f x
7 g jd0 MAY 4 1982
[)CS-A!S Docket Mos. 50-266 and 50-301 gg 4
/
i, g
Mr. C. W. Fay
/
[W'T +O [/<Y, ' y 7.
Assistant Vice President
~~
Wisconsin Electric Power Company iS 2
"v 231 West flichigan Street
(,g>h' gb
!111waukee, Wisconsin 53201 e,'
h i...
' 6
Dear Mr. Fay:
SUBJECT:
EXEMPTION REQUEST - FIRE PROTECTI0!i RULE SCHEDULAR REQUIREMENT OF 10 CFR 50.48(c) - POINT BEACH MUCLEAR PLANT UNITS 1 AND 2 The Fire Protection Rule, (10 CFR 50.48) published on Novenber 19, 1980, becane effective on February 17, 1981, and required the results of certain tasks to be submitted to the Nuclear Regulatory Connission (HRC) by llarch 19, 1981. By letter dated March 18, 1981, you applied for exenption from some of these schedular requirements of 10 CFR 50.48(c). The exenption reqJested related to the tino allowed to complete a reassessnent of the fire protection features at your plant for conformance to the specific requirenents of Section III.G of Appendix R to 10 CFR 50; to evaluate the difference deternined for each area; and to design modifications to neet the requirements or provide a justifiable basis by neans of a fire hazards analysis for an exenption from such requirenents.
In addition, your letter of March 18, 1981 requested schedular exemptions frrr1 the implenentation dates for nodifications required by Section III.0 and certain substantive exenptions from the requirenents of Section III.lf of Appendix R to 10 CFR 50.48. The latter of these exemption requests was addressed by the staff's letter of May 4,1981 which denied this exenption request and will not be discussed here. For reasons as stated in your exemption request, you requested additional time to conplete the above reassessments, evaluations and designs. By letters dated April 4,1981, October 2,1981 and January 29, 1982, you revised your request.
Your latest submittal included an enclosure giving your evaluation, plans l
and descriptive diagran in accordance with the requirenents of Section 111.0 of Appendix R to 10 CFR 50.48.
It also requested schedular exenptions for implenentation of sone portions of Sections III.F and III.t1 of Appendix R.
Subsequent to your latest submittal, by telephone conversation on April 6, 1982, nenbers of your staff indicated that your expected conpletion date of March 1,1982 was not net with respect to fire barrier rodifications and circulating water punphouse fire protection nodifications but in actuality these itens were coop'ljeted a few days later than March 1,1982. Further, you expect conpletion of the fire detection system nodifications to extend beyond the June 1,1982 completion date identified in your latest subnittal.
Therefore, we are adninistratively changing the dates of your exenption l
O205130670 820504 PDR ADOCK O5000266 F
$URNAME)
.......a.....a...a.
.aa..aan..aa a."
..aaaan a.a.
.a
- a a a+aaaa a aa
~~a
- a**aa aaa*
DATE )
a aa.a.a a".~.a"
~~~.a~~~~.~~
a.~-
.aaaaa.aa an.aaa aaa"a -
- * " " " ~ ~ ~ ~ " "
aaa
- a""*"
"a"""
"a nac ronu sia om ancu om OFFICIAL RECORD COPY uso - - m em
r l
a.
x y
l request to June 3D,1982 for completion of the fire barrier nodifications and circulating water pumphouse fire protection nodifications and conpletion of the fire detection system modifications as discussed with menbers of your staff. lie understand frm your staff that the fire barrier and circulating water pumphouse fire protection nodifications are now conplete.
The Comatission has granted your request as described in the enclosed Exemption (Enclosure 1). The Exenption is conditional upon a requirenent that the subnittal be complete, as defined in the Exemption.
If the NRC should detemine that your suhnittal is not complete, you will be found in violation of 10 CFR 50.48(c).
Such a violation will be a continuing one froat the date granted by the Exemption and a civil penalty nay be imposed for each day the violation continues.
