Corrected Operating Data Rept for Jan 1990 for Browns Ferry Units 1,2 & 3
ML20042F407
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/1990
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20042F373 List:
References
NUDOCS 9005080288
Download: ML20042F407 (3)


Text

'l OPERATING DATA REPORT DOCKET NO.

50-259 DATE-JAN 90 1

PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 LOPERATING STATUS

'1.

Unit Names BROWNS FERRY UNIT ONE

2. Reporting period: JANUARY, 1990

-3.. Licensed Thermal Power (MWt): 3293

4. Nameplate Rating (Gross MWe): 1152
5. Design Electric. Rating ~(Net MWe): 1065
6. Maximum Dependable. Capacity.(Gross MWe): 1098.4

.l

7. Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 I

=Through 7) Since Last Report, Give Reason: N/A r

~

9.

Power Level To which Restricted, If Any (Net MWe): N/A E

10.. Reason'For. Restrictions, If Any: N/A

.I i

THIS YEAR-TO

[

MONTH DATE CUMULATIVE

11. Hours In Reporting Period 744.0 744 135968 ]

'12..-Hours Reactor _Was: Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997 L

L14. Hours Generator On Line 0.0 0

58267-L 15.DUnit Reserve Shutdown Hours 0.0 0

0 s

L

.16.' Gross Thermal Generation (MWh) 0.0 0

168066787-l

17. Gross-Electric Generation (MWh) 0.0 0

55398130

-18.' Net Electric Generation (MWh)

-1393.0

-1393 53581695-

11. Unit Service Factor 0.0 0.0 42.9 l

220. Unit Availability Factor 0.0 0.0 42.9 L

21. Unit Capacity Factor (MDC Net) 0.0 0.0 37.0 L
22. Unit Capacity Factor (DER Net) 0.0 0.0 37.0 lc
23. Unit Forced Outage Rate 100.0 100.0 50.3 a
24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration cf Each):

25~ If Shut Down At End Of Reporting Period, Estimated Date 0f Startup: To be determined hkk kObb

[9 l

f OPERATING DATA REPORT-

.i DOCKET.NO.

50-260-DATE

.JAN 90 PREPARED BY S.A.RATLIFF TELEPHONE-205-729-2937 T

OPERATING: STATUS i

'1. Unit Name: BROWNS FERRY UNIT TWO i

L

'2.' Reporting-period: JANUARY, 1990 P

3.-Licensed, Thermal: Power (MWt): 3293 4.

Nameplate Rating.(Gross MWe): 1152

-_5'.

Design Electric Rating (Net MWe): 1065

16. Maximum Dependable Capacity-(Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065 8.fIf Changes Occur in Capacity Ratings (Items Number 3 Through 7).Since Last Report, Give Reason: N/A 9.EPower Level To which Restricted, If Any (Net MWe): N/A

'10.-Reason For Restrictions, If Any: N/A THIS-YEAR-TO MONTH DATE CUMULATIVE

[

11. Hours In Reporting Period 744.0 744

~130855 - l-i

12. Hours; Reactor Was Critical

' 0i. 0 0

55860

13. Reactor Reserve Shutdown Hours 0.0 0

14200 ii

14. Hours-Generator On Line-0.0-0 54338
15. Unit. Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

153245167 17.EGross Electric Generation =(MHh) 0.0 0

50771798 18.' Net Electric Generation (MWh)

-5775.0

-5775

'49108649

.19. UnitJService Factor 0.0 0.0 41.5 y

20. Unit Availability Factor 0.0 0.0 41.5 4

l21k Unit Capacity. Factor (MDC Net) 0.0 0.0 35.2 22.. Unit Capacity Factor (DER Net) 0.0 0.0 35.2 23'. Unit 1 Forced Outage Rate' 100.0 100.0 50.3 L

24. Shutdowns Scheduled Over Next 6 Month

}

-(Type,-Date, and Duration of Each):

L '

\\

12 5. If Shut Down At End Of Reporting Period, l

Estimated Date Of Startup; September 1989 1

4-o OPERATING DATA REPORT' l

L DOCKET NO.-

50-296 DATE-JAN 90 PREPARED BY-S.A.RATLIFF TELEPHONE 205-729-2937 1

i

' OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT THREE
2. Reporting period: JANUARY, 1990
3. Licensed-Thermal Power (MWt): 3293 t
4. Nameplate Rating (Gross MWe): 1152
5. Design Electric Rating (Net MWe): 1065 L
6. Maximum Dependable Capacity (Gross MWe)
1098.4 l-
7. Maximum Dependable. Capacity (Net MWe): 1065 l
18. If' Changes occur in Capacity Ratings.(Items Number 3 Through 7) Since Last Report, Give Reason: N/A l

1 L

'9.

Power. Level To which Restricted, If Any (Net MWe)': N/A 10.- Reason For Restrictions, If Any: N/A i-R THIS YEAR-TO MONTH-DATE CUMULATIVE

c.,

l

11. Hours In Reporting Period 744.0 744-

.113280 l.

L

.12. Hours Reactor Was Critical 0.0 0

45306 i

'13. Reactor Reserve Shutdown Hours 0.0 0

-5150

14. Hours Generator On Line 0.0 0

'44195

15. Unit Reserve Shutdown Hours 0.0 0

0'

1<6. Gross Thermal Generation (MWh) 0.0 0

131868267 1

17.. Gross Electric Generation (MWh) 0.0 0

43473760

[

18. Net Electric Generation (MWh)

-2367.0

-2367

-41992666 l

19. Unit Service Factor 0.0 0.0 39.0
20. Unit Availability Factor-0.0 0.0 39.0
21. Unit Capacity l Factor (MDC Net) 0.0 0.0 34.8
22. Unit: Capacity = Factor (DER Net) 0.0 0.0 34.8

,23. Unit Forced Outage Rate 100.0 100.0 54.2 24.-Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

l25. If Shstt Down At End Of Reporting Period,

' Estimated Date Of Startup: To be determined i