ML20067B132

From kanterella
Jump to navigation Jump to search
Tabulates Contract Costs Incurred & Manhours Used for Review of 780925 Application
ML20067B132
Person / Time
Site: Shoreham, 07002884  File:Long Island Lighting Company icon.png
Issue date: 12/13/1984
From: Ketzlach N
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML082420195 List: ... further results
References
FOIA-90-162 NUDOCS 9102080143
Download: ML20067B132 (2)


Text

.

- Dis tribu tioni '

- [o n.

'o,,

UNITED STATES Docket 70-2884 E

NUCLEAR REGULATORY COMMISSION-NMSS R/F g

i

,a wAssiNoTow. o. c. rosss.

FCUP R/F-

\\ *e..* /

l12/13/84 Sbr e. Scm DOCKET NO.t 07002884 MEMORANDUM FOR WILLIAM 0.

MILLER,-CHIEF-LICENSE FEE MANAGEMENT-BRANCH-0FFICE OF ADMINISTRATION FROMt N.

KETZLACH URANIUM FUEL-LICENSING BRANCH DIVISION OF FUEL CYCLE St MATERIAL SAFETY OFFICE OF-NUCLEAR MATERIALS-I SAFETY AND SAFEGUARDS.

SUBJECTt-COSTS AND MANHOURS.FOR LICENSING' ACTION' 3

THE CONTRACT COSTS INCURRED AND MANHOURS USED IN REVIEWING'THE APPLI-CATION DATED 09/25/78-ARE TABULATED-BELOW FOR LICENSE NO.

1.

HAME LONG ISLAND LIGHTING CO.

175. EAST OLD COUNTY RD.

HICKSVILLE, NY. 11801 2.

A) CASEWORK CONTROL'NO. 07002884010S B) MAIL CONTROL NO. 10877-C) TAC NO.

3.

A) PERIOD C0vERED (STAFF HOURS)- 09/25/78 - 05/19/82'

!! $$fMEf1 d'LE!kSEISSUED N

4.

CONTRACT COSTS ASSOCIATEDLWITH THIS-APPLICATION:.$ PERIOD COVERED (CONTRACT COSTS)-

5. TAC WORK'BY10TnFR-0FFICES:-

0 HOURS 6.

HOURS DURING REPORIING PERIODI 73.5 <

7.

FEE CHARGABLE t $

2793<

l 8.

TOTAL COST TO-PROCESS APPLICATION 8 $

2793 C r

j APPROVED k.

' M C< /

'k h04 R.

PAGE U TZLACll-DRANCH CHIEF.

PROJECT MANAGER URANIUM FUEL LICENSING BRANCH 1g-9102000143 900921 PDR FOIA WILLIAM 90-162 PDR

RUN DATE REGUtATORY INFORMATI0H TRACKING SYSTEM PAGE 12/13/84 DETAIL LabrING OF HOURS' REPORTED ON CASEWORK-5 PERIOD COVEREDI 09/25/78 - 05/19/82-PROJECT MANAGER N

KETZLACH CASEWORK NUMBERt 07002884010S FACILITY NAMEt LONG ISLAND LIGHTING CO.

DATE CLOSED 05/19/82 l

NATURE OF ACTIVITYt RECEIVE, POSSESS & STORF SNM FUEL ASSEMBLIEG AT THE SHOREHAM HUCLEAR POWER STATION REGULAR REVIEWER WEEK ENDING HOURS-THE FOLLOWING WERE CALCULATED AT I 38 $ PER HOUR' N

KETZLACH 11/14/81 3.5 N

KETZLACH 11/21/81 0.5 N

KETZLACH 11/21/81 2.5 N

KETZLACH 12/12/81 1.0 N

KETZLACH 12/19/81 0.5 N

KETZLACH 01/02/82 4.5 N

KETZLACH 01/16/82 0.5 N

KETZLACH 02/13/82 1.0 N

KETZLACH 02/27/82 5.0-N KETZLACH 03/06/82 1.5 N

KETZLACH 03/06/82 1.0 N

KETZLACH 03/06/82 1.0 Al SOONG 03/13/82 4.0 N

KETZLACH 03/13/82 2.5 l

N KETZLACH 03/13/82 4.O N

KETZLACH 03/13/82

7. 5 -

N KETZLACH 03/20/82 1.0-H KETZLACH 03/27/82

- 1. 5 N

KETZLACH 04/03/82-10 N

KETZLACH 04/17/82 1.0

-N KETZLACH 05/08/82 1.0 N

KETZLACH 05/08/82 2.0 14 KETZLACH 05/08/82 9.0 N

KETZLACH 05/15/82 1.0 N

KETZLACH

'05/15/S2 2.0 N

KETZLACH 05/22/82 1.5 N

KETZLACH 05/22/82 1.0 1

N KETZLACH 05/22/82 1.0 N

KETZLACH 05/22/82 8.5 N-KETZLACH 05/22/82 1.5 73 5~

. _ _._