|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141A5021997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Oyster Creek Nuclear Generating Station ML20141H7441997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Oyster Creek Nuclear Generating Station ML20137X8231997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Oyster Creek Nuclear Generating Station ML20137C3771997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Ocnpp ML20134P6151997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Oyster Creek Nuclear Generating Station ML20133M1751996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Oyster Creek Nuclear Generating Station ML20132D1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Oyster Creek Nuclear Generating Station ML20134M9761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Oyster Creek Nuclear Generating Station ML20129B1631996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Oyster Creek Nuclear Generating Station ML20117M7561996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Oyster Creek Nuclear Generating Station ML20116M6761996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Oyster Creek Nuclear Generating Station ML20115F8561996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Oyster Creek Nuclear Generating Station ML20112J7431996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Oyster Creek Nuclear Generating Station ML20112A6891996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Oyster Creek Nuclear Generating Station ML20101R0401996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Oyster Creek Station ML20101D7701996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ocnpp ML20100G5101996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Oyster Creek Nuclear Generating Station ML20096E8071995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Oyster Creek Nuclear Generating Station ML20099L7571995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Oyster Creek Nuclear Generating Station ML20094P8431995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Oyster Creek Nuclear Generating Station ML20093H3571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Oyster Creek Nuclear Generating Station ML20092H7741995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Oyster Creek Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
_ _ -
MONTHLY OPERATING REPORT - DECEMBER 1990 At the beginning of December, oyster Creek was operating at full power. Power was reduced for about 11 days due to control problems with a drain valve from a feedwater heater. In addition, brief power reductions were required in accordance with technical specifications due to equipment problems with the core spray and standby gas treatment systems. At the end of December, Oyster Creek was operating at full power.
9101230275 910115 PDR ADOCK 05000219 R PDR
[
l i
e 1 MONTHLY OPERATING REPORT DECEMBER 1990 The following Licensee Event Reports were submitted during the month of December, 1990:
None
i
" e Oyster Crc 3k Station #1
- Docket No. 219 : 1 i )
1 !
REFUELING INFORMATION - DECEMBER, 1990 -i Name of. Facility: Oyster Creek Station.#1-Scheduled date for next refueling shutdowns February 15,~1991 Scheduled date_for restart.following refuelings. Hay 31,--1991 Will refueling or resumption of - operation thereaf ter require a _ Technical Specification change or other-license amendment?
l Yes j l
Technical Specification = Change Request .180 was- submitted to - the ' NRC 1 on - -j 5-07-90. This submittal was made in accordance with GL:88-16 to incorporate. ]
cycle specific parameters in a core operating limits _ report.-
Important licensing considerationu associated with refue' '.ng, e.g., new or-difforent fuel design;or supplier, unreviewed design'or performance analysis. j methods, significant changes in fuel design, new, operating procedures ;
- 1. General Electric Fuel . Assemblies: -
fuel design':and performance analysis methode have been approved by the NRC. 1
- 2. Exxon Fuel Assemblies-- no major changes have been:made nor"are there any anticipated..
i
(. The number _of-fuel assemblies (a) in the core --- 560
-(b) in the spent fuel-stcrage pool. =- 1612
-(c) in dry storage = 140 The present licensed spent fuel pool - storage capacity - and ' the eize : of,'any .
l: increase in licensed storage capacity.that has been requested or is planned,_in number of fuel assemblies:
Present licensed-capacity: .2600-
.The projected date,of the,last refueling that can be discharged to the ispent-fuel pool assuming the present' licensed capacity:-
The rcracking of the fuel pool is now complete. All ten'(10). racks are:
now installedi Discharge capacity to the = spent fuel pool - willi be
-available until 1994 refueling outage.;
1619B/45-
.',' .. )
,. OPERATING DATA REPORT
- 1. DOCKr.T: 50-219
- 2. REPORTING PERIOD: 12/90 t
- 3. UTILITY CONTACT: HARI S. SHARMA 609-971-4638
- 4. LICENSED THERMAL POWER (MWt): 1930
- 5. NAMEPLATE RATING (GROSS MWe): 687.5 X 0.8 = 550
- 6. DESIGN ELECTRICAL RATING (NET MWe): 650
- 7. KAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 642
- 8. MAXIMUM DEPENDADLE CAPACITY (NET MWe): 620
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS - NONE
- 10. POWER LEVEL TO WHICH-RESTRICTED, IF ANY (NET MWe): None
- 11. REASON FOR RESTRICTION, IF ANY: None MONTH XEbH CUMULATIVE
~ REPORT PERIOD HRS 744.0 8760.0- 184296.0
- 13. HOURS RX CRITICAL 744.0 7804.6 119065.2
- 14. RX RESERVE SHTDWN HRS 0.0 0.0 918.2
- 15. HRS GENERATOR ON-LINE 744,0 7681.2 115913.0
- 16. UT RESERVE SHTDWN HRS 0.0 0.0 1208.6
- 17. GROSS THERM ENER (MWH) 1364126 13622896 194894956
- 18. GROSS ELEC ENER (MWH) 458203 4483183 65605923
- 19. NET ELEC ENER (MWH) 441000 4305054 62960032 20 UT SERVICE FACTOR 100.0 87.7 62.9
- 21. UT AVAIL FACTOR 100.0 87.7 63.6
- 22. UT CAP FACTOR (MDC NET) 95.6 79.3 55.1
- 23. UT CAP FACTOR (DER NET) 91.2 75.6 52.6
- 24. UT FORCED OUTAGE RATE 0.0 10.1 11.6
- 25. FORCED OUTAGE HRS 0.0 859.9 15270.0
- 26. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):
Cycle 13 Refueling Outage scheduled to begin on Feb. 15, 1991, scheduled to end May 31, 1991.
