Redirected from ML20091L869)
Jump to navigation Jump to search
Forwards Rev 2 to Cycle 8 Core Operating Limits Rept
ML20091L869
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/23/1992
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091L870 List:
References
3F0192-14, 3F192-14, NUDOCS 9201280274
Download: ML20091L869 (1)


Text

- _ _ _ - _ _ _

k i

J$,(bses %

ljc 30 6 q%

'* o*

Florida

. Power lifil,5!n" January 23, 1992 3F0192-14 U.S. Nuclear Regulatory Commission '

Attention: Document Control Desk Washington, D.C. 20555

Subject:

Cycle 8 Core Operating Limits Report, Revision 2

Dear Sir:

Florida Power Corporation (FPC) hereby submits Revision 2 to the Crystal Rivtr Unit 3 (CR-3) Cycle P rore Operating Limits Report (COLR). This revision provides power-level dependent quadrant powcr tilt (QPT) limits for the remainder of Cycle 8 operation.- The COLk and suppleri, ants thereto are required to be submitted to the NRC upon issuance ~in accordance with CR-3 Technical Specification 6.9.1.7.

Sincerely,

~

i 9 4MN

, M. .eard, Jr.

Senior Vice President Nuclear Operations PMB:BPW.

Attacliment xc: Regional Administrator, Region II NRR' Project Manager Senior Resident inspector 2'T 013 J.

9201280274 920123 A 00l PDR ADOCK 05000302 A Florida Progress Company (1 P PDR gy