ML20066C794

From kanterella
Jump to navigation Jump to search
FOIA Request for Records Re Facility
ML20066C794
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/02/1990
From: Burhans J
BURHANS, J.T.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-90-323 NUDOCS 9101110220
Download: ML20066C794 (2)


Text

.

- - ~.

/

E' y

JOHN T BURHANS ATTORNEY AT LAW 505 PLE AS ANT ST8tEET. SUITE 204 ST JOSEPH, MICHIGAN 49085 (6l61982 8505 July 2, 1990 PREEDOM OF INFORMATION ACT REQUEST fREDOM 0F INFORMAil0N Director ACT REQUEST office of Administration f er U.S.

Nuclear Regulatory Commission

/b-

'fC"ddJ A

Washington,.D.C.

20210

/

i TO WHOM IT MAY CONCERN:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

522, as amended the BURHANS LAW OFFICE requests copies of any and all agency records and information, including but not limited-to-notes, letters, memoranda, drafts, minutes, diaries, logs,_ calendars, tapes, transcripts, summaries, interview reports, procedures, instructions, allegation summary sheets, interim and/or final reports, status reports, and any and all other records relevant to and/or generated in connection with the following documents relating to the Palisades Nuclear Plant in Covert, Michigan (Region 3):

1)

April 11, 1990-letter from. Consumers Power Company.

to the Nuclear Regulatory Commission concerningla technical specification change.

It is. entitled

" Safety Injection Tank Request-Boron-Concentra-tion."

2)

Engineering Analysis EA-GCP-90-01, Rev 0 3)

SIT Boron Concentration traces for all four SIT Tanks for cycles 6,7, and 8.

4)

Any other documents as above described'that-relate to the Safety Injection Tanks from 1981'to date.

5)

" Core Damage Assessment Procedure Based Upon Post Accident Chemistry And Radiation Sample Analysis"-

by R.W. Bradshaw, R.D._Ivany, Combustion Engineering,

~

presented at ANS= Winter Meeting, 1983.

6)

" Development of the Comprehensive Procedure' Guideline for Core Damage Assessment, Task 467" prepared ^by Combustion Engineering on behalf of CE Owners Group.

7)

Safety Injection-Tank Operating Limits AR-NL-85-62 dated 9-86.

8)

Palisades Cycle 8 Startup and' Operations Report AN F-88 -161 ( P), dated 10-88.

9101110220 900702

$0hHA 90-323 PDR T

5 r

'l U.S. Nuclear Regulatory Commission July'3, 1990 I

Page Two 9)

Palisados FSAR Chapter 14.17.

10)

ORNL-3230 Report on " Effects Of Heat Flux On Corrosion i

Of Aluminium By Water" by J.C. Griess, H.C. Savage, J.G.

Rainwater, J. L.

English.

11)

Palisades FSAR Chapter 14.22, Rev 3.

12)

ANF Report XN-NF-81-68 for Palisades Startup and Operation.

13)

Palisades Technical Specifications.

14)

Letter by G.W _ Ford Dated July 26, 1988, " Potential For Loss of Pc at-LOCA Recirculation Capability _ Due to Insulation Debris Blocking" - IN-88-28.

This reque t includes all agency records as defined in.10 C.P.R.

s 9.3a (b) and the NRC Manual, Appendix 0211, Parts 1.A.2 in the NRC

" official, working", investigative or other files, or at any other location, including private residences, i

If any records, as defined in 10 C.F.R 9.3a (b), and the NRC Manual, supra., and covered by this request have-been destroyed, returned to the provider, provided to the licensee and/or removed after this request, please provide all surrounding records, including but -not limited to a list of all records which have been or are destroyed.and/or removed, a description of the action (s) taken relevant to, generated in connection with,_and/or. issued in order to implement the action (s).

For any documents or. portions that you deny due to.a specific FOIA exemption, please provide an index itemizing and-describing the documents or portions of documents withheld. -The index should provide a detailed justification of your grounds for claiming-each exemption, explaining why each exemption is relevant to the document or portion of the document withheld.

This index is_ required under Vauchn v Rosen (I), 484 F2d 820 (D.C. Cir. 1973), cert, denied,-415 U.S. 977 (1974).

We anticipate a= complete or partial response to this request ~

within ten working-days, as required by the FOIA.

Since oly,

'~~

/

6ohn T.

Burhans

_ - _