ML20052A857

From kanterella
Jump to navigation Jump to search
Order to Show Cause Why Suspension of Activities Under License TR-1 Should Not Be Continued
ML20052A857
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 10/24/1977
From: Case E
Office of Nuclear Reactor Regulation
To:
GENERAL ELECTRIC CO.
Shared Package
ML20052A734 List:
References
FOIA-81-483 NUDOCS 8204290275
Download: ML20052A857 (9)


Text

'

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISil0N I:

In the Matter of

)

)

c i

GENERAL-ELECTRIC COMPANY

)

)

Operating License No. TR-1 j ;

(Vallecitos Nuclear Center -

)

S General Electric Test

)

d i Reactor)

)

k d

ORDER TO SHOW CAUSE I.

The General Electric Company (GE or licensee), Pleasanton, Ca,lifornia, is the holder of Operating License No. TR-1, issued on January 7,1959, which authorizes the operation of the General Electric Test Reactor (GETR), at GE's Vallecitos Nuclear Center (YNC) located near Pleasanton, California. Renewal of Operating License No. TR-1 has been applied for by GE and a notice of consideration of the application for renewal was published in the Federal Reaista on September 15, 1977 (42 FR 46427). A hearing in this matter has been requested and an Atomic Safety and Licensing Board has been designated to rule on petitions for leave to intervene.

II.

GETR is a 50 MW thennal test reactor primarily used in the production of radioisotopes for medical diagnosis and therapy and for industrial

[

purposes. Additionally, boiling water reactor fuel element development testing its conducted in this facility.

L ENCLOSURE 1 8204290'269 w

W

^~^_

. -. -.... - + -

- - ~ ~ ~ * *