05000445/LER-1990-013, :on 900509,while Installing Jumpers Across Feedwater Pump Speed Controllers,Pump Coastdown Occurred, Resulting in Loss of Feedwater Flow & Reactor Trip.Caused by Inadequate Procedure Review.Review Performed

From kanterella
(Redirected from ML20043F157)
Jump to navigation Jump to search
:on 900509,while Installing Jumpers Across Feedwater Pump Speed Controllers,Pump Coastdown Occurred, Resulting in Loss of Feedwater Flow & Reactor Trip.Caused by Inadequate Procedure Review.Review Performed
ML20043F157
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 06/08/1990
From: William Cahill, Mcgee G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-013, NUDOCS 9006140199
Download: ML20043F157 (12)


LER-1990-013, on 900509,while Installing Jumpers Across Feedwater Pump Speed Controllers,Pump Coastdown Occurred, Resulting in Loss of Feedwater Flow & Reactor Trip.Caused by Inadequate Procedure Review.Review Performed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv), System Actuation
4451990013R00 - NRC Website

text

- - - - -

9 A Log # TXX-90189

==

P9 File # 10200 C

907.3

- r C

Ref. # 50.73 7UELECTRIC 50.73(a)(2)(iv)

June 8, 199')

larrutwe Vke Presuirnu U. S. Nuclear Regulatory Commission i

Attn:

Document Control Desk Washington, D. C.

20555 SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-445 REACTOR PROTECTION SYSTEM ACTUATION LICENSEE EVENT REPORT 90-013-00 Gentlemen:

Enclosed is Licensee Event' Report 90 013-00 for Comanche Peak Steam Electric Station Unit 1, " Reactor Trip Due to Loss of Feedwater Pump Speed Controllers During Maintenance."

Sincerely, ad-William J. Cahill, Jr.

DEN /daj Enclosure c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 9006140199 900608 k

PDR ADOCK 03000445 S

PDC KO North Oltve Street LB81 Danes. Teus 73XI

Enclosure to TXXo90189 NRC FORu ses u.8 DMCLEAR fE0VLATORY F ^ ^ - -

,,p40ED oms No. ste>0tes E3PflES.4#seet EtteeATED DURDEN PER RESPONDE TO C00fPLY UNTH THIB BFORMATION 00LLECTON REQUEST: 00hMRS. PORwefe COMedEwTS IIEGARD880 C",,'. "AND TO THE PAPERUUO81K RE UCENSEE EVENT REPORT (LER)

'"'%'",', "d',g* ef,,R,,

DC. 30666 OFFICE OF MANAGEWENT AND SUDGET.WASHeeGTON. DC. 300tXL Feseay Name (1)

Domhet kN Q)

Pe9D (3)

COMANCHE PEAK - UNIT 1 0151010l0141415 1 I 0F i1 11 Tce (4; REACTOR TRIP DUE TO LOSS OF FEEDWATER PUMP SPEED CONTROLLERS DURING MAINTENANCE t.m gi a wom ow e -

s 8

u-os<

vo-vo-

~~

o=r v=

N/A 015101010l l

I n 'Gl2.S O 910 01113 010 OlB Ol8 913 N/A 0151010101 I

I aio, m m..se,, e.-.e., e

.e i,o.e-.. io 3 ar c..e e,

. e.,, so, m, wede R

]

20 402M 20.4064c)

[

M73 ax2(sv) 73.71M s

20 405<aH1)@

60.3& o(1) no 73:ag3M 73.71(al y' lo I4 lg

,,0,

=0es<uine m3=om

==ww) a* rs-a

  • m--i-1-i.

r 20 4054a)(1)(d)

E73(aX2M E73(exatwdHA)

N8tC Form mea) 20 X1) M

[

ax

[

a

)

k

{

L'anness Certars For The LE R (tri Naano Teespeare Nweezer GARY P. MCGFF (ACTING) SUPERVISOR. COMPLIANCE 8Y1Y7 8 l 917 l-l 5141717 Cow Che Lue For Each Carmorere f asse Densetzed as The Resort (19

+ lll lll R$h'$

h Cams System C.--

Manutectwet

Cause

System CotSceie't Manolooiwee Q

9

+ lll lll -~Rll Bussiervenenf Repost Esinceed (14)

Exposeed h I b I * * * '

S Awesasen Ove <=,e.- E,mae< s a-a es on e>

[D wo l

I I I Abstract (Lwrit to 1400 epaans. Le.. asswommeessy (dison sungle space typewr nen tres) (18)

At approximately 1504 CDT on May 9,1990, while using a procedure, written for Mode 5 Cold Shutdown, or Mode 6 Refueling, to calibrate a feedwater pump discharge pressure transmitter, jumpers were installed across the feedwater pump speed controllers while they were being used to maintain feedwater pump speed during Mode 1 Power Operation, installation of the jumpers caused a coastdown of the feedwater pumps, resulting in a loss of feedwater flow and reduction of steam generator water levels. An automatic reactor trip occurred when the Steam Generator Water Level Low-Low Trip Setpoint was reached. Plant recovery was completed without further incident or unexpected findings.

The root cause of the event has been determined to be an inadequate review and approval process for certain procedure changes. As corrective actions for this event, a procedure revision will ensure technical reviews and operationalimpact assessments are performed for mode applicability interpretations. Generic corrective actions will increase sens!tivity to the impact that non safety components can have on an operating plant. The Single Point Failure Analysis, which identifies these components, will be utilized programmatice'ry.

s Enclosure to TXX 90189

==c sonu a,

W 8 MUCd4R M&AATORY 00we004 apm,;g no og ESTRAATED SUICEN PER RE080NSE TO C0tPLY WTH M 990ftAATON LICENSEE EVENT REPORT (LER)

%,'%,M','; 1 l7eo',,",**" W,,",,7,,, 1 TEXT CONTINUATION.

%",',"%"b' "**^.' a"v'e "g*,g*,cT,Q OFFCE OF MAN 4M64ENT AND OUDGET.WADHes0 Tost. DC.Selsk Fansey Nemo (1)

Damas breer (2)

LE R bater ft)

Peps (2 g

v. a we=

a PRESFff.?JE;rRAIM ',5 ' o ' o ' o ' d ' d 's a'o o '

I3 o'o o l2 l,

, DESCRIPTION OF WHAT OCCURRED A.

PLANT OPERATING CONDITIONS BEFORE THE EVENT

On May 9,1990 at 1500, Comanche Peak Steam Electric Station (CPSES) Unit 1 was in Mode 1, Power Operation, operating at 48 percent power.

B.

REPORTABLE EVENT DESCRIPTION (INCLUDING DATES AND APPROXIMATE TIMES OF MAJOR OCCURRENCES)

Event Classification:

An event or condition that resulted in an automatic actuation of any Engineered Safety Feature (ESF), including the Reactor Protection System (RPS).

On the morning of May 9,1990, the feedwater pump discharge pressure transmitter -

(Ells:(PT)(SJ)) was identified as indicating about 70 pounds per square inch-gage (PSIG) less than actual feedwater header pressure. A corrective maintenance work order was written to troubleshoot the problem and, if necessary, to calibrate the transmitter..This work order was assigned priority 12, meaning that it would be worked for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day to achieve the earliest possible completion, it was decided that the calibration procedure for the transmitter which was written to be performed during Mode 5, Cold Shutdown, or Mode 6, Refueling, would be used as 4

part of the work order. To allow the procedure to be performed during Mode 1, a review of technical specifications and commitments was performed at approximately 1300 by an Instrumentation and Control (I&C) support engineer (utility, non licensed). The review was performed in accordance with the I&C Work Control procedure and determined that there were no technical specification requirements or commitments applicable to the feedwater pump discharge pressure channel. This review was concurred with by the on duty Unit Supervisor (utility, licensed).

