MONTHYEARSVP-99-182, Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A1999-10-12012 October 1999 Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A SVP-99-127, Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs1999-07-16016 July 1999 Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability1999-06-29029 June 1999 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months1999-03-30030 March 1999 Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable SVP-99-003, Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process1999-01-21021 January 1999 Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process SVP-98-355, Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days1998-11-30030 November 1998 Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days ML20151X2491998-09-0909 September 1998 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Consent of NRC for Indirect Transfer of Control of Midamerican Energy Co SVP-98-291, Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.61998-08-31031 August 1998 Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.6 SVP-98-252, Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C1998-07-31031 July 1998 Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C ML20196G0161997-05-0101 May 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3231997-04-29029 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Permitting Loading of ATRIUM-9B Fuel in Plant Unit 2 Core for Operational Modes 3,4 & 5 ML20138B3161997-04-21021 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Cycle 15 Operation Scheduled to Begin 970519 ML20137G3801997-03-26026 March 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting to Reconcile Discrepancy in Free Volume for Secondary Containment ML20135F7161997-03-0303 March 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Bases for TS 3/4.9.E to Clarify Purpose of SR 4.9.E ML20138L3641997-02-17017 February 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Correction of Error in Surveillance Requirement 4.9.A.8.h Re Diesel Generator Endurance Test ML17187A7971997-02-17017 February 1997 Application for Amend to Licenses DPR-19 & DPR-25,App A,Tss, Section 3/4.7.K, Suppression Chamber & Section 3/4.8, Ultimate Heat Sink, to Address Issues Re Efforts to Reconstitute Design Basis of Containment Heat Removal Sys ML20113A7761996-06-10010 June 1996 Application for Amends to Licenses DPR-29 & DPR-30,to Reflect Transition of Fuel Supplier from GE to Spc. Nonproprietary EMF-94-219(NP) & Proprietary EMF-94-219(P) encl.EMF-94-219(P) Withheld Per 10CFR2.790 ML20098A3451995-09-20020 September 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising TS Upgrade Program & Improving Plant Submittals ML20082H7181995-04-10010 April 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising SR for HPCI & RCIC Sys ML20080K8021995-02-23023 February 1995 Application for Amends to Licenses DPR-29 & DPR-30,changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc ML20080J0881995-02-21021 February 1995 Application for Amends to Licenses DPR-29 & DPR-30 Re Changes to Name of Iowa-Illinois Gas & Electric Co,25% co- Owner of Plant,To Reflect Results of Merger Between Electric Company,Midwest Power Sys Inc & Midwest Resources Inc ML20078Q6011994-12-12012 December 1994 Application for Amend to License DPR-29,incorporating Corrections to TS Section 3.4/4.4 Re Standby Liquid Control Sys ML20077A4081994-11-21021 November 1994 Application for Transfer & Amend to Licenses DPR-29 & DPR-30 ML20064J3041994-03-11011 March 1994 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Limiting Conditions of Operation & Surveillance Requirements 3.6.1 & 4.6.1,describing Snubber Visual Insp Intervals & Corrective Actions,Per GL 84-13 & GL 90-09 ML20059K7351994-01-14014 January 1994 Application for Emergency Amend to License DPR-30 for NRC Review & Approval of Two USQs Associated W/Interim Mod on Quad-Cities Station Unit 2,to Resolve Concerns Described in NRC Bulletin 93-003 ML20059A7241993-12-20020 December 1993 Application for Amends to Licenses DPR-29 & DPR-30, Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2 ML20059A8211993-10-21021 October 1993 Application for Amends to Licenses DPR-29 & DPR-30,proposing TS to Delete Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint