ML20066F363

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1990 for Oyster Creek
ML20066F363
Person / Time
Site: Oyster Creek
Issue date: 01/31/1990
From: Baran R
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20066F356 List:
References
NUDOCS 9101230277
Download: ML20066F363 (1)


Text

--

._,7

-Attachment 1 UNIT SHUTDOWNS AND POWER P2 DUCTIONS'.

DOCKET NO.-

'50-219' UNIT.NAME,

'Ovster Creek DATE

-February, 1990-

' COMPLETED BY.

R. Baran TELEPHONE 971-4640' REPORT MONTH January. 1990-

-TYPE

' METHOD'OF SHUTTING-F: Forced'.

" DURATION DOWN THE P2 ACTOR OR NO.

DATE S: Scheduled..

- (Hours)

REASONL(1)

. REDUCING' POWER (2)

' CORRECTIVE ACTIONS / COMMENTS 91' 90012'3 F

0 A-4 A load reduction to 412 MWe was requir-ed to remove the "C":Feedwater string from service to. facilitate, repairs I'

to a leak'on a drain nipple on "C"'

Rx Feedwater. Pump. Average load during the repair time period was 443 MWe..

'l

.wm LONQ j

M O G.

I wo j

OO

.1

" b's

.1 Os0 NM NO NO OQ GG N

Summary :

(2) METHOD OC (1)' REASON.

Equipment Failure (Explain) e.

Operator' Training.& License Exam 1; Manual; Ng.

a.

b.

Maintenance or Test f.

Administrative 2.

Manual Scram c.

Refueling g.

Operational Error:(Explain)-

3.

Automatic Scram d.-

Regulatory Restriction h.

Other (Explain) 4.

Other (Explain)

_.: