ML20067B887
| ML20067B887 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/22/1982 |
| From: | Fobes R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18047A680 | List: |
| References | |
| PAL-82-07-AD72, PAL-82-7-AD72, NUDOCS 8212060431 | |
| Download: ML20067B887 (1) | |
Text
,
File No P10.2.1 Incident No: PAL-8 7-AD72 NPDES NOTIFICATION Apparent Difference From Daily Average / Maximum Limita*. ion July 22, 1982 Plant: Palisados
- Permit No: MI 0001457 Outfall
Description:
Turbine Sump 011 Separator Outfall No:
800218 Wastes (00G)
Parameter: 011 and Grease - Frcon Parameter No: 00556 1.
Date of Incident: 7/12/82, 7/13/82, 7/14/82 2.
Identification of specific effluent limitation or monitoring requirement affected:
011 and grease are limited to 20 mg/l daily maximum concentration.
3.
Description of Incident:
A routinc sampic collected 7/12/82 indicated 21.7 mg/l oil and grease.
Sam-plcs co11ceted 7/13 and 7/14 measured 25.5 and 112.5 mg/1, respectively. The oil appeared to be turbine lube oil.
4.
Apparent Cause:
Apparent clogging of oil removal filters in the emulsion breaking system.
5.
If not immediately corrected, the anticipated time the condition is expected to continue:
NA 6.
Corrective Action - The following corrective action was taken or will be taken to reduce, eliminate and prevent recurrence:
The oil removal filters were changed on 7/16/82 after receiving notification of sample results on 7/15/82. Oil absorbent pillows were changed in the tur-bine sump and the turbine sump oil separator tank (T-41).
7.
Additional Comments:
NA 8.
Signed: Ronald L Fobes g [
8212060431 821124 PDR ADOCK 05000255 S
PDR m10782-0441a-71
--- -- -. - -