ML20101R7871992-07-0606 July 1992 Application for Amend to License DPR-29,reflecting Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Calculation, GE-NE-901-013-0491, Quad Cities HPCI Turbine Steam Supply Pressure Low Setpoint Calculation Encl.Rept Withheld ML20096F3941992-04-20020 April 1992 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Deletion of Isolation Functions & Surveillance Requirements for CR Ventilation Sys Chlorine & Sulfur Dioxide Analyzers ML20091C4681992-03-31031 March 1992 Application for Amends to Licenses DPR-29,DPR-30,NPF-11 & NPF-18,changing TS to Include Commed Topical Rept NFSR-0085, & Suppls 1 & 2 to Section 6.6 to Describe Improved Analytical Methods Re Core Operating Limits Rept ML20091L7561992-01-21021 January 1992 Application for Amends to Licenses DPR-29 & DPR-30,changing Spec Ref in TS 3.5.C.2 from 4.5.C.3 to 4.5.C.3.a & in TS 3.5.E.2 from 4.5.E.3 to 4.5.E.3.a,in Regard to HPCI & RCIC Sys ML20086E2271991-11-20020 November 1991 Revised Application for Amends to Licenses DPR-29 & DPR-30, Restoring Various Channel Calibr Frequencies from STS Requirements to Current Requirements Re TS Section 3.1/4.1, Reactor Protection Sys, in Ref to ML20085E6071991-10-11011 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,revising TSs Sections 6.1.G to Reflect Position Title Change, 6.1.G.1.b to Reflect Rev of Approval Authority & Adding Sections 6.11 & 6.12 Re Access to High Radiation Areas ML20085D4301991-10-0707 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program. Existing Tech Specs & Environ Protection Plan (Nonradiological) Encl ML20079H0551991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec Section 1.0, Definitions to Reflect Tech Spec Upgrade Program ML20079H2081991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing Tech Spec Section 6.0, Administrative Controls ML20085C7571991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Sections 3.5/4.5, Core & Containment Cooling Sys & 3.6/4.6, Primary Sys Boundary, as Part of TS Upgrade Program ML20079G0411991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing Current License Conditions Re Fire Protection W/New Tech Spec 3.12/4.12, Fire Protection Sys, Per Generic Ltrs 86-10 & 88-12 ML20079F9871991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing TS to Reflect Util Efforts to Upgrade Existing TS 3.8/4.8, Radioactive Effluents & 3.10/4.10, Refueling ML20079G0921991-09-30030 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing TS to Reflect Effort to Upgrade Existing TS Sections: 3.2/4.2, Protective Instrumentation & 3.9/4.9, Auxiliary Electrical Sys ML20083D3541991-09-24024 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec 4.8.H.2.b(2) to Define Differential Temp Criteria for Control Room Emergency Filtration Sys Header ML20082V2021991-09-17017 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,App a, Reflecting Efforts to Upgrade Existing Tech Specs 3.3/4.3, Reactivity Control ML20082M8551991-08-29029 August 1991 Application for Amends to Licenses DPR-29 & DPR-30,deleting Tech Spec 3.11/4.11, High Energy Piping Integrity (Outside Containment). Mods Completed in 1979 for High Energy Piping ML20082H5011991-08-15015 August 1991 Suppl to 910627 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Sections 1.1/2.1, Fuel Cladding Integrity & 1.2/2.2, RCS Changing 800 Psig to 800 Psia in Specs 1.1.A & 1.1.B ML20082H1881991-08-15015 August 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Section 3.4/4.4, Standby Liquid Control Sys. Tech Spec Upgrade Program Encl ML20085B5851991-07-29029 July 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program & TS Section 5.0, Design Features. Quad Cities Nuclear Power Station Tech Spec Upgrade Program Encl ML20076D8771991-07-23023 July 1991 Application for Amends to Licenses DPR-29 & DPR-30, Upgrading Tech Specs Section 3.1/4.1, Reactor Protection Sys ML20077G9951991-06-28028 June 1991 Application for Amend to License DPR-30,reflecting Proposed Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Rept GE-NE-901-013-0491,Rev 1, Quad Cities HPCI Turbine Steam Supply... Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 1999-07-16
