Other: LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks, LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept, ML20035E086, ML20056E053, ML20057F792, ML20076G348, ML20128E892
|
MONTHYEARIR 05000285/19920291992-12-0707 December 1992 Insp Rept 50-285/92-29 on 921011-1121.No Violations or Deviations Noted.Major Areas Inspected:Followup of Events, Operational Safety Verification,Maintenence & Surveillance Observations & Followup on C/A on Previous Violations Project stage: Request ML20128E8921993-01-21021 January 1993 Forwards Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 921207 Request to Revise TS to Allow Fuel Rack Storage Capacity in Spent Fuel Pool Project stage: Other ML20128E8131993-02-0404 February 1993 Informs That Addl Info Needed & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval LIC-93-0081, Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility1993-03-19019 March 1993 Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility Project stage: Request ML20035A1741993-03-19019 March 1993 Requests Addl Info & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval ML20035C9511993-04-0202 April 1993 Forwards Request for Addl Info Re Plant Spent Fuel Pool Rerack.Response Anticipated within Four Wks Project stage: RAI ML20035E0861993-04-0808 April 1993 Informs of Need to Perform Structural Audit at Us Tool & Die Inc in Pittsburgh,Pa.Representative from Util Requested to Be Present to Answer Questions That Arise at Audit.Agenda Encl Project stage: Other ML20035D1761993-04-0808 April 1993 Forwards Request for Addl Info in Order to Continue Review of Util Proposing Revs to Amend Specifications 2.8,3.2(Table 3-5),4.4.2,5.10.3 & Figure 2-10 of TS Project stage: RAI LIC-93-0105, Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack1993-04-28028 April 1993 Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack Project stage: Request LIC-93-0146, Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa1993-05-14014 May 1993 Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa Project stage: Request ML20056E0531993-07-29029 July 1993 Forwards Environ Assessment & Finding of No Significant Impact Re Util 921207 License Amend Request to Change TS to Support Proposed Spent Fuel Pool Rerack.Notice of Issuance Also Encl Project stage: Other ML20056E5381993-08-12012 August 1993 Forwards Amend 155 to License DPR-40 & Safety Evaluation. Amend Changes TS to Increase Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies Project stage: Approval ML20057F7921993-10-13013 October 1993 Forwards Correction to Amend 155 to License DPR-40, Increasing Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies.Page 3-20d Issued W/Words Region I Still in Item 15,which Should Have Been Deleted Project stage: Other LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks1994-08-12012 August 1994 Provides Notification of Installation of Spent Fuel Storage Racks Project stage: Other ML20076G3481994-10-0606 October 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues.Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept1999-01-28028 January 1999 Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept Project stage: Other LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools2016-11-0202 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Project stage: Other 1993-04-08
[Table View] |
Text
January 21, 1993 Docket No. 50-285
}
Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop BE/EP4 Omaha, Nebraska 68102-2247
Dear Mr. Gates:
SUBJECT:
NOTICL Of CONSIDERATION Of ISSUANCE Of AMENDMENT 10 FACILITY OPERATING LICENSE, PROPOSED NO SIGNIflCANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR HEARING - FORT CALHOUN STATION, UNIT 1 (TAC NO. H85116)
Enclosed is a copy-of the subject notice which relates to your app 1 4ation for amendment dated December 7, 1992, to revise the Technical _ Specifications to allow the fuel rack storage capacity in the Spent fue Pool to be increased to provide storage for 1083 assemblies.
'he notice has been forwarded to the Office of the federal Register for publication.
Sincerely, ORIGINAL SIGNED BY:
Steven Bloom, Project Manager Project Directorate IV-1 Divisich of Reactor Projects - lil/IV/V Office of Nuclear Reactor Regulation Enclnsure:
Notice cc w/ enclosure:
See next page DISTR 10llT10N:
Docket file NRC & Local PDRs PD4-1 Reading JRoe MVirgilio GHubbard SBloom PNoonan OGC DHagan ACRS (10) 0 <1 0 0 4 2 OPA C /LfMB PD4-1 Plant file
~ABBeach
- See previous concurrence LA PD4-1 M
,PMAPD4-1 000 D:PD4-1 k OFC 1
l llAME PNoonanC I S h vw AHodgdon*
GHubbard DATE
\\ /\\N93 I /21/93 1/14/93-
/ F/ /93 k
Off!CIAL RECORD COPY l Document =Name:
FC85116.ind sa Q
D D
O O
p PDR'
- @ tec %
9 UNIT ED STATES 3
[',
I,g NUCLE AR REGULATORY COMMISSION a
g t
W ASHING T ON, D, C. 20665
\\
k'.....,
January 21, 1993 Docket No. 50-285 Mr. Terry L. Patterson Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Hall Mail Stop BE/EP4 Omaha, Nebraska 68102-2247 Dcar Mr. Gates:'
SUBJECT:
NOTICE OF CONSIDERATION OF ISSVANCE OF AMENDMENT TO FACILITY OPERATING LICENSE PROPOSED NO SIGNiFICANT HAZARDS CONSIDERATION DETERMINA? ION, AND OPPORTUNITY FOR HEARING - FORT CALHOUN STATION, UNIT 1 (!AC NO. M85116)
Enclosed is a copy of the subject notice which relates to your application for amendment da',ed December 7,1992, to revise the Technical Specifications to allow the feel rack storage e.a)acity in the Spent Fuel Pool to be increased to prcvide storage for 1083 assem>11es.
The notice has been forwarded to the Office of the Federal Register for publication.
Sincerely,
' Steven Bloom, Project Manager Project Directorate 1V-1 Division of Reactor Project.t - Ill/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Notice cc w/ enclosure:
See next page
Hr. Terry L. Patterson Omaha Public Power District Fort Calhoun Station, Unit No. 1 CC:
Harry H. Voigt, Esg.
LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Resident inspector U.S. Nucicar Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health' Nebraska Department of Health 301 Centennial Hall, South' Post Office Box 95007 Lincoln, Nebraska 68509 Mr. James W. Chase, Manager Fort Calhoun Station Post Office Box 399 Fort Calhoun, Nebraska 68023 4
,