A copy of the Exenption is being filed with the Office of the Federal Register for publication. provides a rewording of the request for infomation included with Generic Letter 81-12. This rewording is the result of neetings with repre-sentative licensees who felt that clarification of the request would help expedite responses.
It does not include any new requests and, therefore, will not adversely affect licensees' ability to respond to Generic Letter 81-12. provides infomation regarding our criteria for evaluating exenption requests from the requirements of Section III.G.2 of Appendix R.
Sincerely Original signed by Timothy G. Colburn, Project Manager Operating Reac' tors Branch #3 Division of Licensing
Enclosures:
DISTRIBUTION 1.
Exonption J ocket File OELD 2.
Clarification of RAI HRC PDR IAE 3.
Criteria for Evaluating L PDR TBarnhart-4 Exemption Request NSIC ACRS-10 ORB #3 Rdg OPA-Ci111es cc w/ enclosures:
DEisenhut SECY ORAB RDiggi See next page PMKreutzer-3 JHeltemes RAClark TWambach TColburn TNovak l
Gray File-+4 VBenaroya hp OParr 4 h uhush f
h e/p lef Wy82 on g
e lio a
/
...... 3 : 0,,,,,
,,,,1:..... /..d
.;.s..k....... OflD.....
....... 02D P.........
8 3 7 omca>
sunuuch PMK..r.e. z.e..r..T. C..o..l..b.u..r..n / p n..
..T..M......a.,.c.,.h..#..a..r..k..........
o v..a..k..........
Qd
[ut....
.4/]. N.lL8.2.......
42.S..
V$1/.92........
.Al...l.6.2....
. AD..?]B.?........A.WL8.2......
. A)QL6.2........
1B.1...........
om>
N3C FORM 318 phD NRCM CNG OFF1CIAL RECORD COPY usceo: mi-assee
c
- e? "%
c' e
5, '
' ti "
.. UNITED STATES.
DISTRIBUTION:
e f
NUCLEAR REGUt.ATORY COMMISSION Docket File
'%,****,.o#
WASHINGTON, D.C. 20555 ORB #3 Rdgj PMKreutzer.,-
- f e
Docket No. 50-266/50-301
~
Docketing and Service Section
. Office of the Secretary of the Commission _
SUBJECT:
HISCONSIN ELECTRIC' POWER C0!!PANY, Point Beach Nuclear Plant.
?-
Unit lios. il.and 2. -
~
2*
~
Two signed originals of the Federal Register Notic'e identified below are enclosed for your transmittal to the Office of the Federal Register for pubication. Additional conformed copies ( 12)of the Notice are enclosed for your use.-
O Notice of Receipt of Applicatbn for Construction Permit (s) and Operating License (s)..
-Y O ' Notice of Receipt of Partial Application for Con?,truction Perr' nit'(s) and Facility License (s): Time for Submission of Views on Antitrust Matters.
0 Notice of Availability of Applicant's' Environmental Report.-
0 Notice of Proposed issuance of Amendment to Facility Operating License.
O Notice of Receipt of Application' for Facility License (s); Notice'of Availability of Applicant's -
Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
. O Notice of Availability of NRC Draft / Final Enviro.1merital Statement.-
O Notice of Limited Work Authorization.
O Notice of Availability of Safety Evaluation Report.
O Notice of issuance of Construction Permit (s).
0 Notice of Issuance of Facility Operating License (s) or Amendment (s).
CD Other: Exemntion of: Fire Protection
- Division of Licensing Office of Nuclear Reactor Regulation As Stated b
0RB#3:DLf.
orres hiKreutzer/pr smus 5/d/82_._
om NRC FORM 102 7 - 79 s
5 f
7
- - ~,,
~
Wisconsin Electric Power Company CC*
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.
6E12 Nuclear Road Washington, D. C.
20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road
.Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Hs. Kathleen M. Falk General Counsel W8 sconsin's Environmental Decade 114 N. Carroll Street Macison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region Y Office ATTN: Regional Radiation Representative 230 S. Dearborn Street Chicago, Illinois 60604 Chairman i
Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator Nuclear Regulatory Commission, Region III Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 i
._-