ML20064J467

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1982
ML20064J467
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/07/1982
From: Mcbride L
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20064J455 List:
References
NUDOCS 8301180084
Download: ML20064J467 (5)


Text

i J .

TSP- 3 Acaachmant-38

  • IaJun 2 Page 1 of L O?!PATUG DA A RE?CRT 00C:"I? 240. 50-267 3An December 7, 1982 cc:r_:n3 3Y L. hi: McBride

= trucNr a n o 79c;_???d ,

OPERATI"G STA M i iOTT.S f

, 1. Uni: Name: Fnr* 9t- 'frain

2. Reporting Period: A71101 thenugh A71110
3. Licensed Thernal Power (Wt): Ad7 4 Nameplate Racin6 (Croes We): 1d7
3. Design nec:ri:a1 Racing (Net tue): '41 0
6. I Mazin.m Ospendaale Capacity (cross .*ie): 7A?
  • l
7. 72x =um :ependahie Capaci:v (Nec :;e): 330  ! l
3. Of Changes Cccur in CapacP:7 Ratings (!: ems Nuncer 3 Througn 7) Since *.as: Raport, cive Raasons:

None

7.  ?:wer
  • evel To ~4hich Restricted, If Any (Not :*i e): 231
10. Reasons for Rescriccions. If Any: Restr(etion to 70% pending resolution of contractual matters.

This 21onth Year es Caca C,;nulative

u. sours in Re,or:ing rerio4 720 8016 29977 j ... xuemer se sours Reaccar m Cri:1 cal 538.8 4745.0 19323.4 j 13. Reactor Reser re Shutdown Hours 0 0 0 1
u. sours ceneraese en-une 0 3266.2 13174.5
u. cai: Reser.re Shutdown :<ours 0 0 0
6. cras. Th.
; rnergy cesera:ed oux) 6541.9 1849177.5 6783122.3
17. crass nect-temt tuergy ceneraced (:ss) 0 635548 2326904
u. Nec necerical energy ceneraced csu) -5330 573085 2127344

! 19. Unit Service Factor 0 40.7 43.9

a. eni: Avanabut:7 rae:ar 0 40.7 43.9
  • 1. Onic Capaci:7 Tactor (esing :CC Nec) 0 21,7 21,5
n. unie capac::y rac:=r (: sing et2 :et) 0 21.7 21.5 IJ. "ni Forced oi. cage Rate 1nn_O 16,3 3d,6
24. Shutdowns 3cheduled Over Nex: 6 5:ts (Type. Data, and Ouration of Iaca): Plant recovei / e21201 through 830115-1104.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />. Surveillance testing 830823 through 830422-744.0 hrs..
5. : shac :c.n ic :nd or aepor: 7.ried. r,:inated : ace er s:2r:u,: Reactor is critical at low power.
25. Units in Tes: 3:a:aa (?rier :J Oen=e r:ial Opera n en) : Tcreess: Achieved
nnx. CR: na:.:n N/A N/A
nnA:. ::.:: 2:n= N/A N/A 8301100084 821207 :PI2An:2 1/A N/A PDR ADOCK 05000267 R pop

ASP-3

- Att ach;wnt-3A AVERAGE DAILY CNIT POWER LEVEL Issue 2 Page 1 of 1 Docket No. 50-267 Unit Fort St. Vrain Date noenmher 7. lor 2 Completed By L. M. McBride Telephone (303) 785-2224 Month November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.. -

(NMa-Net) (Mge-Nee) 1 0.0 17 0.0 2 0.0 13 0.0 3 n_n 19 0.0 4 nn 20 0.0 3 nn 21 n.n 6 n_n 22 nn 7 0.0 23 0.0 8 0.0 24 0.0 9 0.0 23 0.0 10 0.0 26 0.0 11 0.0 27 0.0 12 0.0 23 0.0 13 n_n 29 0.0 12 0.0 30 0.0 13 0.0 31 N/A 16 0.0

  • Generator on line but no net generation.

TSI'- 1 A t t eas tems'es t -[C

  • Imaise 2 t

I'dr.e 3 ** I I UNIT SiltlilmWNS AND 11Mut kl3st1C114tS t, NIT ,unE fort St. Vrain nAtE December 7, 1982 corrmin .T L. M. McBride amiuT emmni November 1982 num>NE (303)785-2224 HEntoD 0F SillfTTING

~ ~ ~ ~ ~ ~~ l lxWN SYSTP}l 0440't BNENT I th ) . DATE IT PE latlRATioN MEASON REACTOR I.EH I O t!)E EUl>E CAllSE AND tDRKECTIVE ACTION To l'Rt.VEN r net:llRNENt:E B2-014821101 F 720.0 H 3 N/A IDH INSTRU Loop 1 Shutdown followed by reactor scram and turbine-generator trip on 820930. Outage continued due to primary coolant chemistry impurities.

1 i

G t

L 9

4 0

. - - _~ . - _- .

4 REFUELING INFORMATION

l. Name of Facility. Fort St. Vrain Unit No. 1 4
2. Scheduled date for next refueling '

shutdown. September 1, 1983

3. Scheduled date for restart following refueling. November 1, 1983 1
4. '

Will refueling or resumption of operation thereafter require a ,

technical specification change or other license amendment? Yes If answer is yes, what, in general, vill these be? Use of type H-451 graphite.

If answer is no, has the reload l

fuel design and core configura-tion been reviewed by your Plant i i Safety Review Consittee to deter- l

? mine whether any unreviewed I

l safety questions are associated i with the core reload (Reference '

l 10CFR Section 50.59)? l i

l If no such review has taken l __ _

olace, when is it scheduled? I -

! 5. Scheduled date(s) for submitting proposed licensing action and Not scheduled at this time; succorting information. to be determined.

~

{6. Important licensing considera-tions associated with refueling, e.g., new or different fuel de-sign or supplier, unreviewed --

design or performance analysis methods, significant changes in

fuel design, new operating pro-

! cedures.

7. The number cf fuel assemblies 1482 HTGR fuel elements.

(a) in the core and (b) in -

the scent fuel storage pool. 11 spent HTGR fuel elements

8. The present licensed spent fuel pool storage capacity and the Capacity is limited in size to about one-si:e of any increase in licensed storage capacity that has ,seen third of core (approximately 500 HTGR -

requested or is planned, in leleents). No change is planned.  !

j nu=ber of fuel asse=blies. i e i

,n - , _ , - - . - . , , . , - . n. . , . . _ , - - , . . - . . - , . - . - - . . , _ . - . . .

REFUELING I:! FORMATION (CONTINTIED)

9. The projected dat ' of the 1992 under Agreements AT(04-3)-633 and last refueling that can be DE-SC07-79ID01370 between Public Service discharged to the spent fuel i Company of Colorado, General Atomic pool assuming the present l Company,andDOE.*

licensed capacity. i

  • The 1992 estimated date is based on the understanding that spent fuel discharged during the term of the Agreements will be stored by DOE at ,

the Idaho Chemical Processing Plant. The storage capacity has evidently been sized to accomodate eight fuel segments. It is estimated that the eighth fuel segment will be discharged in 1992.

2 7

l 2

l i

i i

l i

i i .-

t l

l