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARSVP-99-182, Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A1999-10-12012 October 1999 Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A SVP-99-127, Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs1999-07-16016 July 1999 Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability1999-06-29029 June 1999 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months1999-03-30030 March 1999 Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable1999-03-30030 March 1999 Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable SVP-99-003, Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process1999-01-21021 January 1999 Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process SVP-98-355, Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days1998-11-30030 November 1998 Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days ML20151X2491998-09-0909 September 1998 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Consent of NRC for Indirect Transfer of Control of Midamerican Energy Co SVP-98-291, Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.61998-08-31031 August 1998 Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.6 SVP-98-252, Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C1998-07-31031 July 1998 Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C ML20196G0161997-05-0101 May 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test ML20138G3231997-04-29029 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Permitting Loading of ATRIUM-9B Fuel in Plant Unit 2 Core for Operational Modes 3,4 & 5 ML20138B3161997-04-21021 April 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Cycle 15 Operation Scheduled to Begin 970519 ML20137G3801997-03-26026 March 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting to Reconcile Discrepancy in Free Volume for Secondary Containment ML20135F7161997-03-0303 March 1997 Application for Amends to Licenses DPR-29 & DPR-30,revising Bases for TS 3/4.9.E to Clarify Purpose of SR 4.9.E ML20138L3641997-02-17017 February 1997 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Correction of Error in Surveillance Requirement 4.9.A.8.h Re Diesel Generator Endurance Test ML17187A7971997-02-17017 February 1997 Application for Amend to Licenses DPR-19 & DPR-25,App A,Tss, Section 3/4.7.K, Suppression Chamber & Section 3/4.8, Ultimate Heat Sink, to Address Issues Re Efforts to Reconstitute Design Basis of Containment Heat Removal Sys ML20113A7761996-06-10010 June 1996 Application for Amends to Licenses DPR-29 & DPR-30,to Reflect Transition of Fuel Supplier from GE to Spc. Nonproprietary EMF-94-219(NP) & Proprietary EMF-94-219(P) encl.EMF-94-219(P) Withheld Per 10CFR2.790 ML20098A3451995-09-20020 September 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising TS Upgrade Program & Improving Plant Submittals ML20082H7181995-04-10010 April 1995 Application for Amends to Licenses DPR-29 & DPR-30,revising SR for HPCI & RCIC Sys ML20080K8021995-02-23023 February 1995 Application for Amends to Licenses DPR-29 & DPR-30,changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc ML20080J0881995-02-21021 February 1995 Application for Amends to Licenses DPR-29 & DPR-30 Re Changes to Name of Iowa-Illinois Gas & Electric Co,25% co- Owner of Plant,To Reflect Results of Merger Between Electric Company,Midwest Power Sys Inc & Midwest Resources Inc ML20078Q6011994-12-12012 December 1994 Application for Amend to License DPR-29,incorporating Corrections to TS Section 3.4/4.4 Re Standby Liquid Control Sys ML20077A4081994-11-21021 November 1994 Application for Transfer & Amend to Licenses DPR-29 & DPR-30 ML20064J3041994-03-11011 March 1994 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Limiting Conditions of Operation & Surveillance Requirements 3.6.1 & 4.6.1,describing Snubber Visual Insp Intervals & Corrective Actions,Per GL 84-13 & GL 90-09 ML20059K7351994-01-14014 January 1994 Application for Emergency Amend to License DPR-30 for NRC Review & Approval of Two USQs Associated W/Interim Mod on Quad-Cities Station Unit 2,to Resolve Concerns Described in NRC Bulletin 93-003 ML20059A7241993-12-20020 December 1993 Application for Amends to Licenses DPR-29 & DPR-30, Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2 ML20059A8211993-10-21021 October 1993 Application for Amends to Licenses DPR-29 & DPR-30,proposing TS to