TABLE 3-5 (Continued)
USAR Section Test Freauency Reference 3d
- c -o 10c.
(continual) 4.
Automatic and/or manual initi-At least once per plant operating cycle.
ation of the system shall be dernonstratal.
ab 11.
Containment Cool-1.
Demonstrate damper action.
I year, 2 years, 5 years, and every 5 9.10 04 ing and Iodine years thereafter.
3 Removal Fusible "80 Linked Dampers 2.
Test a spare fusible link.
"D O -
N 12.
Diesel Generator Calibrate During each refueling outage.
8.4.3
,u Under-Voltage Relays 13.
Motor Operated Verify the contacta pickup value u During each refueling outage.
Safety Injection 185% of 460 V.
Loop Valve Motor Starters (HCV-311, 314, 317, 320, 327, 329,331,333,312, 315, 318, 321) 14.
Pressurizer Heaters Verify control circuits operation During each refueling outage, for post-accident heater use.
15.
Spent Fuel Pool Test neutron poison samples for 1,2,4,7, and 10 years after Racks dimensional change, hardness change,.
installation, and every 5 years weight, neutron attenuation change thereafter.
and specific gravity change.
16.
Verify all manual isolation During each refueling outagejust Gas Vent System valves in each vent path are prior to plant start-up.
in the open position.
2.
Cycle each automatic valve in During each refueling outage.
the vent path through at least one complete cycle of full travel from the control room.
Verification of valve cycling may be determined by observa-tion of position indicating lights.
3.
Verify flow through the reactor During each refueling outage.
coolant vent system vent paths.
3-20d Amat No. '!,5',"J,75,'",T,155
.-.