Affidavit of G Epple Re Reed Contention 19 on Impediments to Use of Evacuation Routes.Resources & Planning Efforts Available to Overcome Impediments
ML20071J014
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/16/1983
From: Epple G
GASCONADE COUNTY, MO, UNION ELECTRIC CO.
To:
Shared Package
ML20071H409 List: ... further results
References
ISSUANCES-OL, NUDOCS 8305250573
Download: ML20071J014 (4)


Text

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ ___ _ _ - - ___--

g.9., V .

~

_$.. ll^ _

/ Q

, UNITED STATES OF, AMERICA

~

NUCLEAR REGULATORY COMMISSION C4

-i .,j',

2{

\ '. . g BEFORE THE ATOMIC SAFETY ANDbLICENSING BOARD Vg g #

In the Matter of )

)

' UNION ELECTRIC COMPANY ). Docket No. STN 50-483 OL

)-

(Callaway Plant, Unit 1) )

AFFIDAVIT OF GLENNON EPPLE

.ON REED CONTENTION 19 (IMPEDIMENTS TO THE'USE OF EVACUATION ROUTES)

~ County'of Gasconade )

) ss.

State of Missouri )

GLENNON EPPLE,.being duly sworn, deposes and says as follows:

1. I am-Associate Judge of the Administrative Court serving the Northern District of Gasconade. County in:the State

'of Missouri. .My business address is the Gasconade County Courthouse, Hermann, Missouri. .My District encompasses all of

the Callaway Plant emergency planning zoneL-("EPZ"),within
Gasconade County. As a-' member of the Gasconade County Court, I am responsible;for-county road and bridge maintenance throughout -the -C....;, , 1..., with . ,-colleagues-on~the Courc.

+ ./

i ,8305250573 830520 PDR ADOCK 05000483 PDR Nd.9 _.

_~ , ,

c a- -

m -

s

. E l

The County road supervisor reports directly to the Court. I am a: life-long resident of Gasconade County. I have personal knowledge of the matters stated herein and to the best of my knowledge believe them to be true and correct. I make this affidavit in response to Reed Contention 19 (Impediments to the Use of Evacuation Routes).

2. Reed Contention 19 asserts that the four county radiological emergency response plan and procedures fail to provide methods of identification of means of dealing with potential impediments to use of evacuation routes, and contin-gency measures for resolving such problems. The four county plan has been revised. Separate plans now exist for each of the four counties in the EPZ. In my view, the revised Gasconade County Emergency Response Plan adequately addresses these issues, given the potential for evacuation impediments in the County.
3. Within the Gasconade portion of the EPZ are roads which are the responsibility of the State of Missouri, the Morrison Special Road District, and the City of Morrison. The total area is approximately 2 square miles, with a population of about 200 persons. All of these roads have been taken into consideration in the following assessment of evacuation impediments.
4. Based on a review of these roads, I have concluded that there are no residences located within the EPZ which could potentially be isolated during the course of extensive

w

- a. . _ -

. A m

rainfall,'with subsequent localized flooding preventing normal

. evacuation. This conclusion takes into account where the roads could potentially be blocked in excess _of_four_ hours.

5. A second natural impediment which has been considered is that of an unusually heavy snowfall occurring coincidental with an emergency at the nuclear plant requiring evacuation.

In addressing this situation consideration nust be given to the fact that the 10 mile radius from the Plant passes through the town of Morrison. For clarity in defining the EPZ boundary, the entire city was included. One road leads from the town.

It needs to be cleared to assure proper evacuation. It is my opinion that using State resources, this can be accomplished in less than three hours. The citizens then would only have to travel a matter of up to a few blocks to reach the EPZ bound-ary, then continue on the State-maintained highway. Hence, I do not consider a heavy snowfall to be a serious impediment to evacuation.

6. Finally, man-made impediments to traffic flow will be noted by, or reported to, traffic control personnel who in turn will report such conditions to the Gasconade County EOC.

Additional monitoring for impediments will be provided by State Civil Air Patrol. Removal of such impediments will be accom-plished by State or County Highway personnel or through normal equipment resources available to the Sheriff.

7. In conclusion, it is my view that the significant evacuatkon impediments have been identifiede-and the resources er --*

r

t-

  • .9 and planning effort necessary to overcome such impediments are available.

/ ^' . . -

4 L 164 tt , 1) p_ C . _

Glennon Epple SubscrigJed and sworn to before me this % day of-May, 1983.

_ML CU3*

Notary Pub;.ic ()

My_ Commission expires O.n u cJt.n 8_ l977 .

) b LE3A UETZOW, Notary Public Gasconode County State of Missouri My commission expires January 3,1987

+