Delete Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint ML20101R7871992-07-0606 July 1992 Application for Amend to License DPR-29,reflecting Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Calculation, GE-NE-901-013-0491, Quad Cities HPCI Turbine Steam Supply Pressure Low Setpoint Calculation Encl.Rept Withheld ML20096F3941992-04-20020 April 1992 Application for Amends to Licenses DPR-29 & DPR-30, Requesting Deletion of Isolation Functions & Surveillance Requirements for CR Ventilation Sys Chlorine & Sulfur Dioxide Analyzers ML20091C4681992-03-31031 March 1992 Application for Amends to Licenses DPR-29,DPR-30,NPF-11 & NPF-18,changing TS to Include Commed Topical Rept NFSR-0085, & Suppls 1 & 2 to Section 6.6 to Describe Improved Analytical Methods Re Core Operating Limits Rept ML20091L7561992-01-21021 January 1992 Application for Amends to Licenses DPR-29 & DPR-30,changing Spec Ref in TS 3.5.C.2 from 4.5.C.3 to 4.5.C.3.a & in TS 3.5.E.2 from 4.5.E.3 to 4.5.E.3.a,in Regard to HPCI & RCIC Sys ML20086E2271991-11-20020 November 1991 Revised Application for Amends to Licenses DPR-29 & DPR-30, Restoring Various Channel Calibr Frequencies from STS Requirements to Current Requirements Re TS Section 3.1/4.1, Reactor Protection Sys, in Ref to ML20085E6071991-10-11011 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,revising TSs Sections 6.1.G to Reflect Position Title Change, 6.1.G.1.b to Reflect Rev of Approval Authority & Adding Sections 6.11 & 6.12 Re Access to High Radiation Areas ML20085D4301991-10-0707 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program. Existing Tech Specs & Environ Protection Plan (Nonradiological) Encl ML20079H0551991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec Section 1.0, Definitions to Reflect Tech Spec Upgrade Program ML20079H2081991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing Tech Spec Section 6.0, Administrative Controls ML20085C7571991-10-0202 October 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Sections 3.5/4.5, Core & Containment Cooling Sys & 3.6/4.6, Primary Sys Boundary, as Part of TS Upgrade Program ML20079G0411991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing Current License Conditions Re Fire Protection W/New Tech Spec 3.12/4.12, Fire Protection Sys, Per Generic Ltrs 86-10 & 88-12 ML20079F9871991-09-30030 September 1991 Application for Amends to Licenses NPF-29 & DPR-30,changing TS to Reflect Util Efforts to Upgrade Existing TS 3.8/4.8, Radioactive Effluents & 3.10/4.10, Refueling ML20079G0921991-09-30030 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing TS to Reflect Effort to Upgrade Existing TS Sections: 3.2/4.2, Protective Instrumentation & 3.9/4.9, Auxiliary Electrical Sys ML20083D3541991-09-24024 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec 4.8.H.2.b(2) to Define Differential Temp Criteria for Control Room Emergency Filtration Sys Header ML20082V2021991-09-17017 September 1991 Application for Amends to Licenses DPR-29 & DPR-30,App a, Reflecting Efforts to Upgrade Existing Tech Specs 3.3/4.3, Reactivity Control ML20082M8551991-08-29029 August 1991 Application for Amends to Licenses DPR-29 & DPR-30,deleting Tech Spec 3.11/4.11, High Energy Piping Integrity (Outside Containment). Mods Completed in 1979 for High Energy Piping ML20082H5011991-08-15015 August 1991 Suppl to 910627 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Sections 1.1/2.1, Fuel Cladding Integrity & 1.2/2.2, RCS Changing 800 Psig to 800 Psia in Specs 1.1.A & 1.1.B ML20082H1881991-08-15015 August 1991 Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Section 3.4/4.4, Standby Liquid Control Sys. Tech Spec Upgrade Program Encl ML20085B5851991-07-29029 July 1991 Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program & TS Section 5.0, Design Features. Quad Cities Nuclear Power Station Tech Spec Upgrade Program Encl ML20076D8771991-07-23023 July 1991 Application for Amends to Licenses DPR-29 & DPR-30, Upgrading Tech Specs Section 3.1/4.1, Reactor Protection Sys ML20077G9951991-06-28028 June 1991 Application for Amend to License DPR-30,reflecting Proposed Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Rept GE-NE-901-013-0491,Rev 1, Quad Cities HPCI Turbine Steam Supply... Encl.Rept Withheld (Ref 10CFR2.790(b)(4)) 1999-07-16
[Table view] |
Text
_ _
v t' ,.
