SVP-99-182, Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.A12 October 1999Application for Amends to Licenses DPR-29 & DPR-30,to Remove Turbine EHC Low Oil Pressure Trip from RPS Trip Function Requirements in TS Sections 2.2 & 3/4.1.AAnticipated operational occurrence
Fast acting solenoid valve
SVP-99-127, Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs16 July 1999Application for Amends to Licenses DPR-29 & DPR-30,replacing Limit for Any One Msli Valve of Less than or Equal 11.5 Scfh with Aggregate Value of Less than or Equal 46 Scfh for All MSIVs in TS Section 3/4.7.D, Pcivs
SVP-99-128, Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod Operability29 June 1999Application for Amends to Licenses DPR-29 & DPR-30,changing TS Section 3/4.3.C, Reactivity Control - Control Rod OperabilityShutdown Margin
Power change
SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months30 March 1999Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months
SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info30 March 1999Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info
SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable30 March 1999Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable
SVP-99-003, Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process21 January 1999Application for Amends to Licenses DPR-29 & DPR-30, Relocating Chemistry TS Requirements of TS Section 3/4.6.I, Primary Sys Boundary - Chemistry, to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process
SVP-98-355, Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 Days30 November 1998Application for Amends to Licenses DPR-29 & DPR-30,revising TS 3/4.8.J, Safe Shutdown Makeup Pump, to Reduce Current AOT from 67 Days to 14 DaysSafe Shutdown
ML20151X2499 September 1998Application for Amends to Licenses DPR-29 & DPR-30, Requesting Consent of NRC for Indirect Transfer of Control of Midamerican Energy CoIncorporated by reference
SVP-98-291, Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.631 August 1998Application for Amends to Licenses DPR-29 & DPR-30, Increasing Max Allowable MSIV Leakage from 11.5 Scfh to 30 Scfh Per Valve When Tested at 25 Psig,Iaw SR 4.7.D.6Safe Shutdown Earthquake
SVP-98-252, Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.C31 July 1998Application for Amends to Licenses DPR-29 & DPR-30, Clarifying Testing Requirements for Primary Containment Excess Flow Check Valves Contained in TS Bases 3/4.7.D & 3/4.12.CHydrostatic
ML20196G0161 May 1997Application for Amends to Licenses DPR-29 & DPR-30,revising Load Value for Diesel Generator to Be Equal to or Greater than Largest Single Load & Revising Frequency & Voltage Requirements During Performance of Test
ML20138G32329 April 1997Application for Amends to Licenses DPR-29 & DPR-30, Permitting Loading of ATRIUM-9B Fuel in Plant Unit 2 Core for Operational Modes 3,4 & 5Shutdown Margin
Hydrostatic
ML20138B31621 April 1997Application for Amends to Licenses DPR-29 & DPR-30, Requesting That NRC Grant Exigent Amend to TS 2.1.B & 6.9.A.6.b to Support Plant Cycle 15 Operation Scheduled to Begin 970519
ML20137G38026 March 1997Application for Amends to Licenses DPR-29 & DPR-30, Requesting to Reconcile Discrepancy in Free Volume for Secondary Containment
ML20135F7163 March 1997Application for Amends to Licenses DPR-29 & DPR-30,revising Bases for TS 3/4.9.E to Clarify Purpose of SR 4.9.E
ML20138L36417 February 1997Application for Amends to Licenses DPR-29 & DPR-30, Requesting Correction of Error in Surveillance Requirement 4.9.A.8.h Re Diesel Generator Endurance Test
