ML20042F381

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Rept for Mar 1989 for Browns Ferry Units 1,2 & 3
ML20042F381
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/31/1989
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20042F373 List:
References
NUDOCS 9005080260
Download: ML20042F381 (3)


Text

_

4 OPERATING DATA REPORT DOCKET NO.

50-259 DATE MAR 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS 1.. Unit Name: BROWNS FERRY UNIT ONE

2. Reporting period: MARCH, 1989 l
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design-Electric Rating (Not MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 t

Through 7) Since Last Report, Give Reasont N/A 9.

Power Level To which Restricted, If Any (Net MWe): N/A

10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 744.0 2160 128624
12. Hours Reactor Was Critical 0.0 0

59521 l

13. Reactor Reserve Shutdown Hours 0.0 0

6997

14. Hours Generator On Line 0.0 0

58267 l

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (MWh) 0.0 0

55398130

18. Net Electric Generation (MWh)

-5109.0

-14227 53613643

19. Unit Service Factor 0.0 0.0 45.3
20. Unit Availability Factor 0.0

'.0 45.3 21.' Unit Capacity Factor (MDC Not) 0.0 0.0 39.1

22. Unit Capacity Factor (DER Net) 0.0 0.0 39.1
23. Unit Forced Outage Rate 100.0 100.0 47.0 24.-Shutdowns Scheduled over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Porlod, Estimated Date-Of Startup: To be determined 9005000260 900D02 PDR f4 DOCK 05000259 R

PDC e

i j

OPERATING DATA REPORT 1

DOCKET NO.

50-260 l

DATE MAR 89 i

PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT TWO 2.:T.eporting period: MARCH, 1989 3.. Licensed Thermal Power (MWt) : 3293
4. Nameplate Rating (Gross MWe): 1152
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4

.i

7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours-In Reporting Period 744.0 2160 123511 l
12. Hours Reactor Was Critical 0.0 0

55860

13. Reactor Reserve Shutdown Hours 0.0 0

14200'

14. Hours Generator on Line 0.0 0

54338

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

153245167

17. Gross Electric Generation (MWh) 0.0 0

50771798

18. Net Electric Generation (MWh)

-2005.0

-6626 49151922

19. Unit Service Factor 0.0 0.0 44.0
20. Unit Availability Factor 0.0 0.0 44.0
21. Unit Capacity Factor (MDC Net) 0.0 0.0 37.4
22. Unit Capacity Factor (DER Net) 0.0 0.0 37.4
23. Unit Forced Outage Rate 100.0 100.0 46.7
24. Shutdowns Scheduled Over Next 6 Month (Type, Date,-and Duration of Each):

25..If Shut Down At End Of Reporting Period, Estimated Date Of Startup: September 1989

i OPERATING DATA REPORT 1

i DOCKET NO.

50-296 DATE MAR 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 i

OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT THREE
2. Reporting period: MARCH, 1989
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152 5.

Design Electric Rating (Net MWe): 1065

6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. Maximum Dependable Capacity (Net MWe): 1065
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A P

THIS YEAR-TO MONTH DATE CUMULATIVE 11.' Hours In Reporting Period 744.0 2160 105936

]

12. Hours Reuetor Was critical 0.0 0

45306

13. Reactor' Reserve Shutdown Hours 0.0 0

5150 14 Hours Generator On Line 0.0 0

44195 15.' Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

131868267 17.. Gross Electric Generation (MWh) 0.0 0

43473760

18. Net Electric Generation (MWh)

-1590.0

~5023 42011907 19.. Unit Service Factor 0.0 0.0 41.7

20. Unit Availability Factor 0.0 0.0 41.7
21. Unit Capacity Factor (MDC Net) 0.0 0.0 37.2
22. Unit Capacity Factor (DER Net) 0.0 0.0 37.2
23. Unit Forced Outage Rate 100.0 100.0 50.5
24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
25. If Shut Down At End Of Reporting Period, l

Estimated Date Of Startup: To be determined l

l l

-