ML20066F388

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Nov 1990 for Oyster Creek
ML20066F388
Person / Time
Site: Oyster Creek
Issue date: 11/30/1990
From: Baran R
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20066F356 List:
References
NUDOCS 9101230290
Download: ML20066F388 (1)


Text

.

UNIT SHUTDOuTNS AND POWER REDUCTIONS

. DOCKET NO.

50-219 UNIT NAME Oyster Creek DATE December, 1990 COMPLETED BY R.

Baran TELEPHONE 971-4640 a

REPORT MONTH Noveeber, 1990 TYPE METHOD OF SHUTTING F: Forced DURATION DOWN THE REACTOR OR NO.

DATE S: Scheduled (Hours)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS / COMMENTS 101 901103' F

O A

4 Redu*;w plant 1 cad to 380 are:e 5

to tw: rave "A" Feedwater String from 7

service due to pin hole leak on "A" Feedwater Minimum Flcw hive.

102 901113 S

O A

4 Reduced plant loau to 27,5 MWe duet to ALARA concerns during the NDE inspection of feedwater minimum flow lines in the condenser bay.

i a

i j

j j

l S#5 L904LJ

-O Q.

.-o o 00 s k*s SO 1

02 O~ O 04 0 OO M

. (4 1

Sn= nary :

OM (1) REASON (2) METHOD 4GE a.

Equipment Failure (Explain) e.

Operator Training & License Exam 1.

Manual

{

b.

Maintenance or Test f.

Administrative 2.

Manual Scram c.

Refueling g.

Operational Error (Explain) 3.

Autocatis Scram d.

Regulatory Restriction h.

Other (Explain) 4.

Other (Explain) e

.