ML20042F407
| ML20042F407 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/31/1990 |
| From: | Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20042F373 | List: |
| References | |
| NUDOCS 9005080288 | |
| Download: ML20042F407 (3) | |
Text
'l OPERATING DATA REPORT DOCKET NO.
50-259 DATE-JAN 90 1
PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 LOPERATING STATUS
'1.
Unit Names BROWNS FERRY UNIT ONE
- 2. Reporting period: JANUARY, 1990
-3.. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric. Rating ~(Net MWe): 1065
- 6. Maximum Dependable. Capacity.(Gross MWe): 1098.4
.l
- 7. Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 I
=Through 7) Since Last Report, Give Reason: N/A r
~
9.
Power Level To which Restricted, If Any (Net MWe): N/A E
- 10.. Reason'For. Restrictions, If Any: N/A
.I i
THIS YEAR-TO
[
MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 744.0 744 135968 ]
'12..-Hours Reactor _Was: Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 L
L14. Hours Generator On Line 0.0 0
58267-L 15.DUnit Reserve Shutdown Hours 0.0 0
0 s
L
.16.' Gross Thermal Generation (MWh) 0.0 0
168066787-l
- 17. Gross-Electric Generation (MWh) 0.0 0
55398130
-18.' Net Electric Generation (MWh)
-1393.0
-1393 53581695-
- 11. Unit Service Factor 0.0 0.0 42.9 l
220. Unit Availability Factor 0.0 0.0 42.9 L
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 37.0 L
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 37.0 lc
- 23. Unit Forced Outage Rate 100.0 100.0 50.3 a
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration cf Each):
25~ If Shut Down At End Of Reporting Period, Estimated Date 0f Startup: To be determined hkk kObb
[9 l
f OPERATING DATA REPORT-
.i DOCKET.NO.
50-260-DATE
.JAN 90 PREPARED BY S.A.RATLIFF TELEPHONE-205-729-2937 T
OPERATING: STATUS i
'1. Unit Name: BROWNS FERRY UNIT TWO i
L
'2.' Reporting-period: JANUARY, 1990 P
3.-Licensed, Thermal: Power (MWt): 3293 4.
Nameplate Rating.(Gross MWe): 1152
-_5'.
Design Electric Rating (Net MWe): 1065
- 16. Maximum Dependable Capacity-(Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065 8.fIf Changes Occur in Capacity Ratings (Items Number 3 Through 7).Since Last Report, Give Reason: N/A 9.EPower Level To which Restricted, If Any (Net MWe): N/A
'10.-Reason For Restrictions, If Any: N/A THIS-YEAR-TO MONTH DATE CUMULATIVE
[
- 11. Hours In Reporting Period 744.0 744
~130855 - l-i
- 12. Hours; Reactor Was Critical
' 0i. 0 0
55860
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200 ii
- 14. Hours-Generator On Line-0.0-0 54338
- 15. Unit. Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
153245167 17.EGross Electric Generation =(MHh) 0.0 0
50771798 18.' Net Electric Generation (MWh)
-5775.0
-5775
'49108649
.19. UnitJService Factor 0.0 0.0 41.5 y
- 20. Unit Availability Factor 0.0 0.0 41.5 4
l21k Unit Capacity. Factor (MDC Net) 0.0 0.0 35.2 22.. Unit Capacity Factor (DER Net) 0.0 0.0 35.2 23'. Unit 1 Forced Outage Rate' 100.0 100.0 50.3 L
- 24. Shutdowns Scheduled Over Next 6 Month
}
-(Type,-Date, and Duration of Each):
L '
\\
12 5. If Shut Down At End Of Reporting Period, l
Estimated Date Of Startup; September 1989 1
4-o OPERATING DATA REPORT' l
L DOCKET NO.-
50-296 DATE-JAN 90 PREPARED BY-S.A.RATLIFF TELEPHONE 205-729-2937 1
i
' OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT THREE
- 2. Reporting period: JANUARY, 1990
- 3. Licensed-Thermal Power (MWt): 3293 t
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065 L
- 6. Maximum Dependable Capacity (Gross MWe)
- 1098.4 l-
- 7. Maximum Dependable. Capacity (Net MWe): 1065 l
- 18. If' Changes occur in Capacity Ratings.(Items Number 3 Through 7) Since Last Report, Give Reason: N/A l
1 L
'9.
Power. Level To which Restricted, If Any (Net MWe)': N/A 10.- Reason For Restrictions, If Any: N/A i-R THIS YEAR-TO MONTH-DATE CUMULATIVE
- c.,
l
- 11. Hours In Reporting Period 744.0 744-
.113280 l.
L
.12. Hours Reactor Was Critical 0.0 0
45306 i
'13. Reactor Reserve Shutdown Hours 0.0 0
-5150
- 14. Hours Generator On Line 0.0 0
'44195
- 15. Unit Reserve Shutdown Hours 0.0 0
0'
- 1<6. Gross Thermal Generation (MWh) 0.0 0
131868267 1
17.. Gross Electric Generation (MWh) 0.0 0
43473760
[
- 18. Net Electric Generation (MWh)
-2367.0
-2367
-41992666 l
- 19. Unit Service Factor 0.0 0.0 39.0
- 20. Unit Availability Factor-0.0 0.0 39.0
- 21. Unit Capacity l Factor (MDC Net) 0.0 0.0 34.8
- 22. Unit: Capacity = Factor (DER Net) 0.0 0.0 34.8
,23. Unit Forced Outage Rate 100.0 100.0 54.2 24.-Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
l25. If Shstt Down At End Of Reporting Period,
' Estimated Date Of Startup: To be determined i