f

.4 '

8-Enclosure tD TXX 90189 NRC FORM 300A, U.S. IfJCLE AR REOULATORY COMMISSION APPMD OMB M DiMed EStaAATED SURDCN PER RE 000 PLY WITH THE pdFORMATION LICENSEE EVENT REPORT (LER)

M C' g ',';, W,,',*,*,* g g,',",* g' TEXT CONTINUATION

'7",d'" O%'1%^,"."**^,",,ve,T*0 egg 0FFICE OF MANAGEMENT AND OL20ET.WAAMINGTON, DC. 3000s.

I f aseey same (1)

Dunes powvaar m LER pewsher (S)

Pegs (3) p L

v-g

m-m

l COMANCHE PEAK UNIT 1 0151010101414 l 5 910 0l1l3 -l010 013 OF 1l1

(

w w. ~.as.

me m ma.m 1

y After receiving approval from the Unit Supervisor and notifying the Reactor' Operator-l (utility, licensed), the l&C technicians (utility, nemlicensed) began to set up for L

calibrating the transmitter. The second step of the calibration setup instructions was L

to install jumpers across the output of the Westinghouse feedwater pump speed j-automatic and manual controllers (Ells:(SCO)(SJ)). This step was performed at approximately 1504. Because both feedwater pumps (Ells:(P)(SJ)) were being controlled by the Westinghouse speed control signals, performance of this step caused both feedwater pumps to coast down with a zero speed demand. The coastdown of tne feedwater pumps caused a loss of feedwater flow which was l

annunciated in the control room by several alarms.

The control room reactor operators (utility, licensed), alerted by main control board alarms (Ells:(ALM)(IB)), attempted to restore feedwater pump speed with the -

Westinghouse speed contrc!!ers in manual. Manual control, however, had no effect on the feedwater pumps with the output H the Westinghouse speed controllers jumpered immediately thereafter, the feNwater isolation valves (Ells:(ISV)(SJ))

closed on anti water hammer interlock dta to low feedwater flow. Approximately 30 seconds later, a reactor operator (utility, licensed) manually started the Train A and Train B motor driven auxiliary feedwater pumps (Ells:(P)(BA)). With the feedwater 1

isolation valves closed and steam generator water levels already low, the Unit i

Supervisor determined that recovery was not possible and ordered a manual turbine trip and reactor trip. The turbine was tripped at approximately 1506. The turbine trip caused a shrink in steam generator water level below the steam generator low-low-level reactor trip setpoint, and the reactor tripped automatically at 1505:48 on low-low c; iam generator level just before the reactor was tripped manually. The turbine -

dr;vor, auxiliary feedwater pump automatically started on low low steam generator '

l levels. The Train A and Train B motor driven auxiliary feedwater pumps had already -

been manually started. At approximately 1506 a feedwater isolation signal occurred 1

l due to low average reactor coolant system temperature after reactor trip. However,

)

l as noted above, the feedwater isolation valves were already closed.

j The control room operators dealt effectively with this event. During the event the operators considered transferring the feedwater pumps to manual General Electric speed control; however, the potentiometers were not balanced with the

)

Westinghouse speed controller output. Additionally, the operators only had 18

)

seconds between the time the feedwater pumps started coasting down and the time l-the feedwater isolation valves closed. Overall, there was little chance of recovering from the transient. Afterthe reactor trip, the operators restored steam generator

~-

~

t

[

[ Enclosure to TXXo90189 nac roiW men us. =ucaan moutato= comumso=

EstNATEC BUICEN PER fE 000 PLY WITH THE OFOfWAT10N LICENSEE EVENT REPORT (LER)

MC'%,"Ty; 1,, 7c,',,,",",",*, M,=,

TEXT CONTINUATION

"*"d*" *J* f1M,,,o *;^,',o"ucT, *s**"c",*"f@

ance or unsaasucut ue suonT. W orow. oc.===

Feoday Nemo (1)

Desma, Neveer g)

LE R Nunter 3)

P g G) nnMANnWF PF Ak - IINIT 1 01Al01nlAldldlA Qin n l 1 l '4 Olo old OF 1l1 mn,.r.

. ~

w-m ew n i

1.

levels at a centrolled rate, ensuring reactor coolant system temperature was maintained.. All systems operated as designed, allowing plant stabilization in Mode 3 Hot Standby, without further event.

An event or condition that results in an automatic actuation of any ESF, including the RPS is reportable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> under 10CFR50.72(b)(2)(ii). At approximately 1633 on May 9,1990, the Nuclear Regulatory Commission Operations Center was notified of the event via the Emergency Notification System.

C.

STATUS OF STRUCTURES. SYSTEMS. OR COMPONENTS THAT WERE INOPERABLE AT THE START OF THE EVENT AND THAT CONTRIBUTED TO THE EVENT Not applicable - no structures, systems, or components were inoperable at the start of the event that have been determined to have contributed to the event.

D.. CAUSE OF EACH COMPONENT OR SYSTEM FAILURE. IF KNOWN I

Not applicable - no component or system failures have been identified.

E.

FAILURE MODE. MECHANISM. AND EFFECT OF EACH FAILED COMPONENT Not applicable - no component failures have been identified.

q F.

FOR FAILURES OF COMPONENTS WITH MULTIPLE FUNCTIONSalST OF SYSTEMS OR SECONDARY

' FUNCTIONS THAT '!/ERE ALSO AFFECTED Not applicable - no failures of components with multiple functions have been identified.

L '

Enclosure to TXX-9016 I

maceanu asan v s aucaan mouvom comuseen

.,mmo aus =o..

EstaAATED eVRoEN PGR E coerLY WIYTH THE D.PORuATioN

[

L LICENSEE EVENT REPORT (LER)

",,',*'%,"T','; 17 7,,",,, 3 W,"*,,*",,

v,

i TEXT CONTINUATlON '

""*" "f 0171%^,*.""*^,",,oc, ""Oc*,"""@

p once or uannaeusut ano suoart.=asse.oran. oc.mma b

s g p3 o

w,,m an N.e. es>

re, m v-e w*

_g 2 n. -

unc,IT 1 01510 l O l 01414 l 5 910 Ol113 COMANCHE PEAK - UN 010 015 OF 1l1

- 3.u., o n i

G.

FOR FAILURES THAT RENDEREQ A TRAIN OF A SAFETY SYSTEM INOPERABLE. AN ESTIMATE OF THE ELAPSED TIME FROM THE r

l DISCOVERY OF INOPERABILITY UNTIL THE TR AIN WAS RETURNED o

TO SERVICE Not applicable no failures were involved.

.l L

q H.

THE METHOD OF DISCOVERY OF EACH COMPONENT OR SYSTEM FAILURE OR PROCEDURAL ERROR During the post trip evaluation it was determined that the l&C calibration procedure l

was inappropriate for Mode 1.

l l.

CAUSE OF THE EVENT

o l-The reactor trip occurred as a result of jumpering out the Westingh0Jse feedWater L

pump speed controllers while they were being used to maintain feedwater pump 1

l_

speed.

R l

L j

Root Cause 1 The inadequate review and approval process for certain procedure changes resulted primarily from the practice of allowing procedures to be performed in plant modes other than those specified in the prerequisite step and marking it "N/A" (Not Applicable). This practice is allowed by the l&C Work Control procedure which L

requires a review of technical specifications and commitments, and with Shift L

Supervisor concurrence to perform a procedure in a mode other than that specified E

in the prerequisites. Neither the l&C engineer nor the Unit Supervisor performed a L

complete technical review since it was not required. While the requirements of the a

l&C Work Control procedure were fully satisfied, a more detailed review would have identified the need for some other method of calibration in Mode 1.

