ML20066F374

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for May 1990 for Oyster Creek
ML20066F374
Person / Time
Site: Oyster Creek
Issue date: 05/31/1990
From: Baran R
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20066F356 List:
References
NUDOCS 9101230283
Download: ML20066F374 (1)


Text

---

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-219 ~

UNIT NAME Ovster Creek DATE June,-1990 COMPLETED BY- R.Baran TELEPHONE 971-4640-REPORT MONTH 'May, 1990 TYPE .

METHOD OF SHUTTING.

F: Forced DURATION DOWN THE REACTOR OR NO. DATE S: Scheduled (Hours). REASON"(1) REDUCIEG POWER (2)' . CORRECTIVE ACTIONS / COMMENTS l'

l 96: 900421 .F- .342.8 A 2 Loss of Unit substation 1B2.

(Outage 12-U-K).- Commenced..a normal I shutdown until the' generator was removed from service. A manual scram was then inserted to expedite the shutdown.

97- 900527 F- O- A 4 Load reduction due to a tube leak in "C",. south main condenser. Leaking tubes in the condenser half were successfully plugged.

I' Os sZ inc4A "O

09 As  :

Oso l MM (00 c40 OQ M<I C4 Summary :

(2) METHOD' -c

. (1) REASON-

1. ' Manual ME
a. Equipment Failure'(Explain) e. Operator Training & License Exam-
b. Maintenance or Test f. Administrative 2. Manual Scram
c. Refueling g. Operational Error (Explain) 3. Automatic Scram

. d. . Regulatory Restriction h. Other (Explain) 4. Other (Explain)

Y