UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-219 ~
UNIT NAME Ovster Creek DATE June,-1990 COMPLETED BY-R.Baran TELEPHONE 971-4640-REPORT MONTH
'May, 1990 METHOD OF SHUTTING.
TYPE F: Forced DURATION DOWN THE REACTOR OR NO.
DATE S: Scheduled (Hours).
REASON"(1)
REDUCIEG POWER (2)'
. CORRECTIVE ACTIONS / COMMENTS l'
l 96:
900421
.F-
.342.8 A
2 Loss of Unit substation 1B2.
(Outage 12-U-K).-
Commenced..a normal I
shutdown until the' generator was removed from service. A manual scram was then inserted to expedite the shutdown.
97-900527 F-O-
A 4
Load reduction due to a tube leak in "C",. south main condenser. Leaking tubes in the condenser half were successfully plugged.
I' OssZ inc4A "O 09 As Oso l
MM (00 c40 OQ M<I C4 Summary :
(2) METHOD'
-c
. (1) REASON-ME Operator Training & License Exam-1.
' Manual Equipment Failure'(Explain) e.
a.
b.
Maintenance or Test f.
Administrative 2.
Manual Scram c.
Refueling g.
Operational Error (Explain) 3.
. d.
. Regulatory Restriction h.