ML20042F399
| ML20042F399 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/30/1989 |
| From: | Ratliff S TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20042F373 | List: |
| References | |
| NUDOCS 9005080281 | |
| Download: ML20042F399 (3) | |
Text
-
OPERATING DATA REPORT DOCKET NO.
50-259 DATE SEPT 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS i
- 1. Unit Name: BROWNS FERRY UNIT ONE l
2 :. Reporting period: AUGUST, 1989 3.' Licensed Thermal Power'(MWt): 3293 l
- 4. Nameplate Rating (Gross MWe): 1152 i
L 5.' Design Electric Rating-(Net MWe): 1065 6.-Maximum Dependable Capacity (Gross MWe): 1098.4 4
- 7. Maximum Dependable Capacity (Net MWe): 1065 i
8.
If Changes Occur in Capacity Ratings (Items. Number 3-
)
Through 7) Since Last Report, Give Reason: N/A l
L 9.
Power Level'To which Restricted, If Any (Net MWe): N/A L
- 10. Reason For Restrictions, If Any: N/A J
1l
-}
THIS
-YEAR-TO MONTH DATE CUMULATIVE il. Hours In Reporting Period 744.0 5831 132295 l
I
'12. Hours Reactor Was Critical
-0.0 0
59521
-l 13.' Reactor Reserve Shutdown Hours 0.0 0
6997
- 14. Hours Generator On Line 0.0
-O 58267 l
15.-Unit. Reserve Shutdown Hours 0.0 0
0.
1 16.~ Gross' Thermal Generation (MWh) 0.0 0
168066787
- 17. Gross Electric Generation (MWh) 0.0 0
55398130 I
- 18. Net Electric. Generation (MWh)
-2041.0
-36147
'53591723
'19. Unit Service Factor 0.0 0.0 44.0 I
.20. Unit Availability Factor 0.0 0.0 44.0
- 21. Unit = Capacity Factor _(MDC' Net) 0.0 0.0
.3.0 8
22'. Unit Capacity Factor (DER Net) 0.0 0.0 38.0
- 23. Unit Forced Outage Rate 100.0 100.0 48.7
- 24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
(
- 25. If Shut Down At End Of Reporting Period, t
' Estimated Date Of Startup: To be determined 9005080281 900502 PDR ADOCK 05000259 R
~
i 4
(
OPERATING DATA REPORT-i DOCKET NO.
50-260 s
DATE SEPT 89-PREPARED BY S.A.RATLIFF.
TELEPHONE-205-729-2937 i
i OPERATING STATUS
.1.~ Unit Name: BROWNS FERRY UNIT:TWO
- 2. Reporting period: AUGUST, 1989
- 3. Licenseo Thermal Power (MWt): 3293 4.-Nameplate Rating (Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
~6. Maximum Dependable Capacity (Gross MWe): 1098.4 7.-Maximum Dependable Capacity (N?t MWe):.1065
'8..If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 9.LPower Level To which Restricted, If Any (Net MWe): N/A
- 10. Reason For Restrictions, If-Any: N/A THIS YEAR-TO J
MONTH DATE CUMULATIVE 11.-Hours In Reporting Period 744.0 5831 127182 l~
12.: Hours Reactor Was Critical 0.0 0
55860 13 '. Reactor Reserve Shutdown Hours 0.0 0
14200 j
- 14. Hours Generator On Line 0.0 0
54338
- 15. Unit Reserve Shutdown Hours 0.0 0
0 16.JGross Thermal Generation (MWh) 0.0 0
153245167 l'. Gross Electric Generation (MWh) 0.0 0
50771798 7
- 18. Net Electric Generation (MWh)
-5725.0
-21917
'49136631
- 19. Unit Service Factor 0.0 0.0 42.7
- 20. Unit Availability Factor 0.0 0.0 42.7 J21. Unit Capacity Factor.(MDC Net) 0.0
- 0. 0 -
36.3 2 2 ~. Unit Capacity Factor (DER Net) 0.0 0.0 36.3 23.l Unit Forced Outage' Rate 100.0 100.0 48.5 24~.' Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period,
! Estimated Date of Startup: September 1989 s
5 s
'O OPERATING DATA REPORT DOCKET NO.
50-296 DATE SEPT 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 t,
^PEPATING STATUS
- 1. Unit Name: ' BROWNS FERRY UNIT THREE
.l 2.' Reporting period: AUGUST, 1989 3.~ Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating'(Gross MWe): 1152 5.
Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
~7..' Maximum Dependable Capacity (Net MWe): 1065 8.EIf Changes Occur in Capacity Ratings (Items Number 3
- Through 7) Since Last Report, Give Reason: N/A 1
9.
Power Level Tc which Restricted, If Any (Net MWe): N/A
'10. Reason-For Restrictions, If Any: N/A
-i THIS YEAR-TO MONTH DATE CUMULATIVE
-11. Hours In Reporting Period 744.0 5831 109607 -l i"
12.. Hours Reactor Was Critical-0.0 0
45306 l13. Reactor Reserve Shutdown-Hours 0.0 0
5150
- 14. Hours Generator On Line 0.0 0
44195:
~
15.' Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
131868267:
17... Gross Electric Generation (.MWh) 0.0 0
43473760 2 18. Net Electric. Generation (IC4h)
-2521.0
-14059 42002871
- 19. Unit Service Factor 0.0 0.0 40.3 20.-Unit Availability Factor 0.0 0.0 40.3
.21. Unit Capacity Factor (MDC Net) 0.0 0.0 36.0-
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 36.0
- 23. Unit Forced Outage Rate 100.0 100.0 52.4~
- 24. Shutdowns: Scheduled Over Next 6 Month (Type, Date, and Duration of Each):
R25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined
_.,