Corrected Operating Data Rept for Jan 1989 for Browns Ferry Units 1,2 & 3
ML20042F376
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/31/1989
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20042F373 List:
References
NUDOCS 9005080254
Download: ML20042F376 (3)


Text

~.

f 4

i OPERATING DATA REPORT DOCKET NO.

50-259 DATE JAN 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT ONE l
2. Reporting period: JANUARY, 1989
3. Licensed Thermal Power (MWt): 3293 4.-Nameplate Rating (Gross MWe): 1152
5. Design Electric Ratl.*] (Net MWe): 1065 I
6. Maximum Dependable Capacity (Gross MWe): 1098.4
7. !!aximum Dependable capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A

9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A e

THIS YEAR-TO MONTH DATE CUMULATIVE

11. Hours In Reporting Period 744.0 744 127208 l
12. Hours Reactor Was Critical 0.0 0

59521

13. Reactor Reserve Shutdown Hours 0.0 0

6997

14. Hours Generator On Line 0.0 0

58267

-15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Generation (MWh) 0.0 0

168066787

17. Gross Electric Generation (MWh) 0.0 0

55398130

18. Net Electric Generation (MWh)

-4888.0

-4888 53622982

19. Unit Service Factor 0,0 0.0 45.8 i
20. Unit Availability Factor 0.0 0.0 45.8 l
21. Unit Capacity Factor (MDC Net) 0.0 0.0 39.6 22.-Unit Capacity Factor (DER Net)
0. 0 -

0.0 39.6

23. Unit Forced Outage Rate 100.0 100.0 46.3

-24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

q

25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined o

l I

9005080204 900502 i

PDR ADOCK 05000259 i

R PDC j

a

L.

N

+

OPERATING DATA REPORT 1

DOCKET NO.

50-260 l

DATE JAN 89

]

PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 i

OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT TWO
2. Reporting period: JANUARY, 1989 l
3. Licensed Thermal Power (MWt): 3293 2
4. Nameplate Rating (Gross MWe): 1152

'5.

Design Electric Rating (Net MWe): 1065 l

6. Max! mum Dependable Capacity (Gross MWe): 1098.4
7. Maxi:aum Dependable Capacity (Net MWe): 1065 8.

If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9i Power Level To which Restricted, If Any (Net MWe): N/A

10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours in Reporting Period 744.0 744 122095 l
12. Hours Reactor Was Critical 0.0 0

55860

13. Reactor Reserve Shutdown Hours 0.0 0

14200

14. Hours Generator on Line 0.0 0

54338

15. Unit ' Reserve Shutdown Hours 0.0 0

0

,16. Gross Thermal Generation (MWh) 0.0 0

153245167 17.. Gross Electric Generation (MWh) 0.0 0

50771798

-18. Net Electric Generation (MWh)

-2238.0

-2238 49156310-

19. Unit Service Factor 0.0 0.0 44.5
20. Unit Availability Factor 0.0 0.0 44.5 i

i

21. Unit Capacity Factor (MDC Net) 0.0 0.0 37.8 L22. Unit Capacity Factor (DER Net) 0.0 0.0 37.8
23. Unit Forced Outage Rate 100.0 100.0 45.9
24. Shutdowns Scheduled Ov6e Next 6 Month (Type, Date, and Durocion of Each):
25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: September 1989 l

l l

1 l

l J

)

)

L OPERATING DATA REPORT 1

l DOCKET NO.

50-296 DATE JAN 89 PREPARED BY S.A.RATLIFF l

TELEPHONE 205-729-2937 l

OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT THREE i
2. Reporting period: JANUARY, 1989
3. Licensed Thermal Power (MWt): 3293

-4. Nameplate Rating (Gross MWe): 1152

5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4
5. Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 o

Through 7) Since Last Report, Cive Reason: N/A 9.

Power Level To which Restricted, If Any (Net MWe): N/A

10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
11. Hours In Reporting Period 744.0 744 104520 l
12. Hours Reactor Was Critical 0.0 0

45306 13.' Reactor Reserve Shutdown Hours 0.0 0

5150

14. Hours Generator On Line 0.0 0

44195

15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross Thermal Geteration (MWh) 0.0 0

131868267

17. Gross Electric Generation-(MWh) 0.0 0

43473760 18.' Net Electric Generation (MWh)

-1855.0

-1855 42015075

-19. Unit Service Factor 0.0 0.0 42.3

20. Unit Availability Factor 0.0 0.0 42.3
21. Unit Capacity Factor (MDC Pet) 0.0 0.0 37.7 3
22. Unit Capacity Factor (DER Met) 0.0 0.0 37.7 l
23. Unit-Forced Outage Rate 100.0 100.0 49e7

^

24.. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined