Other: LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks, LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept, ML20035E086, ML20056E053, ML20057F792, ML20076G348, ML20128E892
|
MONTHYEARIR 05000285/19920291992-12-0707 December 1992 Insp Rept 50-285/92-29 on 921011-1121.No Violations or Deviations Noted.Major Areas Inspected:Followup of Events, Operational Safety Verification,Maintenence & Surveillance Observations & Followup on C/A on Previous Violations Project stage: Request ML20128E8921993-01-21021 January 1993 Forwards Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 921207 Request to Revise TS to Allow Fuel Rack Storage Capacity in Spent Fuel Pool Project stage: Other ML20128E8131993-02-0404 February 1993 Informs That Addl Info Needed & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval LIC-93-0081, Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility1993-03-19019 March 1993 Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility Project stage: Request ML20035A1741993-03-19019 March 1993 Requests Addl Info & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval ML20035C9511993-04-0202 April 1993 Forwards Request for Addl Info Re Plant Spent Fuel Pool Rerack.Response Anticipated within Four Wks Project stage: RAI ML20035E0861993-04-0808 April 1993 Informs of Need to Perform Structural Audit at Us Tool & Die Inc in Pittsburgh,Pa.Representative from Util Requested to Be Present to Answer Questions That Arise at Audit.Agenda Encl Project stage: Other ML20035D1761993-04-0808 April 1993 Forwards Request for Addl Info in Order to Continue Review of Util Proposing Revs to Amend Specifications 2.8,3.2(Table 3-5),4.4.2,5.10.3 & Figure 2-10 of TS Project stage: RAI LIC-93-0105, Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack1993-04-28028 April 1993 Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack Project stage: Request LIC-93-0146, Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa1993-05-14014 May 1993 Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa Project stage: Request ML20056E0531993-07-29029 July 1993 Forwards Environ Assessment & Finding of No Significant Impact Re Util 921207 License Amend Request to Change TS to Support Proposed Spent Fuel Pool Rerack.Notice of Issuance Also Encl Project stage: Other ML20056E5381993-08-12012 August 1993 Forwards Amend 155 to License DPR-40 & Safety Evaluation. Amend Changes TS to Increase Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies Project stage: Approval ML20057F7921993-10-13013 October 1993 Forwards Correction to Amend 155 to License DPR-40, Increasing Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies.Page 3-20d Issued W/Words Region I Still in Item 15,which Should Have Been Deleted Project stage: Other LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks1994-08-12012 August 1994 Provides Notification of Installation of Spent Fuel Storage Racks Project stage: Other ML20076G3481994-10-0606 October 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues.Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept1999-01-28028 January 1999 Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept Project stage: Other LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools2016-11-0202 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Project stage: Other 1993-04-08
[Table View] |
Text
. - - -
f Docket No. 50-285 October 13, 1993 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop 8E/EP4 Omaha, Nebraska 68102-224/
Dear Mr. Patterson:
SUBJECT:
CORRECTION TO AMENDMENT NO. 155 - FORT CALHOUN STATION, UNIT N0. 1 ISSUED AUGUST 12, 1993 (TAC NO. M85116)
On August 12, 1993, in response to your application dated December 7, 1992, as supplemented by letters dated March 19, April 28, and May 14, 1993, the Commission issued Amendment No. 155 to Facility Operating License No. DPR-40 for Fort Calhoun Station, Unit No.1.
The amendment made changes to the Technical Specification (TS) to increase the fuel storage capacity in the spent fuel pool to 1083 fuel assemblies.
P Page 3-20d was issued with the words " Region I" still in Item 15, which should have been deleted. The corrected page 3-20d is enclosed. We apologize for any inconvience.
Sincerely, ORIGINAL SIGNED BY:
l Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION:
. Docket. File NRC/LPDRs PD4-1 r/f OC/LFMB (4503)
J. Roe E. Adensam B. Beckner C. Grimes (llE22)
P. Noonan ACRS (10)
OGC (15B18)
S. Bloom D. Hagan (3206)
G. Hill (2)
P. Harrell,RIV OPA (2G5)
D. Pickett 0FC LA:PD4-b)h(
PM:PD4 _1 dQC
[
D:PD4-1,,A
l SBloom/b k[
WBecknefF1 NAME PNoonan
[0 h/93 lo/a /93
/ M3 P//3/93 l
DATE
/
COPY
((ES/N0 kEh/NO Yh/N0k YES/NO
/04 g
0FFICIAL RECORD COPY Document Name:
FC851,16.00R
\\
9310190137 931013 PDR ADOCK 05000285 f
k-P PDR l
I
i e* *E GO E
=
5'
' E UNITED STATES t
NUCLEAR REGULATORY COMMISSION j
/
WASHINGTON, D.C. 20555-0001 I
October 13, 1993 Docket No. 50-285 Mr. Terry L. Patterson 1
Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop 8E/EP4 Omaha, Nebraska 68102-2247
Dear Mr. Patterson:
SUBJ.f: CORRECTION TO AMENDMENT NO. 155 - FORT CALHOUN STATION, UNIT NO. 1 ISSUED AUGUST 12, 1993 (TAC NO. M85116)
On August 12, 1993, in response to your application dated December 7, 1992, as supplemented by letters dated March 19, April 28, and May 14, 1993, the i
Commission issued Amendment No. 155 to Facility Op' rating License No. DPR-40 4
for Fort Calhoun Station, Unit No.1. The amendment mede changes to the Technical Specification (TS) to increase the fuel storage capacity in the spent fuel pool to 1083 fuel assemblies.
Page 3-20d was issued with the words " Region I" still in Item 15, which should have been deleted. The corrected page 3-20d is enclosed. We apologize for any inconvience.
4 Sincerely, Steven D. Bloom, Project Manager Project Directorate IV-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page 1
e i
l m,
-,-,r------
,,_,,,,,,r.
,,,,.-.,.,,,,.%%...,p.c
,,,r..
4,,,---y
-me.--y-
Mr. Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit 1 CC:
Mr. Michael F. McBride, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1
4 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager j
Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 4
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director i
Division of Radiological Health Nebraska Department of Health 301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 i
Mr. James W. Chase, Manager i
Fort Calhoun Station Post Office Box 399 i
Fort Calhoun, Nebraska 68023 h