ML20066F377
| ML20066F377 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 06/30/1990 |
| From: | Baran R GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20066F356 | List: |
| References | |
| NUDOCS 9101230284 | |
| Download: ML20066F377 (1) | |
Text
_ _ - _ _ _.
UNIT SHUTDOWNS AND POWER REDUCTEOWS
)
DOCKET No.
50-219 j
U.IT NAME Oyster Creek l
N S-DATE Ju1y, 1990 l
COMPLETED BY R.
Saran l
TELEPHONE 971-4640 l
REPORT MONTH June, 1990 TYPE METHOD 9F SHOTTING F: Forced D'JRATION DOWN THE REACTOR OR NO.
DATE S.- Scheduled (Hours)
REASON (1)
REDUCING POWEit (2)
CORRECTIVE ACTIONS /COMIGNTS
)
2 I
98 900625 F
l137.7 A
[
3 Automatic full scram due to raain
)
j condenser low vacuum. Low vacuum l caused i>y a loss of circulation water j
I j.when backwash vr.lve V-3-18 failed to
'open during condenser backwashing.
&.g tOO4Q
- O Q.
-O CO etD OO 4 '4 (D o cao OQ M
04 Summary :
Fo (1) REASON (2) METHOQ
- M a.
Equipment Failure (Explain) e.
Operator Training & License Exam 1.
Manual b.
Maintenance or Test f.
Administrative 2.
Manual Scram c.
Refueling g.
Operational Error (Explain) 3.
Regulatory Restriction h.
Other (Explain) 4.
Other (Explain) m
. _