ML20042F393
| ML20042F393 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 06/30/1989 |
| From: | Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20042F373 | List: |
| References | |
| NUDOCS 9005080272 | |
| Download: ML20042F393 (3) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-259 DATE JUNE 89 PREPARED BY S. A. RATLIFF i
. TELEPHONE 205-729-2937 j
OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT ONE
- 2. Reporting period: JUNE, 1989
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe): 1065
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe)t N/A
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 720.0 4343 130807 l
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0
.0 58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh)
-5166.0
-29642 53598228
- 19. Unit Service Factor 0.0 0.0 44.5 l
- 20. Unit Availability Factor 0.0 0.0 44.5 l
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 38.5 22.-Unit Capacity Factor (DER Net) 0.0 0.0 38.5 23.' Unit Forced Outage Rate 100.0 100.0 48.0
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
.25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined i
l 9005080272 +00502 PDR ADOCK 05000259 R
PDC q
1 J
l-
]
OPERATING DATA REPORT DOCKET NO.
50-260 DATE JUNE 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT TWO l
- 2. Reporting' period: JUNE, 1989
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4 1
- 7. Maximum Dependable Capacity (Net MWe): 1065 1
8.
If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reason: N/A I
- 9. Power Level To which Restricted, If Any (Net KWe): N/A
- 10. Reason For Restrictions, If Any: N/A f
THIS YEAR-TO MONTH DATE CUMULATIVE
- 11. Hours In Reporting Period 720.0 4343 125694 l
- 12. Hours Reactor Was Critical 0.0 0
55860
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200
- 14. Hours Generator on Line 0.0 0
54338
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
153245167
- 17. Gross Electric Generation (MWh) 0.0 0
50771798
- 18. Net Electric Generation (MWh)
-2007.0
-12713 49145835 i
- 19. Unit Service Factor 0.0 0.0 43.2
- 20. Unit Availability Factor 0.0 0.0 43.2
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 36.7
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 36.7
- 23. Unit Forced Outage Rate 100.0 100.0 47.8
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: September 1989 L
p OPERATING DATA REPORT i
DOCKET NO.
50-296 DATE JUNE 89 PREPARED BY S.A.RATLIFF TEIT. PHONE 205-729-2937
+
OPERATING STATUS
- 1. Unit:Name: BROiNS FERRY UNIT THREE 2'. Reporting period: JUNE, 19 D, 3.. Licensed Thermal Power (MWtf: 3293 4
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net.MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
- 7. Maximum Dependable Capacity (Net MWe) :.1065 8.
If Changes occur in capacity. Ratings (Items Number 3 T).raugh. 7) Since Last Report, Give Reason: N/A 9.
Power Lovel To which Restricted, If Any (Net MWe):.N/A
- 10. Reason'For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE' CUMULATIVE
}
- 11. Hours In Reporting Period 720.0 4343 108119
,12. Hours Reactor Was Critical 0.0 0-45306 13.-Reactor Reserve Shutdown Hours 0.0 0
5150
- 10. Hours Generator On'Line 0.0 0
44195
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
131868267
- 17. Gross Electric Generation (MWh) 0.0 0
43473760
- 18. Net. Electric Generation (MWh)
-1679.0
-9588
'42007342
- 19. Unit Service Factor 0.0 0.0 40.9' 20.= Unit Availability Factor 0.0 0.0 40.9-21.. Unit Capacity Factor (MDC Net) 0.0 0.0 36.5
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 36'5
- 23. Unit Forced Outage Rate 100.0 100.0 51.7
- 24. Shutdowns Scheduled Over Next 6 Month
-(Type, Date, and Duration of Each):
' 2 5 '. If. Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined
)
l
.__.__...