ML20066F363
| ML20066F363 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 01/31/1990 |
| From: | Baran R GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML20066F356 | List: |
| References | |
| NUDOCS 9101230277 | |
| Download: ML20066F363 (1) | |
Text
--
._,7
-Attachment 1 UNIT SHUTDOWNS AND POWER P2 DUCTIONS'.
DOCKET NO.-
'50-219' UNIT.NAME,
'Ovster Creek DATE
-February, 1990-
' COMPLETED BY.
R. Baran TELEPHONE 971-4640' REPORT MONTH January. 1990-
-TYPE
' METHOD'OF SHUTTING-F: Forced'.
" DURATION DOWN THE P2 ACTOR OR NO.
DATE S: Scheduled..
- - (Hours)
REASONL(1)
. REDUCING' POWER (2)
' CORRECTIVE ACTIONS / COMMENTS 91' 90012'3 F
0 A-4 A load reduction to 412 MWe was requir-ed to remove the "C":Feedwater string from service to. facilitate, repairs I'
to a leak'on a drain nipple on "C"'
Rx Feedwater. Pump. Average load during the repair time period was 443 MWe..
'l
.wm LONQ j
M O G.
I wo j
OO
- .1
" b's
.1 Os0 NM NO NO OQ GG N
Summary :
(2) METHOD OC (1)' REASON.
Equipment Failure (Explain) e.
Operator' Training.& License Exam 1; Manual; Ng.
a.
b.
Maintenance or Test f.
Administrative 2.
Manual Scram c.
Refueling g.
Operational Error:(Explain)-
3.
Automatic Scram d.-
Regulatory Restriction h.
Other (Explain) 4.
Other (Explain)
_.: