ML20128N617

From kanterella
Jump to navigation Jump to search
Notification of 930217-18 Meeting w/ABB-CE in Charlotte,Nc to Discuss Status of Severe Accident Issues for Sys 80+ Std Design.Proposed Agenda Encl
ML20128N617
Person / Time
Site: 05200002
Issue date: 02/12/1993
From: Mike Franovich
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9302230320
Download: ML20128N617 (5)


Text

'

4 l

/#on aso '%

c UNITED STATES

! 3 v g 'j NUCLE AR REGULATORY COMMISSION a

WASHINGTON, D. C. 20555

(

[

February 12, 1993

....+

Docket No.52-002 MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO T. Gody B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:

Richard W. Borchardt, Acting Director Standardization Project Directorate ~

Associate Directorate for Advanced Reac ors and License Renewal Office of Nuclear Reactor Regulation FROM:

Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (SEVERE ACCIDENTS) l DATE AND TIME:

February 17, 1993 (8:30 a.m. - 5 p.m.)

February 18, 1993 (8 a.m. - 5 p.m.)

LOCATION:

Duke Engineering & Services, Inc.

230 South Tryon Street Charlotte, North Carolina 28201-1004 PURPOSE:

Meeting to discuss the status of the severe accident issues for the System 80+ standard design.

A proposed agenda is enclosed.

190066 DR DO O 2 O O2 A

PDR

February 12, 1993 PARTICIPANTS *:

NRC ABB-CE M. Franovich S. Ritterbusch J. Kudrick R. Schneider M. Snodderly T. Oswald S. Lee OfghI90nedIk Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-1121.

DISTRIBUTION:

/ Docket File:

PDST R/F SBajwa, 12G18 RBorchardt PDR JNWi; son TVWambach MXFranovich PShea OPA EJordan, MNBB 3701 GGrant, EDO ACRS (11), (w/o encl.)

P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES NRR Mailroom, 12G18 RBarrett, 801 JKudrick, 801 MSnodderly, 8D1 SJLae, 7H15 RPerch, 801 0FC:

LA:PDST:ADAR PM:PDSTgAR SC:P%:ADAR NAME:

PShe MFr

$:sg RBohardt 02/h3

[2M93 02/)*Ji93 DATE:

0FFICIAL DOCUMENT COPY:

CM0217.MXF i

i

ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems licensing Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006

c.

ii CE System 80+ Proposed Meeting Agenda February 17 and 18,1993 Wednesday, Feb. 17, 1993 8:30 am - 12 pm Discussions on Significant Structural Analyses

+

Ultimate Containment Pressure Value With Temperature Degradation

+

The Affect of Penetrations on Ultimate Capacity 4

Stress-Strain Curve

+

Selection and Bases for Maximum Strain

+

Revised Fragility Curve

+

Sump Design and the Cavity's Ability to Withstand Ablation Best Estimate Analysis Maximum Amount of Allowable Erosion (Radial / Axial)

+

Methods Employed to Optimize Sump Design and Location Design Criteria for Underground Piping

+

Ability of Pool Seal to Resist Upward Flow

+

Resistance to Pressure Impulse From FCI

+

December 2,1993 Structural RAls 12 pm - l pm LUNCH 1 pm - 3 pm Discussion ofIgniter Design and Placement

+

Environmental Envelope for Igniter Operation

+

Supporting Containment Analysis for Selected Sequences

+

Sudden Loss of Steam Inerting Due to Spray Actuation

+

Power Supply and Single Failure Criteria

+

Electrical Configuration and Failure Detection

+

Surveillance and Testing Capability

+

Placement Criteria Number and Location Enclosure

Thursday, Feb, 18,1993 8 am - 12 pm Demonstration of PACE Drawing System

+

Obtain Volumes and Vent Capacities

+

Obtain Better Understanding of Plant Arrangements

+

Obtain Hard Copies for Future Reference 12 pm - 1 pm

' LUNCH 1 pm - 5 pm Presentation on Revised Severe Accident Submittal

+

Summary of hiajor Changes From Original Submittal

+

Summary of How the hiajor Phenomena in 90-016 Are Being Addressed

+

Summary of hiAAP and CORCON Runs Completed Thus Far For 80+

+

Summary of Analysis to Establish Forcing Functions

+

Discussion of Open Issues of December / January hieetings i