l l

[

.p

i 4

' Epclosure to TXX 90189 ^

.l NRC FORM SgtA US NUCLEAR RE04A10RT COMMSSION APPRDWEDOMO NO.31060108 -

EfTas4TED BufWEN PERIE 00058tY WITH The 890fte4 TION

~ LICENSEE EVENT REPORT (LER)

% C' %, M 7;, W oo'o",",*",o W, M,

1 t-TEXT CONTINUATION

""*",,","f*,,g,",*,$',".'"**^,','o*ueM,e%,

lj OFFICE 0r MANAGEMENT AND BJDGET.WAGNefGTON. DC. 3RROL

%, % m Da u a..,

r.

v

.a "e-"

w nnuANnHF PFAl(. IINIT 1 nlElololnldldlE Qin nlida nin olR OF 1l1 w

- ac % m.A.m n i

Root Cause 2 ii The plant impact review of the work order by Operations and l&C was less than j

adequate. The procedure's special conditions state the Feedwater Pump A speed

- 3 controller, the Feedwater Pump B speed controller, and associated alarms should be ~

considered out of service during the test.. This should have alerted Operations and

~

l&C to the potential for a loss of feedwater pump speed co.ntrol. The Westinghouse speed controllers were still being used when the event was initiated.

Contributina Factor 1 3

The l&C calibration procedure was less than adequate because it was written for use during cold shutdown,~ and did mes clearly identify the plant impact in the prerequisites section. The procedure states that during this test, the Feedwater Pump A speed controller and the Feedwater Pump B speed controller would be out of service. More descriptively, the procedure should have listed specific tag numbers

^

stating that the Westinghouse manual and automatic _ speed controllers would be out of service. Additionally, the jumpers do not need to be installed during a transmitter '

-(

calibration.

Contributina Factor 2 Prior to installation of the jumpers, the I&C technician did not review applicable documentation to understand the impact of the installed jumpers. Therefore, when the I&C technician installed the jumpers, he did not know the effect of the jumpers nor was he aware of their purpose.

Enol;sure to TXX 90189 NRC FORM 3esA UA NWCLEAR REOULATORY COMMSSIO86 APP OMB NO OD.0HN ESTRAATED huRDEN PER RESPONSE TO CONPLY WITH TMS DFORMATIDN LICENSEE EVENT REPORT (LER)

M C' %, g ','; " g oo',,,","",",,"o W,"f,", %,,

' TEXT CONTINUATION

'Tci",g y@b"**^.' a"u'cTOc"***Z a

OncE or uAsAof uEuf Ano suonn.we.eTou.oc.nen

,,m a

wm LER W #0i Peps (3)

Yew 8

T2 W

m Ol1l3 COMANCHE PEAK - UNIT 1 0l51010101414l5 910 0IO Ol7 OF 1l1 w i. -. %..

.dac % =u., im J.

SAFETY SYSTEM RESPONSES THAT OCCURRED The following safety systems actuation signals occurred as a result of the event.

FeedwaterIsolation (Ells:(SJ))

Reactor Protection System (Ells:(JC))

Auxiliary Feedwater (Ells:(BA))

K.

FAILED COMPONENT INFORMATION

Not applicable no failed components were involved, 11.

ASSESSMENT OF THE SAFETY CONSEQUENCES AND IMPLICATIONS OF THIS EVENT The loss of speed control and coastdown of both feedwater pumps is a loss of normal feedwater event. The Loss of Normal Feedwater analysis in the Final Safety Analysis Report (FSAR) Chapter 15.2.7 would bound the event for several reasons. (1) The FSAR analysis is performed with assumptions which minimize the decay heat removal capability (i.e., secondary system steam relief through the self actuated safety valves instead of the steam dumps, and the worst single failure in the auxiliary feedwater system). In the event, the motor driven auxiliary feedwater pumps were started before steam generator water levels reached the low-low trip point. The Auxiliary Feedwater System performed without failure. (2) The FSAR analysis assumes the initial reactor coolant average temperature is 6.5 degrees F higher than the nominal Engineered Safety Features (ESF) value. The plant was at normal average temperature at the time of the event. (3) The FSAR analysis is performed at 102 percent of thermal rated power. The plant was operating at 48 percent power at the time of the event. These assumptions conservatively bound the event at all expected power levels. Because this event is bounded by the FSAR Analysis and because the FSAR analysis shows that a loss of normal feedwater does not adversely affect the core, the reactor coolant system (Ells:(AB)), or the steam system, this event posed no threat to the health and safety of the public.

