Forwards Proposed Program,Schedule & Level of Technical Effort Required for Accomplishing Tentative Work Assignment J & Evaluation of TMI-1,steam Generator Tube Sealing Program
ML20083L687
Person / Time
Site: Crane 
Issue date: 06/17/1982
From: Pandey S
FRANKLIN INSTITUTE
To: Bajwa S
NRC
Shared Package
ML20079G498 List:
References
CON-NRC-03-81-130, CON-NRC-3-81-130, FOIA-83-243, FOIA-83-A-18 NUDOCS 8206210343
Download: ML20083L687 (5)


Text

.

6)

~

dr7 x%

l~

fj

~

~ Franklin Research Center A DMm6on cd The Franklin Institute r

l y

June 17, 1982 l

l U.S. Nuclear Regulatory Casumission

~y

+

Wasnington, D.C.

20555 a

Attention Mr. 8. 3. Bajwa

,4 Project Officer (MS-545)

. @7

=

Neferences 1.

Lottar to Dr. 5. Pandsy (FRC) from Mr. 5. 5. Ba)wa

?f (Mac) dated June 14, 1982. Subjects NBC Contract No.'

j[

NBC-0 3-81-130, Tentative work Assignment "J"'

.O l

2.

MRC Contract No. MRC 03-61-130s FEC Project'C5506

/$

'.g l

Subject:

Proposed Program, Schedule, and Imvel of Technical Effort Asquired j

for Accomplishing Tentative work Aasiyament "J",

Evaluation of O

l

'nsI.1, steam Generator Tube Sealing Program

~{4 Dear Mr. Bajwas

-4;,,

,ft' We have reviewed Tentative Work Assignment "J" described in your letter of June 14,1942 (Reference 1), and conclude that we are capable of perfoaming

{

the work. As discussed below, we have reorganised the work statessent to unore i!

clearly define the scope of work.

q s

In accordance with asterence 1 and the terms of our contract (asterence

(

2), we are transmitting herewith our pr-:t-:::d schedule and level of effort of l

statt technical resources required to accomplish this assignment. This proposed schedule and estimated level of effort were prepared by our proposed co-Group Leaders, Dr. L. Lac =ard (215/448-1314) and Mr. T. Soc't (215/448-1160), after a preliminary review meeting on this subject with you 4...t Nm;'s Mr. C. McCracken and Mr. J. Rajan on June 11 and June 15, 1982.

Due to the complexity and tight scheduling on the assignment, we are giopostng Mr. T. Shook as an administrative co group leader to closely monitor the progress of the assignment. H is will allow Dr. L. Leonard, the technical

[

co group leader, to concentrate on the technical details of the assignment.

f I

e t -

un this assignment, it may be necessary to review and evaluate pioprtetary documents and processes. FRC agrees to follow tne procedures I

alteady in use on other FRC assignments involving review of proprietary I

t ut ornat ion.

I l

t 7J06Glo 3d #

kI XA Copy Has Been Sent to PDR

~

wh a nue ::ir,,,

ps.i.a.i-si

.._,siou. a -.

..L.

'=-

/OpwipstGW[ ^, 8;..,.; a, J ff

, T ; '..,

~. u

.,/e -..o. g s+

=

- z ;.,y

.,eg.

. ~

FMC's proposed schedule and technical resource allocation for the subject assigrunent are presented in the attached enclosure. We have divided the assignment into a three-task program. The cost estimate for engineering staf f-hours and a detailed work schedule are provided for all the tasks.

However, for Task C, it may lx necessary to provide a revised estimate if additional independent analysia is required.

Very truly yours, Ny M

c S. Pandey j

Project Manager BP/as q

Enclosure 4..

\\.

t

+

ee

'E '.

UG

..(

q l

l l

1

(

i.

[

~

l l

\\

l

. =

l

~

l l

y- > - - - - - -

r -

e.._4m g

y w_-,-,-_s

.e,-s,--,.---g,--,

m---

-w-

. g c.4 f+ f.' o a y g [

  • f' L'

.g j..,.,

. - - FRC Proposed Scope of ifork, Schedule, and Level of Technical

~

Effort for Accomplishing ifork Assignment "J" = " Evaluation of

~

'mI-l Steam Generator Tube Sealing Program' 1.

OluECTIVE t

To review and independently evaluate the procedures developed for onsite repair of TMI-l steam generator tubes by explosive expansion.

2.

SCOPE OF idORK A.

