ML20067B132
| ML20067B132 | |
| Person / Time | |
|---|---|
| Site: | Shoreham, 07002884 File:Long Island Lighting Company icon.png |
| Issue date: | 12/13/1984 |
| From: | Ketzlach N NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML082420195 | List:
|
| References | |
| FOIA-90-162 NUDOCS 9102080143 | |
| Download: ML20067B132 (2) | |
Text
.
- Dis tribu tioni '
- [o n.
'o,,
UNITED STATES Docket 70-2884 E
NUCLEAR REGULATORY COMMISSION-NMSS R/F g
i
,a wAssiNoTow. o. c. rosss.
FCUP R/F-
\\ *e..* /
l12/13/84 Sbr e. Scm DOCKET NO.t 07002884 MEMORANDUM FOR WILLIAM 0.
MILLER,-CHIEF-LICENSE FEE MANAGEMENT-BRANCH-0FFICE OF ADMINISTRATION FROMt N.
KETZLACH URANIUM FUEL-LICENSING BRANCH DIVISION OF FUEL CYCLE St MATERIAL SAFETY OFFICE OF-NUCLEAR MATERIALS-I SAFETY AND SAFEGUARDS.
SUBJECTt-COSTS AND MANHOURS.FOR LICENSING' ACTION' 3
THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING'THE APPLI-CATION DATED 09/25/78-ARE TABULATED-BELOW FOR LICENSE NO.
1.
HAME LONG ISLAND LIGHTING CO.
175. EAST OLD COUNTY RD.
HICKSVILLE, NY. 11801 2.
A) CASEWORK CONTROL'NO. 07002884010S B) MAIL CONTROL NO. 10877-C) TAC NO.
3.
A) PERIOD C0vERED (STAFF HOURS)- 09/25/78 - 05/19/82'
!! $$fMEf1 d'LE!kSEISSUED N
4.
CONTRACT COSTS ASSOCIATEDLWITH THIS-APPLICATION:.$ PERIOD COVERED (CONTRACT COSTS)-
- 5. TAC WORK'BY10TnFR-0FFICES:-
0 HOURS 6.
HOURS DURING REPORIING PERIODI 73.5 <
7.
FEE CHARGABLE t $
2793<
l 8.
TOTAL COST TO-PROCESS APPLICATION 8 $
2793 C r
j APPROVED k.
' M C< /
'k h04 R.
PAGE U TZLACll-DRANCH CHIEF.
PROJECT MANAGER URANIUM FUEL LICENSING BRANCH 1g-9102000143 900921 PDR FOIA WILLIAM 90-162 PDR
RUN DATE REGUtATORY INFORMATI0H TRACKING SYSTEM PAGE 12/13/84 DETAIL LabrING OF HOURS' REPORTED ON CASEWORK-5 PERIOD COVEREDI 09/25/78 - 05/19/82-PROJECT MANAGER N
KETZLACH CASEWORK NUMBERt 07002884010S FACILITY NAMEt LONG ISLAND LIGHTING CO.
DATE CLOSED 05/19/82 l
NATURE OF ACTIVITYt RECEIVE, POSSESS & STORF SNM FUEL ASSEMBLIEG AT THE SHOREHAM HUCLEAR POWER STATION REGULAR REVIEWER WEEK ENDING HOURS-THE FOLLOWING WERE CALCULATED AT I 38 $ PER HOUR' N
KETZLACH 11/14/81 3.5 N
KETZLACH 11/21/81 0.5 N
KETZLACH 11/21/81 2.5 N
KETZLACH 12/12/81 1.0 N
KETZLACH 12/19/81 0.5 N
KETZLACH 01/02/82 4.5 N
KETZLACH 01/16/82 0.5 N
KETZLACH 02/13/82 1.0 N
KETZLACH 02/27/82 5.0-N KETZLACH 03/06/82 1.5 N
KETZLACH 03/06/82 1.0 N
KETZLACH 03/06/82 1.0 Al SOONG 03/13/82 4.0 N
KETZLACH 03/13/82 2.5 l
N KETZLACH 03/13/82 4.O N
KETZLACH 03/13/82
- 7. 5 -
N KETZLACH 03/20/82 1.0-H KETZLACH 03/27/82
- 1. 5 N
KETZLACH 04/03/82-10 N
KETZLACH 04/17/82 1.0
-N KETZLACH 05/08/82 1.0 N
KETZLACH 05/08/82 2.0 14 KETZLACH 05/08/82 9.0 N
KETZLACH 05/15/82 1.0 N
KETZLACH
'05/15/S2 2.0 N
KETZLACH 05/22/82 1.5 N
KETZLACH 05/22/82 1.0 1
N KETZLACH 05/22/82 1.0 N
KETZLACH 05/22/82 8.5 N-KETZLACH 05/22/82 1.5 73 5~
. _ _._