[N Ccmmonwrith Edison j( v1'7 1400 Opus Place Downers Grove, minois 60515 March 11,1994 Mr. William T. Russell, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk
Subject:
Quad Cities Station Units 1 and 2 Application for Amendments to Facility Operating Licenses DPR-29 and DPR-30 Appendix A, Technical Specifications Snubber Visual inspection Intervals NRC_Dackemosm50-254 and 50-2M
References:
- 1. Generic Letter 84-13, " Technical Specification for Snubbers", dated May 3,1984,
- 2. Generic Letter 90-09, " Alternative Requirements for Snubber Visual Inspection intervals and Corrective Actions", dated December 11, 1990.
Mr. Russell:
In accordance with 10 CFR 50.90, Commonwealth Edison (CECO) proposes to amend Appendix A, Technical Specifications, of Facility Operating Licenses DPR-29 and DPR 30. The proposed amendment requests changes to Technical Specification Limiting Conditions of Operation (LCO) and Surveillance Requirements 3.6.1 and 4.6.1, which describe snubber visualinspection intervals and corrective actions.
This proposed Technical Specification amendment will provide surveillance requirements for new hydraulic snubbers, which will be installed on the Main Steam Lines (MSLs) during the Unit 1 refuel outage (01R13). This outage is scheduled to begin on i March 13,1994 and end on July 3,1994. These snubbers will also be installed on Unit 2 during the Unit 2 refuel outage (Q2R13) currently scheduled for the first quarter of 1995.
The installation of the hydraulic snubbers will prevent MSL snubber f ailures and address vibration concerns associated with the electromatic relief valves (ERVs).
The amendment request would change the Snubber VisualInspection Intervals and Corrective Actions in 3.6.1 and 4.6.1 to the format and content of the BWR Standardized Technical Specifications (STS), as revised by the provisions of Generic Letter (GL) 84-13
" Technical Specification for Snubbers", dated May 3,1984 and GL 90-09 " Alternative Requirements for Snubber Visualinspection Intervals and Corrective Actions", dated Decernber 11,1990 (References 1. and 2.).
qi i \
9403210129 940311 PDR ADOCK 05000254 .
p PDR
a &
Mr. William T. Russell March 11,1994 The amendment request is subdivided as follows:
- 1. Attachment A provides a description and safety analysis of the proposed '
changes to the Technical Specifications. ;
- 2. Attachment B provides marked-up and retyped Technical Specification pages.
- 3. Attachment C describes CECO's evaluation performed in accordance with 10CFR50.92(c), which confirms that no significant hazards consideration is involved.
- 4. Attachment D provides the Environmental Assessment.
This proposed amendment has been reviewed and approved by both CECO On-Site and Off-Site Review and the Quad Cities Plant Operating Review Committee in accordance with Commonwealth Edison procedure.
Commonwealth Edison is notifying the State of lilinois of this application for amendment by transmitting a copy of this letter and its attachments to the designated State Official.
~
Commonwealth Edison requests review and approval of this proposed Technical Speci'hation amendment by July 3,1994, to support the start-up of Quad Cities Station Unit 1 following the thirteenth refuel outage.
To the best of my knowledge and belief, the statements contained above are true and correct. In some respects, these statements are not based on my personnel knowledge, but upon information furnished by other Commonwealth Edison and contractor employees. Such information has been reviewed in accordance with company practice, and I believe it to be reliable.
Please direct any questions you may have concerning this amendment request to this office.
- n!
OFFICIAL SEAL nespectroiiy, MARY JO YACK jll PeOT ARY PUHlic st Ait of illtNotB $
MY CoMvisseure t metfW 911/29/9 7 d
................... .. ...... c , ') f ;
John L. Schrage Nuclear Licensing Administrator !
h]g,r O V <j $ !/// f u (
~
l ,- g- , .
