ML20066F368
| ML20066F368 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 03/31/1990 |
| From: | Baran R GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20066F356 | List: |
| References | |
| NUDOCS 9101230280 | |
| Download: ML20066F368 (1) | |
Text
_ - - -.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO..
50-219 UNIT NAME Ovster Creek DATE:
April, 1990 COMPLETED'BY R.
Baran-TELEPHONE' 971-4640
. REPORT MONTH March,'1990' TYPE METHOD OF SHUTTING F:: Forced DURATION DOWN THE REACTOR OR' NO.
DATE. S:. Scheduled (Hours)-
REASON (1).
. REDUCING POWER :-(2).
CORRECTIVE ACTIONS / COMMENTS 94 900309 F.
~O A-4-
Load' reduction to S7% Rx power (315 MWe) due to vacuum problems.
?
95 900326 S
.'120.4 B
.1' 12-U-J Maintenance Outage r
th-Z 1004Q
-O(L wo '
OO wLO orO OM (D O c40 OQ e)<I 04
' O,h
" Summary.:
40 E
-(1) REASON (2)' METHOD a.
Equipment Failure (Explain)-
e.
Operator. Training & License Exam 1.
Manual
- b.
Maintenance or Test f.
Administratise 2.
.' c.. Refueling g.
Operational Error (Explain) 3.
Regulatory Restriction h.
Other (Explain) 4.-
Other (Explain)
_i__. "