ML17187A79717 February 1997Application for Amend to Licenses DPR-19 & DPR-25,App A,Tss, Section 3/4.7.K, Suppression Chamber & Section 3/4.8, Ultimate Heat Sink, to Address Issues Re Efforts to Reconstitute Design Basis of Containment Heat Removal SysUltimate heat sink
ML20113A77610 June 1996Application for Amends to Licenses DPR-29 & DPR-30,to Reflect Transition of Fuel Supplier from GE to Spc. Nonproprietary EMF-94-219(NP) & Proprietary EMF-94-219(P) encl.EMF-94-219(P) Withheld Per 10CFR2.790Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML20098A34520 September 1995Application for Amends to Licenses DPR-29 & DPR-30,revising TS Upgrade Program & Improving Plant SubmittalsSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20082H71810 April 1995Application for Amends to Licenses DPR-29 & DPR-30,revising SR for HPCI & RCIC Sys
ML20080K80223 February 1995Application for Amends to Licenses DPR-29 & DPR-30,changing Name of Iige to Reflect Results of Merger Between Iige,Mid American Energy Co,Midwest Power Sys Inc & Midwest Resources Inc
ML20080J08821 February 1995Application for Amends to Licenses DPR-29 & DPR-30 Re Changes to Name of Iowa-Illinois Gas & Electric Co,25% co- Owner of Plant,To Reflect Results of Merger Between Electric Company,Midwest Power Sys Inc & Midwest Resources Inc
ML20078Q60112 December 1994Application for Amend to License DPR-29,incorporating Corrections to TS Section 3.4/4.4 Re Standby Liquid Control Sys
ML20077A40821 November 1994Application for Transfer & Amend to Licenses DPR-29 & DPR-30Incorporated by reference
Stolen
ML20064J30411 March 1994Application for Amends to Licenses DPR-29 & DPR-30,changing TS Limiting Conditions of Operation & Surveillance Requirements 3.6.1 & 4.6.1,describing Snubber Visual Insp Intervals & Corrective Actions,Per GL 84-13 & GL 90-09
ML20059K73514 January 1994Application for Emergency Amend to License DPR-30 for NRC Review & Approval of Two USQs Associated W/Interim Mod on Quad-Cities Station Unit 2,to Resolve Concerns Described in NRC Bulletin 93-003Reactor Vessel Water Level
ML20059A72420 December 1993Application for Amends to Licenses DPR-29 & DPR-30, Increasing MCPR Safety Limit from 1.06 to 1.07 for Units 1 & 2
ML20059A82121 October 1993Application for Amends to Licenses DPR-29 & DPR-30,proposing TS to Delete Requirements for Demonstrating Operability of Redundant Equipment When ECCS Equipment Is Found Inoperable or Made Inoperable for Maint
ML20101R7876 July 1992Application for Amend to License DPR-29,reflecting Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Calculation, GE-NE-901-013-0491, Quad Cities HPCI Turbine Steam Supply Pressure Low Setpoint Calculation Encl.Rept WithheldPower Operated Valves
ML20096F39420 April 1992Application for Amends to Licenses DPR-29 & DPR-30, Requesting Deletion of Isolation Functions & Surveillance Requirements for CR Ventilation Sys Chlorine & Sulfur Dioxide Analyzers
ML20091C46831 March 1992Application for Amends to Licenses DPR-29,DPR-30,NPF-11 & NPF-18,changing TS to Include Commed Topical Rept NFSR-0085, & Suppls 1 & 2 to Section 6.6 to Describe Improved Analytical Methods Re Core Operating Limits Rept
ML20091L75621 January 1992Application for Amends to Licenses DPR-29 & DPR-30,changing Spec Ref in TS 3.5.C.2 from 4.5.C.3 to 4.5.C.3.a & in TS 3.5.E.2 from 4.5.E.3 to 4.5.E.3.a,in Regard to HPCI & RCIC Sys
ML20086E22720 November 1991Revised Application for Amends to Licenses DPR-29 & DPR-30, Restoring Various Channel Calibr Frequencies from STS Requirements to Current Requirements Re TS Section 3.1/4.1, Reactor Protection Sys, in Ref toShutdown Margin