4 Mr. t#illiam T. Russell March 11,1994 Attachments:
A. Description and Safety Evaluation of the Proposed Changes B. Marked-up and Retyped Technical Specification Pages C. Evaluation of Significant Hazards Consideration D. Environmental Assessment cc: J.B. Martin, Regional Administrator - Rill C. Miller, Senior Resident lospector - QCNPS C.P. Patel, Project Manager - NRR Office of Nuclear Safety -lDNS l
I
4 ATTACHMENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES A. DESCRIPTION OF THE PROPOSED CHANGE The proposed Technical Specification Amendment would change the Snubber Visual Inspection Intervals and Corrective Actions, contained in Surveillance Requirement 3.6.1 and 4.6.1, to the content of the BWR Standardized Technical Specifications (STS), as revised by the provisions of Generic Letter (GL) 84-13 " Technical Specification for Snubbers", dated May 3,1984 and GL 90-09 " Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions", dated December 11,1990 (References 1. and 2.).
B. DESCRIPTION OF THE CURRENT REQUIREMENT The current Technical Specification Surveillance 4.6.1 describes the surveillance requirements for the augmented inservice inspection program for snubbers.
Section 3.6.1/4.6.1 describes the method by which visual inspection intervals are determined and defines the visual inspection acceptance criteria to which the snubber surveillances are performed. The current visualinspection schedule is based on the number of inoperable snubbers found during the previous visual inspection and assumes that refueling intervals will not exceed 18 months. Depending on the number of inoperable snubbers found per inspection period and the previous occurrences, the inspection interval may change.
C. BASES FOR THE CURRENT REQUIREMENT The visual inspection frequency is based upon maintaining a constant level of snubber protection to each safety related system. Therefore, the required inspection interval varies inversely with the observed snubber failures on a given system and is determined by the number of inoperable snubbers found during an inspection of each system. In order to establish the inspection frequency for each type of snubber on a safety related system, it was assumed that the frequency of snubber failures and initiating events is constant with time and that the failure of any snubber on that system could cause the system to be unprotected and to result in failure of the system during an assumed initiating event. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.
However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25%) may not be uss o lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.
The acceptance criteria are to be used in the visual inspection to determine operability of the snubbers. For example, if a fluid port of a hydraulic snubber is found to be uncovered, the snubber shall be declared inoperable and shall not be determined operable via functional testing.
1 s ATTACHMENT A (cont.)
D. DESCRIPTION OF THE NEED FOR AMENDING THE TECHNICAL SPECIFICATIONS In order to prevent Main Steam Line (MSL) snubber f ailures and address vibration concerns associated with the electromatic relief valves, Commonwealth Edison will be replacing the current mechanical snubters with hydraulic snubbers. The hydraulic design will provide a dampening effect for the MSLs. The installation of the hydraulic snubbers will require a license amendment to add the functional testing and acceptance criteria for hydraulic snubbers to the Technical Specifications.
In addition to the need to incorporate hydraulic snubber functional testing and acceptance criteria, the current Technical Specification (3.6.1/4.6.1) for the snubber visual inspection schedule could become overly restrictive, requiring plant shutdowns due to increased inspection frequencies as well as a significant increase in radiological exposure to plant personnel. Generic Letter (GL) 90-09 presents alternative requirements for snubber-visualinspection intervals and corrective actions. These alternative requirements utilize the number of unacceptable snubbers found during the previous inspection in proportion to the sizes of the various snubber populations or categories to determine the snubber visual inspection frequency. This will allow inspections and corrective actions to coincide with plant outages. The alternative requirement in GL 90-09, to extend the visual inspection surveillance interval to up to 48 months, would reduce the resources spent on inspections and reduce radiological exposure to plant personnel.
E. DESCRIPTION OF THE AMENDED TECHNICAL SPECIFICATION REQUIREMENT The proposed changes adopt the format and content of the BWR-STS as modified by GL 84-13 and GL 90-09. GL 84-13 provides guidance for deletion of the Snubber Tables from the Technical Specifications. These changes were previously approved for Facility Operating Licenses DPR-29 and DPR-30 in Amendments 115 and 111 (Amendments and NRC SER dated February 22,1989).
GL 90-09 modifies the BWR-STS by recommending changes to the text of the surveillance requirements for Visualinspections and VisualInspection Acceptance Criteria. As stated in the Generic Letter, the new visual inspection schedule maintains the same confidence level as the existing schedule. The proposed inspection schedule is based on the number of unacceptable snubbers found during the previous inspection in proportion to the sizes of various snubber populations or categories. The snubbers may be categorized, based on their accessibility during power operation, as accessible or inaccessible. These snubbers may be examined separately or jointly. Quad Cities will make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category. A snubber is considered unacceptable if it f ails to meet the acceptance criteria of the visual inspection.