FRC Review and Evaluate Licensee's Repair Process Procedures for o adequacy and reasonableness based on past industrial experience and the qualification procedure employed o adequacy of the seal of primary and secondary sides within the tube a.

l sheet

~

i

(

o tube sheet ligament strength and dimensional stability during and

, g, after the expansion process

(

o offects of the expansion process on the design adequacy of the welded

  • - S connections in the supports, wrapper, tube bundle, and other affected p

components, T g,'

.i 2

~

o adequacy of procedures for removal of residues from the expansion

}-

process

? '/

offacts of expansion process on tube pretensioning.

o a.

5.

FW Develop an Independent Test Program to Simulate and Verify the

}

Licensee's Proposed Repair Process-x r

Repeat explosion process to determines

.o l

- tube sheet ligament strength and dimensional stability jN

- effectiveness and repeatability of the expansion process 4

4 leakagetestsonspecimenssuppliedbyLicenseeconsistingoftube(s)[

'[

l a

and tube sheet assembly r.4 l

~

~

l o 'neasurecent of residual stresses in tube sheet ligaments adjacent to '

tubes at 120*. intervals around each tube and at four stations through l

the tjuckness of the tube, sheet eierography'of polished /unetched and polished / etched specimens to o

i determine extent of interface bond and presence of inclusions or I

eracks, if any f

j i

1 l

5 s

l f

6 m.

~

__ f ranun d

..A < -.

~

[ h yli p M [ h5 N fd MND D'

o selected onsite verification of the explosive process, dimanalonel control, and cleaning procedures o temperature cycling and pressure transients simulation on ten tube

~

test apparatus.

Acsaeptions r

i i

All specimens to be furnished by Licensee as requested by FRC o

1 All the above te'sts will be performed on specimens formed by the o

Licensee and specimens formed at rnC.

.L C.

Analysis of Effects of Repair Pracess-on Design Adequacy of Steam Generator Evaluation of effect of process on welded connections in the supports, o

wrapper, tube bundle, and other affected oceponc.ats j

u Evaluation of the expected performance of the expande<. tubes under iI.

o notual operating conditions and under shermal transient loads th anticipat ed &tring normal operations and postulated IACA and steam

/ '?

line and feedline break accident conditions in accordance with the G

g Standard Review Plan 3.9 3.

(Based on existing steam generator design report)

%; y t.

w

,- y

.. g /

A: sumptions

'j;1

.S l

Tne above evaluations are b= sed on a review of the Licensee's analysis of

f..j b

the effects of the explosive expansion procese ce the steen generator q

during the process and for the remaining life of the plant (or specified

'i life, if applicable). If the Licensee's analyGis or steast generator

~

design report is four.d to be inadequate for the above purposes, more i

comprehensive independent analyses (at additional time and cost) may be' G

r gutreis.

3; m

and Testify at meetings with ACRs and Hearing Board

or

. La.

y.t:n LEVEL OF EFFORh

' _d im_

..stamated level of effort for the assignment is as follows:

T.i s k As FHC Review and Evaluate Licensee's Aspair Process Procedures w

ojo Staff-Hours

^

$ 44,520*

s

\\.

Nost estimate based on $70/staf f-hour (includes management and support costa).

j'<

k i b

y r

... $ m

DT.!~ XGt5ECMk!}4{$siW c

  • K 4}# $ W M M MMWR-M

""IML% b 4

e I

4 Task B:. FRC Develop.in Independent Test Program' to siminiate.and Verify the Licensee's Proposed Aspair Process 1734 Staff-Hours

$121,380*

1

'l i

Tas's C: Analysis of Effects of Aspair Process on Design Adequacy of steau Generator 528 staff-mours

$ 36,960*

Task Da Prepare for and' Testify at Meetings with ACRS and Hearing Board-3 240 staff-Hours

$ 16,800*

others consultant servicesIII

$ 10,000

[

Travel and Living Expenses 4 9,000 Materials

$ 10,000 conaputer Usage

$ 5,000 total

$253,660 ry

.n 4.

SCHECULE Task (Ref. Section 2)

Caspletico Date Tasks A and C, Preliminary TER July 15, 1982 i

-h Task 3, Preliminary Test Program June 29, 1982 l

Lab Test complets July 30, 1982

.g

(

complete Testing August 15, 1982 l

August 15, 442 o ra f t. TER l

s r.nal TEM September 15, 1982 l

VE: proposes ta use the services of a consultant who is an expert in the sepair/ construction of. heat exchangers using the explosive expansion r

l t..enntque.

l 8

3 s

=

=

.3 i

~

.m Y

I

_ _ _