Enclosure to TXX-90189

  1. fRC FORM 3esA U.S NUOLEAA MOULATORY COMMSSION Af4'At>40 OMB 100. @ Met EstalATED GufMN PER IE C0erLY WTH TW 9F0ftAATON LICENSEE EVENT REPORT (LER)

",,5,c'%,",M7; x"* M*,',*, M,",,T,,

v,

' "f,i*,',"1l,M."***,*oucWOe","f@

g TEXT CONTINUATION ana or unuaaswwt 4,e suouT.was oToN.oc men Farsay harve (1)

Deshet Nweveer (2)

LER huntum S)

Peps (3)

Year g

g g

N COMANCHE PEAK - UNIT 1 01510101014I4l5 910 Ol113 Olo oI8 OF 1l1 1 n. -.

N w n.a. m lit.

CORRECTIVE ACTIONS

A.

IMMEDIATE A post trip review was performed to verify proper response of automatic protection systems, assess _ plant conditions and document information related to the event.-

The I&C procedure for performing the transmitter calibration was changed on May 9, 1990 Steps were included which allow transmitter calibration at power, without jumpering out the Westinghouse speed controllers. The transmitter was successfully recalibrated on May 10,1990 under a corrective maintenance work order.

B.

ACTIONS TO PREVENT RECURRENCE Root Cause 1 The review and approval process for certain procedure changes was inadequate, Root Cause 1 Corrective Action The I&C Work Control procedure will be revised to ensure that technical reviews as well as operational impact assessments will be performed whenever a mode appilcability interpretation is done until the procedure revision is implemented; l&C has issued a memorandum requiring mode prerequisite changes to be processed as procedure changes,in lieu of marking prerequisite "N/A".

Root Cause 2

- The lack of a more thorough review of maintenance impact on plant operations, Root Cause 2 Corrective Action A Lessons Leamed information Form was issued detailing specific questions the operators should have satisfactorily answered with respect to the impact on the plant, prior to allowing work to be performed.

Eociosure t's TXX 90189 nac nm, A us. =uotsaa mma4=v 0-sec=

- o o,,,,o. -

ESTtaATED BUlWEN PER IE ODIS'LY WITH TMS 950MMATION LICENSEE EVENT REPORT (LER)-

g,'t,"y; 17 *g* *",", g,*J,"'*"",

TEXT CONTINUATION

'Toi 7 g g " ",", g ***"g** " [

o OFFICE OF MANAfEleENT AfC BLEGET.VMSMpeGTON, DC. 30000.

Facesy Name (1)

Decem Nunemer 9)

LER lounter fm Page m v-i e

e l

0l1 l3 -l010 019 CF l111 COMANCHE PEAK - UNIT 1 01510101014I4l5 910 w i. -. -

. Nac % m a.,iin The operators were reminded via shift order that they may send a priority 12 work package to Site Work Control Center to conduct a plant impact assessment similar to-what is currently being done with routine work by the Site Work Control Center.

I&C_ will conduct training on the Lessons Leamed Information Form to ensure that the question list is understood and addressed prior to the Shift Supervisor authorizing the work.

Contributina Factor 1 The lack of a calibration procedure written for use during operating modes.

Contributina Factor 1 Corrective Action To ensure the need for future mode prerequisite reviews is minimized, the mode

. applicability of each I&C procedure will be evaluated during the normal biannual review of procedures, if a procedure can be performed during any additional modes, the procedure will be revised to establish appropriate conditions for each mode added.