The inspection schedule provided in the Generic Letter is based on a fuel cycle of up to 24 months and may be as long as two fuel cycles, or 48 months for plants with other fuel cycles, depending on the number of unacceptable snubbers found during the l
previous visual inspection. Quad Cities currently has an 18 month fuel cycle and 1
< s I
4 ATTACHMENT A (cont.)
therefore proposes to incorporate the 48 month option, which would allow up to a three cycle frequency depending on the number of unacceptable snubbers found during the previous inspection period. If a review and evaluation can not justify continued operation with an unacceptable snubber, the snubber will be declared inoperable and the action requirements will be met. To determine the next surveillance interval, an unacceptable snubber may be reclassified as acceptable if it can be demonstrated that the snubber is operable in its as-found condition by performance of a functional test and if it satisfies the acceptance criteria for functional testing.
All snubbers found connected to an inoperable common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval. For instance, if a fluid port of a hydraulic snubber is found to be uncovered, the snubber is to be declared unacceptable and shall not be determined acceptable by functional testing.
The next visual inspection interval may be twice, the same, or reduced to as much as two-thirds of the previous inspection interval. The inspection interval depends on the number of unacceptable snubbers found in proportion to the size of the population or category for each type of snubber included in the previous inspection interval.
Proposed Table 4.6-3, " Snubber Visual Inspection Criteria," duplicates Table 4.7-2 in enclosure B of the Generic Letter. As stated in the notes following the table, interpolation is permitted between population or category sizes and the number of unacceptable snubbers. Interpolation is conservative, because any rounding is done to the next lower integer for the value of unacceptable snubbers in Columns A, B, or C if that integer includes a fractional value of unacceptable snubbers as determined by interpolation. If the number of unacceptable snubbers is equal to or less than the number in Column A of Table 4.6-3, the next inspection interval may be twice the previous interval but not greater than 48 months. If the number of unacceptable snubbers is equal to or less than the number in Colornn B of Table 4.6-3, the next inspection interval shall be the same as the previous interval. If the number of unacceptable snubbers is equal to or greater than the number in Column C of Table 4.6-3, the next inspection interval shall be two-thirds of the previous interval.
However, if the number of unacceptable snubbers is less than the number in Column C, but greater than the number in Column B, the next interval shall be reduced proportionately by interpolation, that is, the previous interval shall be reduced by a factor that is one-third of the ratio of the difference between the number of unacceptable snubbers found during the previous interval and the number in Column B to the difference in the numbers in Columns B and C. The provisions of Specification 1.0.DD are applicable for all inspection intervals up to and including 48 months. The flexibility provided by 1.0.DD allows reasonable planning of unit outages and surveillance scheduling.
F. BASES FOR THE AMENDED TECHNICAL SPECIFICATION REQUEST The Bases for Section 3.6.1/4.6.1 of the Technical Specification have been changed to agree with the changes to the specification. The visualinspection frequency will be a s ATTACHMENT A (cont.)
based on maintaining a constant level of snubber protection to the safety-related systen.,
as given in Generic Letter 90-09, " Alternative Visual Inspection Intervals and Corrective Actions". Therefore, the new schedule is based on the number of unacceptable snubbers found during the previous inspection in proportion to the sizes of various snubber population or categories.
The new inspection schedule maintains assurance of snubber operability by basing future inspection periods on the number of failures of a given snubber type and manufacturer.
As stated in Generic Letter 90-09, the new schedule of inspections maintains the same confidence level as the existing schedule.
G. SCHEDULE CECO requests that this proposed amendment be approved prior to the end of the Unit 1 thirteenth refuel outage, Q1R13, which is presently scheduled to begin on March 13, 1994, and end on July 3,1994, it is also requested that this amendment be made effective on the date of issuance for Quad Cities Unit 1, and prior to the end of the thirteenth refuel outage on Unit 2 (O2R13).