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A 16190/47
.. . - - ~ . . . . . - , . - . . .. . . . . ~ ~ . . . . . - ~.~ -.-.- - - ~ . . - - . .. .. -
, . t
.. =+-
AVERAGE DAILY POWER LEVRE,~
NET MWe'-
i DOCKET #. .-. . . . .-.-.50219 ~
UNIT. . . . . . .. . . - - ' . OYSTER CREEK #1-REPORT-DATE . . - . - . . .-. JANUARY-1, 1991- !
COMPILED BY . . ... ...HARI S. SHARMA TELEPHONE # . .:. . . . .609-971-4638
~ MONTH DECEMBER, 1990 e
DAX lili - DAI IGf
- 1. 612 16. ' 550:-
- 2. 631 17. - 550
- 3. 631 '18. 540
- 4. 629 19. 564-:
- 5. 630, 20. 491-
- 6. 631 21. '3 4 6 -.
- 7. 631 '22.
579
- 8. 631 2 3. :- 571.
- 9. 630 24. 566 ,
~
- 10. 631 25. 626-
.i 11.- -630. - 2 6. - 623
~
1
- 12. 629 -27. . 627:
13 . -- 620 2 8 . .: 626
- 14. 567- 29. 627 C
'15. 564 30-.- 623'
- 31. 569 >
L!,
' 1619B/46 n
- a. -- , . . - - ,, , . - . . , , - , , , . .. .l-, . , . , , . , . L , , .. .,; . . , _ , , , - . ~ . , , . , ,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET'NO. 50-219 UNIT NAME Ovster Creek DATE January, 1991 COMPLETED BY R. Baran TELEPHONE 971-4640 REPORT MONTH December, 1990 TYPE METHOD OF SHUTTING F: Forced DURATION DOWN THE REACTOR OR NO. DATE ,S: Scheduled (Hours) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS / COMMENTS 103 901220 F 0 A 4 A plant shutdown was commenced due to both Standby Gas Treatment Systems being declared inoperable following the discovery of two cracks in-the system common suction line.
The shutdown was terminated at 0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> on December 21, 1990, following the ccmpletion of repairs and post maintenance testing. The shutdown was terminated at a plant load of 250 MWe.
Sn - ry :
(1) PEASON (2) METHOD
- a. Equipment Failure (Explain) e. Operator Training & License Exam 1. Manual
- b. Maintenance or Test f. Administrative 2. Manual Scram
- c. Refueling g. Operational Error (Explain) 3. Automatic Scram
- d. Regulatory Restriction h. Other (Explain) 4. Other (Explain) 4
.-n . < . ~ .
. - . . . . . - . -_,n ~_ . . - -
i UNIT SHUTDOWNS AND POWER REDUCTIONS 1
DOCKET NO. '50-219 l ' UNIT NAME Oveter Creek
'DATE. January,-1991 ,
. COMPLETED BY R. Baran TELEPHONE 971-4640 REPORT MONTH December, 1990 TYPE' METHOD OF SHUTTING:
F Forced DURATION DOWN THE REACTOR OR NO. DATE S: Scheduled. (Hours) REASON.(1), REDUCING POWER (2). LCORRECTIVE ACTIONS / COMMENTS 103 901220 F O 'A 4 A plant. shutdown was commenced.
due to Loth Standby Gas Treatment Systems being declared inoperable-following the discovery of two cracks-
~
in the system common suction line.
The. shutdown.was terminated at 0240 5
hours on December 21, 1990, following the completion of. repairs and post:.
maintenance testing. 'The shutdown was terminated at-a. plant' load of 250 MWe.
i.
i 1
1 Summary 2
- (1) REASON (2) METHOD l
d
- a. Equipment Failure (Explain) e. Operator Training & License Exam 1. Manual
- b. Maintenance or Test f. Administrative 2. Manual ~ Scram 2 -. c. Refueling g. Operational Error-(Explain) 3. Automatic Scram i
- d. Regulatory Restriction h. Other (Explain) 4. . Other. - ( Explain)
_ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _