ML20042F395

From kanterella
Jump to navigation Jump to search
Corrected Operating Data Rept for Aug 1989 for Browns Ferry Units 1,2 & 3
ML20042F395
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/1989
From: Ratliff S
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20042F373 List:
References
NUDOCS 9005080275
Download: ML20042F395 (3)


Text

__

,e-OPERATING DATA REPORT l

DOCKET W.

50-259 DATL AUG A9 PREPAFEP EY 0. A. '.<,I.f LI FF TELEPHOW 235-729-2937 OPERATING STATUS j

1. Unit-Name: BROWNS TERRY UNIT ONE
2. Reporting period: JULY, 1989
3. Licensed-Thermal Power-(MWt): 3293
4. Nameplete Rating (Gross MWe): 1152 j
5. Design Electric Rating (Net MWe): 1065
6. Maximum Dependable Capacity (Gross MWe): 1098.4 i
7. Maximum Dependable' Capacity'(Net MWe): 1065 1

8.'If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A i

9. Power Level To'which Restricted, If Any-(Net MWe): N/A
10. Reason For Restrictions, If Any: N/A j

i 4

THIS YEAR-TO MONTH DATE

-CUMULATIVE j

11. Hours In Reporting Period 744.0 5087 131551
12. Hours Reactor'Was Critical 0.0

-0 59521

13. Reactor: Reserve Shutdown Hours 0.0 0

6997' 3 14 Hours Generator.On Line-0.0 0

58267 3

15. Unit Reserve Shutdown Hours 0.0 0

0 l

16. Gross-Thermal Generation (MWh) 0.0

'O 168066787

'17. Gross Electric Generation (MWh) 0.0 0

=SS398130 l

'18.. Net Electric Generation (MWh).

-4464.0

-34106 53593764 l

L19. Unit Service Factor 0.0 0.0 44.3

20. Unit Availability Factor 0.0 0.0 44.3'

'21., Unit Capacity Factor (MDC Net) 0.0 0.0 38.3

22. Unit' Capacity Factor (DER Net) 0.0 0.0 38.3 4

-23. Unit Forced Outage Rate 100.0 100.0 48.4

-24. Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

25. If Shut Down At End Of Reporting Period,

. Estimated Date Of Startup: To be determined

~

9005080275 900502 j

PDR ADOCK 05000259 l

R PDC l

s OPERATING DATA REPORT i

DOCKET NO.

'50-260 DATE AUG 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937-1 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT TWO l
2. Reporting period: JULY, 1989 j
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe): 1152 5.

Design Electric Rating (Net MWe): 1065 6.: Maximum Dependable. capacity (Gross MWe): 1098.4 l

7.. Maximum Dependable Capacity (Net MWe): 1065

}

'8.

If Changes occur in_ Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A 1

9.

Power Level To which Restricted, If Any (Net MWe): N/A

]

10. Reason For Restrictions, If Any: N/A j

1 i

.[

THIS YEAR-TO l

MONTH DATE CUMULATIVE

11. Hours In Reporting Period 744.0 5087 126438 l
12. Hours; Reactor Was Critical 0.0 0 ~

55860

13. Reactor Reserve-Shutdown Hours 0.0 0

14200 1

14.cHours Generator On Line 0.0 0

54338

j

'15. Unit Reserve Shutdown Hours 0.0 0

0

16. Gross. Thermal Generation (MWh) 0.0 0

153245167

-i

17. Gross Electric Generation (MWh) 0.0 0

50771798 18'.-Net Electric Generation (MWh)

-3479.0

-16192 49142356

19. Unit Service Factor 0.0 0.0-43.0 20.1 Unit Availability Factor 0.0 0.0 43.0 21.. Unit Capacity Factor (MDC Net) 0.0 0.0 36.5

-22. Unit CapLcity Factor (DER Net) 0.0 0.0 36.5

23. Unit Forced Outage Rate 100.0 100.0 48.2 24.' Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

l 25..If Shut Down At End Of Reporting Period, Estimated Date of Startup: September 1989

V

[:

OPERATING DATA REPORT DOCKET NO.

50-296 DATE AUG 89 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS

1. Unit Name: BROWNS FERRY UNIT THREE 2.. Reporting period:JULN, 1989
3. Licensed Thermal Power (MWt): 3293
4. Nameplate Rating (Gross MWe):'1152
5. Design Electric Rating (Net MWe): 1065 6.-Maximum Dependable Capacity (Gross MWe): 1098.4 7'. Maximum Dependable Capacity (Net MWe): 1065 8.

If Changes occur in Capacity Ratings _(Items Number 3 Through.7) Since Last Report, Give Reason: N/A

9. Power Level To which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE 11.' Hours In Reporting' Period 744.0 5087 108863-l 12.-Hours Reactor Was Critical 0.0 0~

45306

13. Reactor. Reserve Shutdown Hours 0.0 0'

5150

14. Hours Generator On Line 0.0.

0 44195 15.. Unit Reserve Shutdown Hours 0.0 0

01

~16. Gross-Thermal Generation (MWh) 0.0 0

131868267 17.' Gross Electric Generation (MWh) 0.0 0

43473760-

16. Net. Electric Generation (MWh)

-1950.0

-11538 42005392

19. Unit Service Factor 0.0 0.0 40.6
20. Unit Availability Factor 0.0 0.0 40.6

-21. Unit Capacity Factor (MDC Net) 0.0 0.0 36'.2 22.< Unit Capacit y Factor (DER Net) 0.0 0.0 36.2 23.-Unit Forced Jutage Rate 100.0 100.0 52.0

-24.-Shutdowns Scheduled Over Next 6 Month (Type, Date, and Duration of Each):

'25.

If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined

,