ML20035E086
From kanterella
Jump to navigation
Jump to search
Letter Sequence Other | |
|---|---|
TAC:M85116, (Approved, Closed) | |
Administration Results Other: LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools, LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks, LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept, ML20035E086, ML20056E053, ML20057F792, ML20076G348, ML20128E892 | |
MONTHYEARIR 05000285/19920291992-12-0707 December 1992
[Table View]Insp Rept 50-285/92-29 on 921011-1121.No Violations or Deviations Noted.Major Areas Inspected:Followup of Events, Operational Safety Verification,Maintenence & Surveillance Observations & Followup on C/A on Previous Violations Project stage: Request ML20128E8921993-01-21021 January 1993 Forwards Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 921207 Request to Revise TS to Allow Fuel Rack Storage Capacity in Spent Fuel Pool Project stage: Other ML20128E8131993-02-0404 February 1993 Informs That Addl Info Needed & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval LIC-93-0081, Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility1993-03-19019 March 1993 Forwards Response to NRC 930204 Request for Addl Info Re Spent Fuel Pool Rerack & Response to 930222 Telcon W/Nrc Re Total person-rem Exposure from 1983/1984 Rerack Project at Facility Project stage: Request ML20035A1741993-03-19019 March 1993 Requests Addl Info & Commitment to Continue Review of Licensee 921207 Proposed Revs to Amend TS 2.8,3.2 (Table 3-5) Re Spent Fuel Pool Rerack Project stage: Approval ML20035C9511993-04-0202 April 1993 Forwards Request for Addl Info Re Plant Spent Fuel Pool Rerack.Response Anticipated within Four Wks Project stage: RAI ML20035E0861993-04-0808 April 1993 Informs of Need to Perform Structural Audit at Us Tool & Die Inc in Pittsburgh,Pa.Representative from Util Requested to Be Present to Answer Questions That Arise at Audit.Agenda Encl Project stage: Other ML20035D1761993-04-0808 April 1993 Forwards Request for Addl Info in Order to Continue Review of Util Proposing Revs to Amend Specifications 2.8,3.2(Table 3-5),4.4.2,5.10.3 & Figure 2-10 of TS Project stage: RAI LIC-93-0105, Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack1993-04-28028 April 1993 Forwards Response to Request for Addl Info Re Station Spent Fuel Pool Rerack Project stage: Request LIC-93-0146, Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa1993-05-14014 May 1993 Forwards Response to NRC 930408 Request for Addl Info Re Spent Fuel Pool Rerack,Per NRC 930420 Audit Conducted at Us Tool & Die Facility in Pittsburgh,Pa Project stage: Request ML20056E0531993-07-29029 July 1993 Forwards Environ Assessment & Finding of No Significant Impact Re Util 921207 License Amend Request to Change TS to Support Proposed Spent Fuel Pool Rerack.Notice of Issuance Also Encl Project stage: Other ML20056E5381993-08-12012 August 1993 Forwards Amend 155 to License DPR-40 & Safety Evaluation. Amend Changes TS to Increase Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies Project stage: Approval ML20057F7921993-10-13013 October 1993 Forwards Correction to Amend 155 to License DPR-40, Increasing Fuel Storage Capacity in Spent Fuel Pool to 1083 Fuel Assemblies.Page 3-20d Issued W/Words Region I Still in Item 15,which Should Have Been Deleted Project stage: Other LIC-94-0167, Provides Notification of Installation of Spent Fuel Storage Racks1994-08-12012 August 1994 Provides Notification of Installation of Spent Fuel Storage Racks Project stage: Other ML20076G3481994-10-0606 October 1994 Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues.Subject to Agreement by Nrc/Nrr Project Manager,Items Considered Ready to Close Project stage: Other LIC-99-0005, Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept1999-01-28028 January 1999 Submits Correction of Spent Fuel Pool time-to-boil Info Used by NRC During Review Which Resulted in Issuance of Amend 155 to License DPR-40.Attachment 2 Provides Corrected Pages for Holtec Licensing Rept Project stage: Other LIC-16-0098, Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools2016-11-0202 November 2016 Response to Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools Project stage: Other 1993-04-08 |
| ML20035E086 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/08/1993 |
| From: | Steven Bloom Office of Nuclear Reactor Regulation |
| To: | Tira Patterson OMAHA PUBLIC POWER DISTRICT |
| References | |
| TAC-M85116, NUDOCS 9304140255 | |
| Download: ML20035E086 (4) | |
Similar Documents at Fort Calhoun | |
|---|---|
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20035E086&oldid=4576348"