Commonwealth Edimn Company Quad Citics Generating Station e*
22710 206th Avenue North Cordova, lL 61212-9740 Tel.409 M i-2211 ESK-97-051 March 3,1997 United States Nuclear Reg'ulatory Commission Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Quad Cities Nuclear Power Station Units 1 and 2 Notification ofChanges to Bases ofFacility Operating Licenses DPR-29 &
DPR-30, Appendix A, Technical Specification, Bases for Section 3/4.9.E Distribution - Operating NRC Docket Nos. 50-254/265
Reference:
(a)
J. F. Stang letter to D. L. Farrar dated September 18,1995, concerning issuance of License Amendments 160/156 for Quad Cities Station, Units 1 and 2 (b)
R. M. Pulsifer letter to D. L. Farrar dated June 28,1996 concerning Issuance of License Amendments 171/167 for Quad Cities Station, Units I and 2 (c)
B. L. Siegel letter to T. J. Kovach, dated May 11,1992, accepting Quad Cities Station Response to Generic Letter 91-11.
(d)
D. J. Chrzanowski letter to T. E. Murley, dated January 27,1992, Quad Cities Station Response to Generic Letter 91-11.
Pursuant to 10 CFR 50.59, Comed has changed the Bases ofFacility Operating Licenses DPR-29 and DPR-30, Appendix A, Technical Specifications, Bases for Section 3/4.9.E.
The change clarifies the purpose of Surveillance Requirement (SR) 4.9.E as verifying the correct breaker alignment. This allows alternate correct but other-than-normal breaker alignments to be controlled by other Technical Specifications and administrative controls, as described in Reference (d), Quad Cities Station's response to Generic Letter l
91-11.
9703130365 970303 f}(Uk PDR ADOCK 05000254 P
PDR I3007; agIpale!npppp A Unicom Compan)
U.S. NRC ESK-97-051
. March 3,1997 The bases for SR 4.9.E included the statement "The surveillance requirements verify the A.C. and D.C. electrical power distribution systems are functioning properly, with al the required circuit breakers closed and the buses energized from normal power."
Neither SR 4.9.E, LCO 3.9.E, nor Action 3.9.E.1 or 2 mention energization from normal power. Reference (a) approved a submittal for Section 3/4.9 that included the words
" with tie breakers open both between redundant buses within the unit and betreen units...," but Reference (b) approved a change to that submittal which removed those i
words. In Reference (b), the NRC noted that detailed breaker lineup requirements are not required to be in the Technical Specifications, and can be controlled by administrative controls. These controls are detailed in the Station's response to GL 91-11.
In support of the proposed change to the Technical Specification Bases, Comed has performed an evaluation pursuant to 10 CFR 50.59, and determined that an Unreviewed Safety Question does not exist. This Bases change has been reviewed in accordance with Quad Cities procedures. The marked up and revised Technical Specification Bases pages are attached.
If you have any questions concerning this letter, please contact Chuck Peterson, Regulatory Affairs Manager, at (309) 654-2241 extension 3609 Re
- fully, hA LA-SU B. S. Kraft, Jr.
Site Vice President Quad Cities Station
Attachment:
(1)
Marked-Up Technical Specification Bases Page (2)
Revised Technical Specification Bases Page cc:
A. B. Beach, Regional Administrator - RIII C. G. Miller, Senior Resident Inspector - Quad Cities R. M. Pulsifer, Project Manager - NRR Office of Nuclear Facility Safety - IDNS W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company F. A. Spangenberg, Regulatory Affairs Manager - Dresden DCD - License (Both electronic and hard copy)
M. E. Wagner, Nuclear Licensing Coordinator - Downers Grove ESK Letter File
[
ATTACHMENT 1 ESK-97-051, (Page 1 of 1)
Marked-Up Technical Specification Bases Page I
i 1
l
'