ML20085E60711 October 1991Application for Amends to Licenses DPR-29 & DPR-30,revising TSs Sections 6.1.G to Reflect Position Title Change, 6.1.G.1.b to Reflect Rev of Approval Authority & Adding Sections 6.11 & 6.12 Re Access to High Radiation AreasHigh Radiation Area
ML20085D4307 October 1991Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program. Existing Tech Specs & Environ Protection Plan (Nonradiological) Encl
ML20079H0552 October 1991Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec Section 1.0, Definitions to Reflect Tech Spec Upgrade ProgramShutdown Margin
Offsite Dose Calculation Manual
Process Control Program
ML20079H2082 October 1991Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing Tech Spec Section 6.0, Administrative ControlsSafe Shutdown
Shutdown Margin
Offsite Dose Calculation Manual
Fire Barrier
Annual Radiological Environmental Operating Report
Process Control Program
Fire Protection Program
ML20085C7572 October 1991Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Sections 3.5/4.5, Core & Containment Cooling Sys & 3.6/4.6, Primary Sys Boundary, as Part of TS Upgrade Program
ML20079G04130 September 1991Application for Amends to Licenses NPF-29 & DPR-30,changing Current License Conditions Re Fire Protection W/New Tech Spec 3.12/4.12, Fire Protection Sys, Per Generic Ltrs 86-10 & 88-12Safe Shutdown
Fire Barrier
Fire Protection Program
ML20079F98730 September 1991Application for Amends to Licenses NPF-29 & DPR-30,changing TS to Reflect Util Efforts to Upgrade Existing TS 3.8/4.8, Radioactive Effluents & 3.10/4.10, RefuelingOffsite Dose Calculation Manual
Process Control Program
ML20079G09230 September 1991Application for Amends to Licenses DPR-29 & DPR-30,changing TS to Reflect Effort to Upgrade Existing TS Sections: 3.2/4.2, Protective Instrumentation & 3.9/4.9, Auxiliary Electrical SysOffsite Dose Calculation Manual
Scram Discharge Volume
ML20083D35424 September 1991Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Spec 4.8.H.2.b(2) to Define Differential Temp Criteria for Control Room Emergency Filtration Sys Header
ML20082V20217 September 1991Application for Amends to Licenses DPR-29 & DPR-30,App a, Reflecting Efforts to Upgrade Existing Tech Specs 3.3/4.3, Reactivity ControlShutdown Margin
Scram Discharge Volume
Overtravel
ML20082M85529 August 1991Application for Amends to Licenses DPR-29 & DPR-30,deleting Tech Spec 3.11/4.11, High Energy Piping Integrity (Outside Containment). Mods Completed in 1979 for High Energy Piping
ML20082H50115 August 1991Suppl to 910627 Application for Amends to Licenses DPR-29 & DPR-30,changing TS Sections 1.1/2.1, Fuel Cladding Integrity & 1.2/2.2, RCS Changing 800 Psig to 800 Psia in Specs 1.1.A & 1.1.BFuel cladding
ML20082H18815 August 1991Application for Amends to Licenses DPR-29 & DPR-30, Reflecting Util Efforts to Upgrade Existing TS Section 3.4/4.4, Standby Liquid Control Sys. Tech Spec Upgrade Program Encl
ML20085B58529 July 1991Application for Amends to Licenses DPR-29 & DPR-30,changing Tech Specs to Reflect Tech Spec Upgrade Program & TS Section 5.0, Design Features. Quad Cities Nuclear Power Station Tech Spec Upgrade Program Encl
ML20076D87723 July 1991Application for Amends to Licenses DPR-29 & DPR-30, Upgrading Tech Specs Section 3.1/4.1, Reactor Protection SysShutdown Margin
Scram Discharge Volume
ML20077G99528 June 1991Application for Amend to License DPR-30,reflecting Proposed Mod to HPCI Turbine Steam Exhaust Line.Ge Proprietary Rept GE-NE-901-013-0491,Rev 1, Quad Cities HPCI Turbine Steam Supply... Encl.Rept Withheld (Ref 10CFR2.790(b)(4))Power Operated Valves