Contributina Factor 2 A less than adequate understanding of procedure impact prior to performance.

Contributina Factor 2 Corrective Action l&C will conduct training that will reinforce the practice of reviewing the effects of installing jumpers, lifting leads or temporarily changing plant configuration prior to performing a maintenance or surveillance activity.

x x

.tt' Enclisure to TXX 90189 NRC FORM 3004 U.S. NUCLE 4A IE00LATORY 00h0MEEIDM APPIt0VED CBS 800. mMes EStadATED BUMOEN PER E 000 FLY UNTH The BSOltdATON LICENSEE EVENT REPORT (LER)

      • ', %,'",,T','; ff foo',,,",",,*,, M,,M, TEXT CONTINUATION

'"*"*"i",,g,"f,7fA" '"*",'*,o"u'oT",,",oi%,%

OFFCE Or ndANA0EWENT A30 BLalKT. waste 80 TON.DC. 31108 Facesy Piams (1)

Docmal towntur (2)

LER Pewntier fB)

Peps (E Year 2

M E7 0 l 1 13 l-l010 110 OF 1l1 COMANCHE PEAK - UNIT 1 0l51010l0141415 910 1

-..e e.. ~ esRc % =A.m n C.

ACTION TAKEN ON GENERIC CONCERNS IDENTIFIED AS A DIRECT RESULT OF THE EVENT Generic Considerations 1)

Other departments in the Operations organization may not be consistent in'their guidelines for "N/A of procedure steps".

2)

A lack of sensitivity to the impact of non-safety components to an operating plant was identified to have existed before this event. Plant Evaluation had performed a Single Point Failure Analyses on systems with a high potential for causing a reactor trip. These analyses identified components which, by themselves, could result in a reactor trip. These analyses were not being effectively utilized.

Corrective Actions

1)

To ensure a consistency within Operations, all Operation Managers will review their procedures governing "N/A of procedure steps" to ensure that appropriate g

checks are made prior to marking a prerequisite step N/A. These checks will include as a minimum a check of technical specifications impact on the plant and a supervisors concurrence prior to acceptance of the N/A'd step.

Instructional steps to be marked not applicable will require as a minimum the L.

supervisors concurrence. Additionally, the N/A practice will be documented and

. Justified on the procedure when performed.

2)

The Singie Point Failure Analyses will be reviewed by Technical Support, to add the necessary warnings within the Managed Maintenance Computer Program. Operations and the work groups will review their respective programs to enhance sensitivity to these components. Each manager will conduct -

appropriate training to ensure work on these components is more rigorously i

controlled and appropriate precautions are taken before performing any work on l

these components.

l i,

b

Enclosum to TXX 90189 ?

NRC FORM 3084

. U.S. NUCLEAR REOULAtORY COMMIBOION APPRD940 OMB NO. MDmet E1 PEES:W50m ESTRMtED SUIWEN PER IESPOISE TO COIPLY VNtM tNS OSORMAtDN LICENSEE EVENT REPORT (LER)

""c'*""*""'*****"""""**"***

BURDEN E8tiMATE T0 THE RECOROS AND REPOmit MANAGEMENT TEXT CONTINUATION oc."no.a. ue to 1wE parer 0= woueten PROnct m.oiu>.

ancE or MAnAasMEHf ue suoeft.wAsweetoN. oc.assa Teewy Name (1)

Douns 8.unear m LER huator m Peps (3 v-a w

w s

COMANCHE PEAK '- UNIT 1 0151010101414l5 910 01113 010 111 OF '1'l1 1.n p, -..e.

n=c r A.m n i

1!

V i

r l,

IV,

PREVIOUS SIMILAR EVENTS

L There have been no previous similar events reported pursuant to 10CFR50.73.

}

V..

OTHER All times are approximate and Central Daylight Savings Time (CDT).